April 2, 2021 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 NEXTera ENERGY~
POINT BEACH NRC 2021-0011 TS 5.5.13 10 CFR 50.71 (e)
Technical Specification Bases and Technical Requirement Manual Change Summary In accordance with the requirements of Technical Specification (TS) 5.5.13 and 1 O CFR 50.71 (e),
NextEra Energy Point Beach, LLC (NextEra) is submitting a summary of changes made to the Point Beach Nuclear Plant TS Bases (TSB) and Plant Technical Requirements Manual (TRM) that did not require prior NRC approval.
The enclosure contains the TSB and TRM change summary for the period of October 1, 2019 through March 1, 2021.
This letter contains no new commitments and no revisions to existing commitments.
If you have any questions or require additional information, please contact me at (920) 755-7854.
Sincerely, NextEra Energy Point Beach, LLC Eric Schultz Licensing Manager Enclosure cc:
Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC 661 O Nuclear Road, Two Rivers, WI 54241
Affected Section 3.2.2 3.3.1 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL SPECIFICATION BASES (TSB) CHANGE
SUMMARY
FOR October 1, 2019 - March 1, 2021 Date of Affected Change Page(s)
Summary Removes the statement that this factor is calculated December B 3.2.21-at least every 31 EFPD. The frequency is in 2019 accordance with the surveillance frequency control proqram.
Corrected statement in the Applicability Section; Function 3. The statement, "The NIS intermediate range detectors do not provide any input to control system" is incorrect. The statement was revised to state, "The NIS intermediate range detectors also provide a signal to prevent automatic and manual rod December withdrawal prior to initiating a reactor trip. Limiting 2019 B 3.3.1-further rod withdrawal may terminate the transient and eliminate the need to trip the reactor."
Corrected statement in the Applicability Section to state that the Source Range Neutron Flux Trip may be manually bypassed above P-6 and is automatically bypassed above P-10.
Page 1 of 2
TECHNICAL REQUIREMENTS MANUAL (TRM) CHANGE
SUMMARY
FOR October 1, 2019 - March 1, 2021 Affected Date of Affected Section Change Page(s)
Summary TRM 4.9 12/17/2019 1-3 Administrative changes - revised procedure numbers and titles TRM 4.12 06/15/2020 All The changes update the document with the latest standards and recommendations for fuel oil trending and monitoring. There were also editorial and administrative chanQes.
TRM 4.15 09/23/2020 1
Regulatory Guide 1.163 was replaced with a reference to NEI 94-01 Revision 3-1 and the conditions and limitations specified in NEI 94-01 Revision 2-A, also added reference to ANSI/ANS-56.8-2002 for performing leakage testing TRM 3.5.1 10/13/2020 4-5 Revised BAST minimum combined volume in Table 3.5.1-1 and the required borated water volume from the RWST..
TRM 3.7.6 11/11/2020 2, 3, 4, 7, &
Extended surveillance intervals for IOPS, cross-over 8
steam dumps, turbine over-speed trip device, and turbine trip and stop valves.
TRM 2.1 Multiple Multiple This TRM (COLR) was issued to the NRC when it was revised TRM 2.2 Multiple Multiple This TRM (PTLR) was issued to the NRC when it was revised Page 2 of 2