July 15, 2020 U. S. Nuclear Regulatory Commission ATTN: Document ControlDesk Washington, D. C. 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Report of Changes to Emergency Plan POINT BEACH NRC 2020-0018 10 CFR 50.54(q) 1 0 CFR 72.44.(f)
In accordance with 10 CFR 50.54(q)(5) and 1 0 CFR 72.44(f), NextEra Energy Point Beach, LLC (NextEra) hereby submits a description of changes to the Point Beach Nuclear Plant (PBNP)
Emergency Plan and a summary of the analysis demonstrating that the changes do not reduce
- the effectiveness of the plan. The plan continues to meet the requirements in 1 0 CFR 50 Appendix E and the planning standards of 10 CFR 50.47(b). The changes were incorporated in the following procedures issued June 24, 2020 at PBNP:
EP 3.0, Summary of Emergency Plan, Revision 28 EP 7.0, Emergency Facilities and Equipment, Revision 68 Description of Changes and Summary of Analysis EP 3.0 was revised to update specific commitments Point Beach has made with adopting to new revisions of NEI 99-01 Rev 6.
EP 7.0 was revised to remove area Dosimeter of Legal Record (DLR) radiation monitoring stations from additional onsite assessment equipment per AR 2338775 to clarify EP instrument surveillance requirements.
These changes were evaluated in accordance with 10 CFR 50.54(q)(3). The changes were determined to not reduce the effectiveness of the PBNP Emergency Plan.
This letter contains no new regulatory commitments or revisions to existing commitments. If you have any questions, please contact Denny Smith at 920-755-6001.
Sincerely, NextEra Energy Point Beach, LLC Eric Schultz Licensing Manager cc:
Incident Response Center, Region Ill Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241