NRC 2016-0004, Refueling Outage U2R34 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations

From kanterella
Jump to navigation Jump to search
Refueling Outage U2R34 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations
ML16026A460
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 01/26/2016
From: Woyak B
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2016-0004
Download: ML16026A460 (5)


Text

January 26, 2015 NRC 2016-0004 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Unit 2 Docket 50-301 Renewed License No. DPR-27 Refueling Outage U2R34 Owner's Activity Report for Class 1, 2, 3 and MC lSI Examinations NextEra Energy Point Beach, LLC (NextEra) is submitting inservice inspection summary reports for inspections conducted prior to and during the Point Beach Nuclear Plant (PBNP) refueling outage U2R34 that concluded on October 30, 2015. The enclosed report is submitted pursuant to the requirements of Subarticle IWA-6240 of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code and ASME Code Case N-532-5.

The Enclosure to this letter contains the summary report, Form OAR-1, "Owner's Activity Report" for inservice inspections for Class 1, 2, 3 and MC components. The report is for the first outage of the second period of the fifth ten-year interval for Class 1, 2, 3 systems and the second outage for the third period of the second ten-year interval for MC components at PBNP Unit 2.

Very truly yours, NextEra Energy Point Beach, LLC

~~

Bryan Woyak Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW Mike Verhagen, State of Wisconsin NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 2 OAR-1, OWNER'S ACTIVITY REPORT FOR INSERVICE INSPECTION, FOR CLASS 1, 2, 3 AND MC COMPONENTS 3 pages follow

FORM OAR~1 OWNER'S ACTIVITY REPORT Report Number: U2R34 Outage Class 1, 2, 3 and MC lSI Examinations Plant: NextEra Energy Point Beach Nuclear Plant 6610 Nuclear Road Twin Rivers, Wisconsin 54241 Unit: 2 Commercial Service Date: October 1, 1972 Refueling Outage No.: U2R34 Current Inspection Interval: ISI~5TH ~ IWE~2ND Current Inspection Period: ISI~2N° - IWE~3RD Edition and Addenda of Section XI applicable to the inspection plans: lSI ~ 2007 Edition through 2008 Addenda.

IWE- 2001 Edition through 2003 Addenda Date and Revision of inspection plans: lSI- November 25, 2014, Revision 13 IWE- August 5, 2014 Revision 5 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: Same Code Cases used for ins ection and evaluation: N-532-5 N-706~1 N~722-1 N~751 N~753 & N~770~1.

CERTIFICATE OF CONFORMANCE l certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U2R34 conform to the requirements of Section XI.

Signed ----~---=--_,;'I?;,;;,...;_R;_,_;,""-'c..--<<--~"--.,....~~Y-/i'-/-c.c_c:;:_IZ_.a<._,-_t:;;:._;;;;y._~_R<_tlf_fl-

_ _ _ _ Date _ ___,/:~'-':1:'-1-.-;~'-'~'-'c"--~ 7 Owner or Owner's Designee, Title / '

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.


I<J:f<1r.~H\-7to~~P.s;~,...../vt'-'-a~tu" f!'-"lAt." " ' /.,'&'~" " J.ilr-'*____ Commissions_ _ ,.,.; :~t'i:-"o~=;':"6:~Bo=2a~'- !l'-"~c-':~":-'~- ,~ r,L-~_.,ol~,._ce+(-ljl-~n" ~:-:i:bn-f.i7>-rs-em-en-="ts Date --~-~-1-/.L.f! ~-f-J/L<.Q.b_ _

1 of3

FORM OAR~1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE U2R34- lSI -5th Interval, zND Period U2R34- IWE znd Interval, 3rd Period Examination Category and Item Number Item Description Evaluation Description None None None 2 of3

FORM OAR"1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE U2R34 - lSI -5th Interval, 2ND Period U2R34- IWE 2nd Interval, 3rct Period Description Date Repair/Replacement Code Class Item Description of Work Completed Plan Number OHX-128, 3 Weld Repair- Restore Min. Wall 2/17/15 2015-0004 CCW Heat OHX-12C, 3 CCW Heat Weld Repair- Restore Min. Wall 6/18/15 2015-0010 2HX-12D, 3 Weld Repair- Restore Min. Wall 7/10/15 2015-0011 CCWHeat OHX-13A, SFP 3 Heat Weld Repair- Restore Min. Wall 7/29/15 2015-0014 3 of3

January 26, 2015 NRC 2016-0004 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Unit 2 Docket 50-301 Renewed License No. DPR-27 Refueling Outage U2R34 Owner's Activity Report for Class 1, 2, 3 and MC lSI Examinations NextEra Energy Point Beach, LLC (NextEra) is submitting inservice inspection summary reports for inspections conducted prior to and during the Point Beach Nuclear Plant (PBNP) refueling outage U2R34 that concluded on October 30, 2015. The enclosed report is submitted pursuant to the requirements of Subarticle IWA-6240 of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code and ASME Code Case N-532-5.

The Enclosure to this letter contains the summary report, Form OAR-1, "Owner's Activity Report" for inservice inspections for Class 1, 2, 3 and MC components. The report is for the first outage of the second period of the fifth ten-year interval for Class 1, 2, 3 systems and the second outage for the third period of the second ten-year interval for MC components at PBNP Unit 2.

Very truly yours, NextEra Energy Point Beach, LLC

~~

Bryan Woyak Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW Mike Verhagen, State of Wisconsin NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 2 OAR-1, OWNER'S ACTIVITY REPORT FOR INSERVICE INSPECTION, FOR CLASS 1, 2, 3 AND MC COMPONENTS 3 pages follow

FORM OAR~1 OWNER'S ACTIVITY REPORT Report Number: U2R34 Outage Class 1, 2, 3 and MC lSI Examinations Plant: NextEra Energy Point Beach Nuclear Plant 6610 Nuclear Road Twin Rivers, Wisconsin 54241 Unit: 2 Commercial Service Date: October 1, 1972 Refueling Outage No.: U2R34 Current Inspection Interval: ISI~5TH ~ IWE~2ND Current Inspection Period: ISI~2N° - IWE~3RD Edition and Addenda of Section XI applicable to the inspection plans: lSI ~ 2007 Edition through 2008 Addenda.

IWE- 2001 Edition through 2003 Addenda Date and Revision of inspection plans: lSI- November 25, 2014, Revision 13 IWE- August 5, 2014 Revision 5 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: Same Code Cases used for ins ection and evaluation: N-532-5 N-706~1 N~722-1 N~751 N~753 & N~770~1.

CERTIFICATE OF CONFORMANCE l certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U2R34 conform to the requirements of Section XI.

Signed ----~---=--_,;'I?;,;;,...;_R;_,_;,""-'c..--<<--~"--.,....~~Y-/i'-/-c.c_c:;:_IZ_.a<._,-_t:;;:._;;;;y._~_R<_tlf_fl-

_ _ _ _ Date _ ___,/:~'-':1:'-1-.-;~'-'~'-'c"--~ 7 Owner or Owner's Designee, Title / '

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.


I<J:f<1r.~H\-7to~~P.s;~,...../vt'-'-a~tu" f!'-"lAt." " ' /.,'&'~" " J.ilr-'*____ Commissions_ _ ,.,.; :~t'i:-"o~=;':"6:~Bo=2a~'- !l'-"~c-':~":-'~- ,~ r,L-~_.,ol~,._ce+(-ljl-~n" ~:-:i:bn-f.i7>-rs-em-en-="ts Date --~-~-1-/.L.f! ~-f-J/L<.Q.b_ _

1 of3

FORM OAR~1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE U2R34- lSI -5th Interval, zND Period U2R34- IWE znd Interval, 3rd Period Examination Category and Item Number Item Description Evaluation Description None None None 2 of3

FORM OAR"1 OWNER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE U2R34 - lSI -5th Interval, 2ND Period U2R34- IWE 2nd Interval, 3rct Period Description Date Repair/Replacement Code Class Item Description of Work Completed Plan Number OHX-128, 3 Weld Repair- Restore Min. Wall 2/17/15 2015-0004 CCW Heat OHX-12C, 3 CCW Heat Weld Repair- Restore Min. Wall 6/18/15 2015-0010 2HX-12D, 3 Weld Repair- Restore Min. Wall 7/10/15 2015-0011 CCWHeat OHX-13A, SFP 3 Heat Weld Repair- Restore Min. Wall 7/29/15 2015-0014 3 of3