NRC 2021-0006, Report of Changes to Emergency Plan

From kanterella
Jump to navigation Jump to search
Report of Changes to Emergency Plan
ML21084A118
Person / Time
Site: Point Beach  
Issue date: 03/18/2021
From: Schultz E
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2021-0006
Download: ML21084A118 (2)


Text

March 18, 2021 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Report of Changes to Emergency Plan POINT BEACH NRC 2021-0006 10 CFR 50.54(q) 10 CFR 72.44(f)

In accordance with 10 CFR 50.54(q)(5) and 10 CFR 72.44(f), NextEra Energy Point Beach, LLC (NextEra) hereby submits a description of changes to the Point Beach Nuclear Plant (PBNP)

Emergency Plan and a summary of the analysis demonstrating that the changes do not reduce the effectiveness of the plan. The plan continues to meet the requirements in 1 O CFR 50 Appendix E and the planning standards of 1 O CFR 50.47(b). The changes were incorporated in the following procedure issued February 22, 2021 at PBNP:

EP 2.0, Emergency Plan Acronyms & Definitions, Revision 59 EP 5.0, Organizational Control of Emergencies, Revision 68 EP 6.0, Emergency Measures, Revision 67 EP 7.0, Emergency Facilities and Equipment, Revision 69 EP Appendix M, Matrix for Emergency Preparedness Equipment, Revision 11 EP CR Index, Emergency Plan Cross-Reference Index, Revision 19 Description of Changes and Summary of Analysis All above procedure changes were revised due to the implementation of Integrated Public Alert and Warning System (!PAWS) as primary alerting, retiring siren systems.

EP 6.0 had additional change due to Engineering Change 293123 Emergency Breathing Air (EBA) Abandonment and lengthening change out of DLR equipment established by Radiation Protection.

In addition, EP 2.0, EP 5.0 and EP 6.0 had editorial changes.

These changes were evaluated in accordance with 10 CFR 50.54(q)(3). These changes were determined to not reduce the effectiveness of the PBNP Emergency Plan.

This letter contains no new regulatory commitments or revisions to existing commitments. If you have any questions, please contact Denny Smith at 920-755-6001.

NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241

-Document Control Desk Page2 Sincerely, NextEra Energy Point Beach, LLC Eric Schultz Licensing Manager cc:

Incident Response Center, Region Ill Resident Inspector, Point Beach Nuclear Plant, USNRC