NRC 2008-0043, Filing of Owner'S Inservice Inspection Summary Report for Refueling Outage U2R29

From kanterella
Jump to navigation Jump to search
Filing of Owner'S Inservice Inspection Summary Report for Refueling Outage U2R29
ML082180233
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 08/04/2008
From: Meyer L
Florida Power & Light Energy Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2008-0043
Download: ML082180233 (9)


Text

FPL Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 FPL Energy August 4, 2008 NRC 2008-0043 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Unit 2 Docket 50-301 License No. DPR-27 Filing of Owner's Inservice Inspection Summary Report for Point Beach Nuclear Plant Refueling Outaae U2R29 FPL Energy Point Beach, LLC, is submitting inservice inspection summary reports for inspections conducted prior to and during the Point Beach Nuclear Plant (PBNP) refueling outage U2R29 that concluded on May 10,2008. The enclosed Class 1,2 and 3 reports are submitted pursuant to the requirements of Subarticle IWA-6240 of the 1998 Edition with Addenda through 2000 of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code and ASME Code Case N-532-4. The IWE Class MC and IWL Class CC reports are submitted pursuant to the requirements of Subarticle IWA-6240 of the 2001 Edition with Addenda through 2003 of ASME Section XI and ASME Code Case N-532-4.

Enclosure Iof this letter contains the summary report, which includes Form OAR-1, "Owner's Activity Reports" for inservice inspections for the Class 1, 2 and 3 components. Enclosure 2 includes a separate Form OAR-1 for Class MC and CC components. The report is for the second outage of the second period of the fourth ten-year interval for Class 1, 2 and 3 systems, and the first outage of the first period of the second ten-year interval for Class MC and CC at PBNP Unit 2.

Very truly yours, FPL Energy Point Beach, LLC tarry Meyer Site Vice President Enclosures (2) cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW Mike Verhagen, State of Wisconsin

ENCLOSURE I FPL ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 2 OAR-1, OWNER'S ACTIVITY REPORT FOR INSERVICE INSPECTION FOR CLASS I , 2 AND 3 COMPONENTS 3 pages follow

FORM OAR- 1 0WNER'S ACTIVITY REPORT Report Number U2R29 Outage Class 1.2. and 3 IS1 Examination Plant FPLE Point Beach Nuclear Plant, 6610 Nuclear Road, Two Rivers, Wisconsin 54241 Unit No. 2 Commercial Service Date October 1, 1972 Refueling Outage No. U2R29 (If applicable)

Current Inspection Interval Fourth (lst, 2nd. 3rd, 4th, other)

Current Inspection Period Second (lst, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 1998 Edition 2000 Addenda Date and Revision of inspection plans November 2,2007 /Revision 6 Edition and Addenda of Section XI applicable to repairs/replacements activities, if different than the inspection plans Same Code Cases used: N-460. N-498-4 (CL 3 only), N-532-4, N-533-1, N-566-2, N-624 (If applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U2R29 (refueling outage number) conform to the requirements of Section XI.

Signed IS1 Coordinator Date 7 '22 - 8 0 G n e Z o w n e r ' s Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler of CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluations described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions WI 929625 A,I,N National Board, State, Province, and Endorsements Date I

w.88

Table 1 Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service Examination Category and ltem Number Item Description Evaluation Description Load identified as being low, accepted by F-A Spring Hanger civillstructural Engineering as being within allowable F1.20C tolerances Exam identified dents and a slightly loose bolt.

Civillstructural Engineering evaluated dents as being F-A 'Onstant in the cover and not affecting operation of the spring, F1.20C Support and the bolt has no identified function, therefore acceptable

Table 2 Abstract of RepairlReplacementActivities Required for Continued Service Repair1 Replacement Code Date Plan Class Item Description Description of Work Completed Number Replacement of process Containment 1 piping to eliminate any cycle 413012008 2008-0010 Penetration, CPP-28A fatigue concerns Replacement of process Containment 1 piping to eliminate any cycle 413012008 2008-0011 Penetration, CPP-28B fatigue concerns Replacement of process Containment 1 piping to eliminate any cycle 413012008 2008-0012 Penetration, CPP-28C fatigue concerns Bellowsleakdetection Replace cracked bellows 1 line for valve RC- 51812008 2008-0042 leak detection line 0043 1B Support replaced due to crack discovered during HX-1B SG Vent Line 2 replacement of bent 412912008 2008-0044 Sliding Support (equipment impact) SG vent line

ENCLOSURE 2 FPL ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNIT 2 OAR-1, OWNER'S ACTIVITY REPORT FOR INSERVICE INSPECTION FOR CLASS MC and CC COMPONENTS 3 pages follow

FORM OAR- 1 OWNER'S ACTIVITY REPORT Report Number U2R29 Outage Class MC, CC IS1 Examination Plant FPLE Point Beach Nuclear Plant, 6610 Nuclear Road, Two Rivers, Wisconsin 54241 Unit No. 2 Commercial Service Date October 1, 1972 Refueling Outage No. U2R29 (If applicable)

Current Inspection Interval Second (lst, 2nd, 3rd, 4th, other)

Current Inspection Period First (lst, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 2001 Edition 2003 Addenda Date and Revision of inspection plans September 7,2007 /rev 0 Edition and Addenda of Section XI applicable to repairslreplacements activities, if different than the inspection plans Same Code Cases used: N-532-4 (If applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repairlreplacement activities and evaluations supporting the completion of U2R29 (refueling outage number) conform to the requirements of Section XI.

Signed &v g m Owner or Owner's Designee, Title 1 IWE & IWL Promam Engineer Date 7-%z-ag CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler of CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repairlreplacement activities and evaluations described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Z Commissions WI 929625 A, I, N National Board, State, Province, and Endorsements

Table 1 Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service Examination Category and ltem Number Item Description Evaluation Description none

Table 2 Abstract of RepairIReplacement Activities Required for Continued Service Repair1 Replacement Date Plan Code Class Item Description Description of Work Completed Number Containment Replacement of process MC Penetration, piping to eliminate any cycle 413012008 2008-0010 2CPP-28A fatigue concerns Containment Replacement of process MC I Penetration, I piping to eliminate any cycle 1 413012008 1 2008-0011 1 2CPP-28B fatigue concerns Containment Replacement of process MC Penetration, piping to eliminate any cycle 413012008 2008-0012 2CPP-28C fatigue concerns Containment Replacement of process MC Penetration, piping to eliminate any cycle 413012008 2008-0013 2CPP-34B fatigue concerns Containment Replacement of process I MC I Penetration, I piping to eliminate any cycle 1 413012008 1 2008-0014 1 2CPP-34C fatigue concerns Containment Remove leak chase to I MC I Penetration, I prevent constrained 1 413012008 1 2008-0020 1 2CPP-28A pip'elthermal fatigue issue Containment Remove leak chase to I MC I Penetration, I prevent constrained 1 413012008 1 2008-0021 1 2CPP-28B pipe/thermal fatigue issue Containment Remove leak chase to I MC I Penetration, 1 prevent constrained 1 413012008 1 2008-0022 1 2CPP-28C pip'elthermal fatigue issue Containment Remove leak chase to I MC I Penetration, I prevent constrained 1 413012008 1 2008-0023 1 2CPP-28D pipelthermal fatigue issue Containment Remove leak chase to MC Penetration, prevent constrained 413012008 2008-0024 2CPP-34A pip'elthermal fatigue issue Containment Remove leak chase to MC Penetration, prevent constrained 413012008 2008-0025 2CPP-34B pipelthermal fatigue issue Containment Remove leak chase to MC Penetration, prevent constrained 413012008 2008-0026 2CPP-34C pipe/thermal fatigue issue Containment Remove leak chase to MC Penetration, prevent constrained 413012008 2008-0027 2CPP-34D pipelthermal fatigue issue