NRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations
ML23188A118
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/07/2023
From: Schultz E
Point Beach
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
NRC 2023-0013, RIS 2023-01
Download: ML23188A118 (1)


Text

NEXTera ENERGY .

POINT BEACH July 7, 2023 NRC 2023-0013 RIS 2023-01 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington , DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Response to Regulatory Information Summary 2023-01 "Preparation and Scheduling of Operator Licensing Examinations" On April 19, 2023 the NRC issued Regulatory Issue Summary (RIS) 2023-01 . RIS 2023-01 requests that each licensee provide an update of operator licensing examination information for calendar years 2024 through 2027.

The enclosure to this letter provides the NextEra Energy Point Beach, LLC, response for the Point Beach Nuclear Plant, Units 1 and 2.

If there are questions concerning this, please contact Mr. Randy Hastings, Point Beach Nuclear Plant Training Manager, at 920-755-7418.

Sincerely, NextEra Energy Point Beach, LLC Eric Schultz Licensing Manager Enclosure cc: Administrator, Region Ill , USNRC Operations Branch Chief, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150*0131 EXPIRES: 01/31/2024 (01-2021) v>1'11£a", Estimated burden per response to comply with this voluntaiy information collection request 45 minutes.

,<.- *>. This information collection is used to plan budgets and resources for operator examinations. Send l~\

t:. *

<:. ~~ -;/l . I:

OPERATOR LICENSING EXAMINATION DATA comments regarding burden estimate to the FOIA, Libraiy, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulaloiy Commission, Washington, DC 20555-0001, or by e-mail to lnfocollecls.Resource@nrc.gov, and the Ol.IB revieNer at OMB Office of Information and Regulatoiy

...;..+,, ,\o

lf:111- . ... .

Affairs, (3150-0131), Attn: Desk Officer for the Nuclear Regulalof)' Commission, 725 17th Street NW, Washington, DC 20503; e-mail: o;ra submiss'on'.O>omb eop gov. The NRC may not conduct or sponsor, and a person is not required to respond to. a collection or information unless the document requesting or requiring the collection displays a currently va'ld OMScontrol number.

FACILITY NRC REGION Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301, Renewed License Nos. DPR 24 and DPR 27 !Region Ill I

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2024 CY 2025 CY 2026 CY2027 ESTIMATED NUMBER OF LICENSEE-PREPARED l 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAM !NATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2024 CY2025 CY 2026 CY 2027 NUMBER OF REACTOR OPERATORS 8 8 8 8 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 6 6 6 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 2 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 03/04/2024 03/03/2025 05/ 1112026 05/03/2027 ALTERNATE DATE 03/ 18/2024 03/1 7/2025 05/25/2026 05/17/2027 NRC FORM 536 (01-202 1)