NRC 2016-0026, Refueling Outage U1 R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations

From kanterella
Jump to navigation Jump to search
Refueling Outage U1 R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations
ML16182A172
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 06/30/2016
From: Woyak B
Nextera Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2016-0026
Download: ML16182A172 (5)


Text

June 30, 2016 NRC 2016-0026 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Unit 1 Docket 50-266 Renewed License No. DPR-24 Refueling Outage U1 R36 Owner's Activity Report for Class 1, 2, 3 and MC lSI Examinations NextEra Energy Point Beach, LLC (NextEra) is submitting inservice inspection summary reports for inspections conducted prior to and during the Point Beach Nuclear Plant (PBNP) refueling outage U 1R36 that concluded on April 5, 2016. The enclosed report is submitted pursuant to the requirements of Subarticle IWA-6240 of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code and ASME Code Case N-532-5.

The Enclosure to this letter contains the summary report, Form OAR-1, "Owner's Activity Report" for inservice inspections for Class 1, 2, 3 and MC components. The report is for the first outage of the second period of the fifth ten-year interval for Class 1, 2, 3 systems and the second outage for the third period of the second ten-year interval for MC components at PBNP Unit 1.

Very truly yours, NextEra Energy Point Beach, LLC Bryan Woyak Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW Mike Verhagen, State of Wisconsin NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 1 OAR-1, OWNER'S ACTIVITY REPORT FOR CLASS 1, 2, 3 AND MC lSI EXAMINATIONS 3 pages follow

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: U 1R36 Outage for Class 1, 2, 3 and MC lSI Examinations Plant: NextEra Energy Point Beach Nuclear Power Plant Unit 1 6610 Nuclear Road Twin Rivers, Wisconsin 54241 Commercial Service Date: December 1970 Refueling Outage No.: U1 R36 Current Inspection Interval: lSI-Fifth, IWE-Second Current Inspection Period: lSI-Second, IWE-Third Edition and Addenda of Section XI applicable to the inspection plans: lSI - 2007 Edition through 2008 Addenda.

IWE- 2001 Edition through 2003 Addenda Date and revision of inspection plans: lSI- February 16,2016, Revision 14 IWE -August 15,2014 Revision 5 Edition and Addenda of Section XI applicable to repairs/replacements, if different than the inspection plan: Same Code Cases used for ins ection and evaluation: N-722-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U 1 F}~.*.*,13<?.!Jf~rm to t~e re9~irements of Section XI.

v/j\ 1:1 .. /1 / /

Signed !kJ/! f~A_J,~!. .l*:~? Date -r------'-___:__ __

ifwner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspectioll....,


f>ii=P=;ip.,.q:.....::::~=--:-"-:::-=-__::__-*----'-"'t:,------Commissions.

~"'""' Slg"'t"rn

_ _:-'-:N:. : B: . . . :. !12=.,6: : :9: : :2:. .!.A'""'.: ':.N'-I -!....1.;--::::W'-'--'--1~92: : .:9: :.>6~2'" '5-=-.,- - - - -,-

Notio"'t BO'td, State, Pto~ooo, ood Eodomemeo" Date --t&-0+---'<>/Jt!l~li+-1)/7-A--b- -

1 of3

FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description None None None 2 of3

FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Description Date Repair/Replacement Code Class Item Description of Work Completed Plan Number Hanger 2 Replaced missing nut on hanger 2/10/2016 2016-0003 CH-2502-03-H 12 1 Valve 1CV-2008 Replaced valve due to through wall leakage 4/2/2016 2016-0023 3 of3