NRC 2022-0004, Report of Changes to Emergency Plan

From kanterella
Jump to navigation Jump to search
Report of Changes to Emergency Plan
ML22040A037
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/09/2022
From: Schultz E
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2022-0004
Download: ML22040A037 (2)


Text

NEXTera ENERGY.

POINT BEACH

February 9, 2022 NRC 2022-0004 10 CFR 50.54(q)

U. S. Nuclear Regulatory Commission 10 CFR 72.44(f)

ATTN: Document Control Desk Washington, D. C. 20555-0001

Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27

Report of Changes to Emergency Plan

In accordance with 10 CFR 50.54(q)(5) and 10 CFR 72.44(f), NextEra Energy Point Beach, LLC (NextEra) hereby submits a description of changes to the Point Beach Nuclear Plant (PBNP)

Emergency Plan and a summary of the analysis demonstrating that the changes do not reduce the effectiveness of the plan. The plan continues to meet the requirements in 10 CFR 50 Appendix E and the planning standards of 10 CFR 50.47(b). The changes were incorporated in the following procedures issued January 26, 2021 at PBNP :

  • EP 5.0, Organizational Control of Emergencies, Revision 69
  • EP 6.0, Emergency Measures, Revision 68
  • EP 7.0, Emergency Facilities and Equipment, Revision 71

Description of Changes and Summary of Analysis

EP 5.0 was revised to replace pagers with the Electronic NARS System.

EP 6.0 was revised to replace paging system with the Electronic NARS System.

EP 7.0 replaced EMnet phone system with Electronic Notification System.

EP Appendix M removed SBCC for decontamination facilities. Replaced ERO Automated Notification System with ERNIE - Emergency Response Notifications of Incidents and Events. Replaced ERO Pagers with Corporate Emergency Response Notification System.

These changes were evaluated in accordance with 10 CFR 50.54(q)(3). These changes were determined to not reduce the effectiveness of the PBNP Emergency Plan.

Nex tEra Ene rgy Point Beach, LLC

6610 Nu c lear Road, Two Rivers, WI 54 241 Document Control Desk Page 2

This letter contains no new regulatory commitments or revisions to existing commitments. If you have any questions, please contact Denny Smith at 920 -755 - 6001.

Sincerely,

NextEra Energy Point Beach, LLC

Eric Schultz Licensing Manager

cc: Incident Response Center, Region Ill Res ident Inspector, Point Beach Nuclear Plant, USNRC