NRC 2017-0030, Refueling Outage U2R35 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations

From kanterella
Jump to navigation Jump to search
Refueling Outage U2R35 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations
ML17198A521
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 07/12/2017
From: Schultz E
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2017-0030
Download: ML17198A521 (6)


Text

NEXTera ENERGY S POINT BEACH July 12, 2017 NRC 2017-0030 10 CFR 50.55a U.S . Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Unit 2 Docket 50-301 Renewed License No. DPR-27 Refueling Outage U2R35 Owner's Activity Report for Class 1, 2, 3 and MC ISi Examinations NextEra Energy Point Beach, LLC (NextEra) is submitting inservice inspection summary reports for inspections conducted prior to and during the Point Beach Nuclear Plant (PBNP) refueling outage U2R35 that concluded on April 13, 2017. The enclosed report is submitted pursuant to the requirements of Subarticle IWA-6240 of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code and ASME Code Case N-532-5.

The Enclosure to this letter contains the summary report, Form OAR-1, "Owner's Activity Report" for inservice inspections for Class 1, 2, 3 and MC components . The report is for the second outage of the second period of the fifth ten-year interval for Class 1, 2, 3 systems and the first outage of the first period of the third ten-year interval for MC components at PBNP Unit 2.

Very truly yours, NextEra Energy Point Beach, LLC Eric Schultz Licensing Manager Enclosure cc: Administrator, Region Ill , USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW Kim Schmitt, DSPS Boilers, State of Wisconsin NextEra Energy Point Beach, LLC 661O Nuclear Road, Two Rivers , WI 54241

ENCLOSURE NEXTERA ENERGY POINT BEACH, LLO-POINT BEACH NUCLEAR PLANT, UNIT 2 OAR-1, OWNER'S ACTIVITY REPORT FOR INSERVICE INSPECTION, FOR CLASS 1, 2, 3 AND MC COMPONENTS 3 pages follow

Attachment 1 EC 289082 Rev. 0 Eng. Eval. 2017-0018 Rev. 0 I I

FORM OAR-1 OWNER'S ACTIVITY REPORT I

Report Number. U2R35 Outage Class 1, 2, 3 and MC ISi Examinations Plant: NextEra Energy Point Beach Nuclear Plant Ii 6610 Nuclear Road I Twin Rivers, Wisconsin 54241 Unit: 2 Commercial Service Date: October 1, 1972 Refueling Outage No.; U2R35 Current Inspection lnterv.al: ISi - 5TH - !WE - 3rd I Current Inspection Period: ISi - 2"d - !WE - 151 Edition and Addenda of Section XI applicable to the inspection plans: ISi - 2007 Edition through 2008 Addenda.

!WE - 2007 Edition through 2008 Addenda Date and Revision of inspection plans: ISi - February 10, 2016, Revision 14 IWE - November 8, 2016 Revision 0 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: Same Code Cases used for ins ection and evaluation: N-532-5 N-706-1 N-722-1 N-731 & N-770-1 .

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of U2R35 conform to the requirements of Section XI.

Signed >~ ~.r6cte ~DitAru /i'(;.(, Date __ *~_,__,0_~_*.,....;;_1"_7__

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Insurance Company have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connec ed with _this in pecti~n. "

~L{cM,\. . Commissions WI 929625, . NB 12692 AN,I Nation.al Board,' Stale, Province, and Endorsements 1 of3

Attachment 1 EC 289082 Rev. 0 Eng. Eval. 2017-0018 Rev. 0 FORM OAR*1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WlTH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE U2R35 - ISi - 5th Interval, 2ND Period U2R35 - IWE 3rd Interval, 1st Period Examination Category and Item Description Evaluation Description Item Number None None None 2 of 3

Attachment 1 EC 289082 Rev. 0 Eng. Eval. 2017-0018 Rev. 0 FORM OAR-1 OWN ER'S ACTIVITY REPORT TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE U2R35 - ISi - 5th Interval, 2ND Period U2R35 - IWE 3rd Interval, 1st Period Repair/

Date Replacement Code Class Item Description Description of Work Completed Plan Number HX-120, .

Weld build-up/repair of Component 3 pitting areas inside channel 2/11/17 RR 2017-0001 Cooling-Heat heads Exchanger HX-128, Weld bui!d-up/repair of Component 3 pitting areas inside channel 3/2/17 RR 2017-0005 Cooling Heat heads Exchanger C-1, Equipment Replaced bolting after MC 3/24/17 RR 2017-0014 Hatch Bolting inspection I

I I l Ii.

i I !

3 of 3 II

?l