Category:Code Relief or Alternative
MONTHYEARML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval ML20036F2612020-03-0404 March 2020 Approval of Relief Request 1-RR-13 and 2-RR-13 Regarding Extension of Inspection Interval for Point Beach Unit 1 and Unit 2 Reactor Pressure Vessel Welds from 10 to 20 Years ML19339H7472019-12-13013 December 2019 Approval of Relief Request 2-RR-17 Regarding Steam Generator Primary Nozzle Dissimilar Metal Welds Inspection Interval ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques L-2017-121, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-07-24024 July 2017 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16063A0582016-03-22022 March 2016 Approval of Relief Request 2-RR-11; Steam Generator Nozzle to Safe-End Dissimilar Metal (DM) Weld Inspection ML15246A3052015-09-16016 September 2015 Evaluation of Relief Request RR-10 - Examination of Feedwater Nozzle Extension to Nozzle Weld Fifth 10-Year Inservice Program Interval ML15127A2912015-05-20020 May 2015 Relief Request RR-8, Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for Examination of Buried Components NRC 2015-0025, Requests Relief from Performing Inservice Testing (ISI) of Relief Valve 1CC-00763B2015-05-14014 May 2015 Requests Relief from Performing Inservice Testing (ISI) of Relief Valve 1CC-00763B ML15099A0182015-05-0707 May 2015 Relief Request RR-9, Proposed Alternative from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for System Leakage Test ML14343A0512014-12-10010 December 2014 Relief from the Requirements of the ASME Code for Re-Examination of the Reactor Pressure Vessel a Inlet Nozzle Weld for the Fifth Ten-Year Inservice Inspection Program Interval ML13329A0312013-12-20020 December 2013 Relief from the Requirements of ASME B&PV Code, Section XI, for the Fourth 10-Year ISI Interval (RR-4L1) NRC 2013-0020, CFR 50.55a Request, Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval2013-03-19019 March 2013 CFR 50.55a Request, Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval ML13079A1412013-03-19019 March 2013 CFR 50.55a Request, Relief Request RR-4L3 Inservice Inspection Impracticality Examination Limitations Due to Configuration Fourth Ten-Year Inservice Inspection Program Interval ML13064A4252013-03-18018 March 2013 Relief Request 1-RR-4 Re-Examination of the Unit 1 RPV Indication on the a Inlet Nozzle Weld ML12286A1042012-11-15015 November 2012 Evaluation of Relief Requests RR-2 & RR-3 (ME7974 & ME7975) ML0617103642006-07-0303 July 2006 Monticello Nuclear Generating Plant, Palisades Nuclear Plant, Point Beach Nuclear Plant Units 1 and 2, Prairie Island Nuclear Generating Plant, Units 1 and 2 - Use of ASME Code Case N-513-2 ML0527001972006-01-18018 January 2006 Relief Request - Reactor Vessel Closure Head Penetration Flaw Characterization Relief Request MR 02-018-2, Revision 2 ML0526503122005-09-27027 September 2005 Relief Requests - the Previsions of ASME Section XI, IWA-5244, Buried Components, RR-1-26 and RR-2-34 NRC 2005-0084, Reactor Vessel Closure Head Penetration Flaw Characterization Relief Request MR 02-018-2, Revision 22005-07-0101 July 2005 Reactor Vessel Closure Head Penetration Flaw Characterization Relief Request MR 02-018-2, Revision 2 NRC 2005-0016, Relief Request from the Provisions of ASME Section Xl, IWA-4422.2.2, Defect Removal Followed by Welding or Brazing, Relief Request 162005-02-0404 February 2005 Relief Request from the Provisions of ASME Section Xl, IWA-4422.2.2, Defect Removal Followed by Welding or Brazing, Relief Request 16 NRC 2005-0015, Relief Request from the Provisions of ASME Section XI, IWA-5244, Buried Components, Relief Request 152005-01-21021 January 2005 Relief Request from the Provisions of ASME Section XI, IWA-5244, Buried Components, Relief Request 15 ML0408601612004-04-0101 April 2004 Request for Relief VRR 03-01 on a One Time Basis for Performing Inservice Testing of Relief Valve 1RH-861C ML0401607382004-02-26026 February 2004 Prairie, Units 1 and 2, Kewaunee, Point Beach, Units 1 and 2, Palisades, Re Request for Alternatives to ASME Section XI, Appendix Viii, Supplement 10 ML0323104022003-09-10010 September 2003 Relief, MR 02 018-2 Pertaining to Reactor Vessel Closure Head Penetration Repair ML0306203282003-03-21021 March 2003 Relief, Use of Code Case N-600 for the Fourth 10-Year Interval, MB5403 and MB5404 ML0225401092003-03-21021 March 2003 Relief Request No 8 - Requirement for Scheduling of Components for Examination ML0302101262003-02-27027 February 2003 Relief, Alternative to Examine All Three Vessels of the Regenerative Heat Exchanger, MB5401 & MB5402 ML0225300062002-10-0808 October 2002 Code Relief, ASME Code Section XI, Relief Request 5 Regarding Visual Examination of Insulted Bolting on Borated Systems ML0225300232002-10-0808 October 2002 Relief, Granted for ASME Code Section XI, Relief Request 6 Regarding Evaluation of Leakage with Bolting In-Place NRC 2002-0073, Reactor Vessel Closure Head Penetration Repair Relief Requests MR 02-018-1 and MR 02-018-22002-08-28028 August 2002 Reactor Vessel Closure Head Penetration Repair Relief Requests MR 02-018-1 and MR 02-018-2 2023-11-09
[Table view] Category:Letter
MONTHYEARML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule IR 05000266/20234022023-11-14014 November 2023 Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval IR 05000266/20230032023-10-16016 October 2023 Integrated Inspection Report 05000266/2023003 and 05000301/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23243A9102023-09-0606 September 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors IR 05000266/20235012023-08-29029 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 ML23208A2262023-08-28028 August 2023 Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - Letter ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections IR 05000266/20230022023-07-18018 July 2023 Integrated Inspection Report 05000266/2023002 and 05000301/2023002 IR 05000266/20234012023-07-13013 July 2023 Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval2023-06-27027 June 2023 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval ML23171B1062023-06-21021 June 2023 Info Meeting with a Question and Answer Session to Discuss NRC 2022 EOC Plant Performance Assessment of Ptbh, Units 1 and 2 ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response2023-06-0101 June 2023 Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal ML23118A1762023-05-0404 May 2023 Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191 IR 05000266/20230012023-05-0101 May 2023 Integrated Inspection Report 05000266/2023001 and 05000301/2023001 ML23114A1222023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-2023-058, 2022 Annual Monitoring Report2023-04-10010 April 2023 2022 Annual Monitoring Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications 2024-02-05
[Table view] Category:Safety Evaluation
MONTHYEARML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22193A1142022-09-12012 September 2022 Issuance of Amendment Nos. 270 and 272 Elimination of the Requirements to Maintain the Post-Accident Sampling System ML22140A1272022-05-25025 May 2022 Subsequent License Renewal Application Safety Evaluation Revision 1 Public ML22041A3342022-02-23023 February 2022 Transmittal Letter for Point Beach Final SE for SLRA Review to AA La 2-9 (3) ML22054A1082022-02-23023 February 2022 Subsequent License Renewal Application Safety Evaluation Public ML21148A2552021-07-21021 July 2021 Issuance of Amendment Nos. 269 and 271 Technical Specification Changes to Implement New Surveillance Methods for Transient Heat Flux Hot Channel Factor ML20363A1762021-02-23023 February 2021 Issuance of Amendment Nos. 268 and 270 Regarding Tornado Missile Protection Licensing Basis ML20241A0582020-09-25025 September 2020 Issuance of Amendment No. 267 for One-Time Extension of License Condition 4.I, Containment Building Construction Truss (EPID L-2020-LLA-0180 (COVID-19)) ML20036F2612020-03-0404 March 2020 Approval of Relief Request 1-RR-13 and 2-RR-13 Regarding Extension of Inspection Interval for Point Beach Unit 1 and Unit 2 Reactor Pressure Vessel Welds from 10 to 20 Years ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19339H7472019-12-13013 December 2019 Approval of Relief Request 2-RR-17 Regarding Steam Generator Primary Nozzle Dissimilar Metal Welds Inspection Interval ML19064A9042019-04-25025 April 2019 Issuance of Amendments to Extend Containment Leakage Rate Test Frequency ML19052A5442019-03-27027 March 2019 Issuance of Amendments 264 and 267 to Adopt TSTF-547, Clarification of Rod Position Requirements ML18289A3782018-11-26026 November 2018 Issuance of Amendments to Adopt Title 10 of Code of Federal Regulations 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML18079A0452018-06-13013 June 2018 Issuance of Amendments Revision to the Point Beach Nuclear Plant Emergency Action Level Scheme (CAC Nos. MF9859 and MF9860 EPID L-2017-LLS-0278) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML17159A7782017-07-27027 July 2017 Issuance of Amendment to Approve H*: Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17039A3002017-02-22022 February 2017 Issuance of Amendments -Removal of Completed License Conditions and Changes to the Ventilation Filter Testing Program ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16241A0002016-09-23023 September 2016 Mitigating Strategies and Spent Fuel Pool Instrumentation Safety Evaluation ML16196A0932016-09-0808 September 2016 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48 (C) ML16118A1542016-06-17017 June 2016 Issuance of Amendments ML16063A0582016-03-22022 March 2016 Approval of Relief Request 2-RR-11; Steam Generator Nozzle to Safe-End Dissimilar Metal (DM) Weld Inspection ML16035A5092016-03-0909 March 2016 Correction of Typographical Error in Safety Evaluation Associated with License Amendment Nos. 238 and 242 ML15293A4572015-11-25025 November 2015 Issuance of Amendments for the Steam Generator Technical Specifications, to Reflect Adoption of TSTF-510 ML15246A3052015-09-16016 September 2015 Evaluation of Relief Request RR-10 - Examination of Feedwater Nozzle Extension to Nozzle Weld Fifth 10-Year Inservice Program Interval ML15195A2012015-07-28028 July 2015 Issuance of Amendments Regarding Relocation of Surveillance Frequencies to Licensee Control ML15155A5392015-07-14014 July 2015 Issuance of Amendments Concerning Extension of Cyber Security Plan Milestone 8 ML15161A5352015-06-24024 June 2015 Relief Request VR-01; Alternatives to Certain Inservice Testing Requirements of the American Society of Mechanical Engineers (ASME) Code of Operation and Maintenance of Nuclear Power Plants ML15127A2912015-05-20020 May 2015 Relief Request RR-8, Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for Examination of Buried Components ML15099A0182015-05-0707 May 2015 Relief Request RR-9, Proposed Alternative from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code for System Leakage Test ML15014A2492015-01-27027 January 2015 Issuance of Amendments to Revise Technical Specifications to Adopt Technical Specifications Task Force - 523, Generic Letter 2008-01, Managing Gas Accumulation (Tac Nos. MF4353 and MF4354) ML14343A0512014-12-10010 December 2014 Relief from the Requirements of the ASME Code for Re-Examination of the Reactor Pressure Vessel a Inlet Nozzle Weld for the Fifth Ten-Year Inservice Inspection Program Interval ML14293A0022014-10-21021 October 2014 Issuance of Safety Evaluation Regarding Relief Request RR-5 ML14126A3782014-06-30030 June 2014 Issuance of License Amendment Nos. 250 and 254 Regarding Change to Technical Specification 5.6.5, Reactor Coolant System Pressure and Temperature Limits Report ML14058B0292014-05-0909 May 2014 Issuance of Amendment Nos. 249 and 253 Regarding Use of Optimized Zirlo Fuel Cladding Material ML14014A2052014-01-30030 January 2014 Issuance of Relief Request Regarding Risk-Informed Inservice Inspection Program for the Fifth 10-Year Inservice Inspection Interval ML13329A0422013-12-20020 December 2013 Relief from the Requirements of ASME Code, Section XI, for the Fourth 10-Year Inservice Inspection Interval (RR-4L3) ML13329A0312013-12-20020 December 2013 Relief from the Requirements of ASME B&PV Code, Section XI, for the Fourth 10-Year ISI Interval (RR-4L1) ML13346A0402013-12-18018 December 2013 Relief from the Requirements of ASME Code, Section XI, for the Fourth 10-Year Inservice Inspection Interval (RR-4L2) ML13135A2712013-05-29029 May 2013 Safety Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML13064A4252013-03-18018 March 2013 Relief Request 1-RR-4 Re-Examination of the Unit 1 RPV Indication on the a Inlet Nozzle Weld ML12362A0092013-01-29029 January 2013 Issuance of License Amendment Nos. 248 and 252 Operations Manager Qualification Requirements ML12251A1552012-11-23023 November 2012 Issuance of Amendment to Renewed Facility Operating License Revised Cyber Security Plan Implementation Schedule Milestone 6 2024-01-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 16, 2015 Mr. Eric McCartney Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNIT NO. 2- EVALUATION OF RELIEF REQUEST RR EXAMINATION OF THE UNIT 2 STEAM GENERATOR FEEDWATER NOZZLE EXTENSION TO NOZZLE WELD FIFTH 10-YEAR INSERVICE INSPECTION PROGRAM INTERVAL (TAC NO. MF5012)
Dear Mr. McCartney:
By letter dated October 13, 2014, and supplemented by letter dated June 15, 2015 (Agencywide Document Access and Management System (ADAMS) Accession Nos. ML14286A094 and ML15166A146), NextEra Energy Point Beach, LLC (NextEra), (the licensee), submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for relief from the inservice inspection requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI inspection requirements for a unique weld configuration.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1 ), the licensee requested to use the proposed alternative on the basis that the alternative provides an acceptable level of quality and safety.
The NRC staff has reviewed the proposed request and concludes as set forth in the enclosed safety evaluation, that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1 ). The staff determines that the proposed alternative described in Request for Relief No. 1O provides an acceptable level of quality and safety. Therefore, the NRC staff authorizes Request for Relief No. 1O at Point Beach Nuclear Power Plant, Unit 2 for the fifth 10-Year lnservice Inspection Interval that is currently scheduled to end on July 31, 2022.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
E. McCartney If you have any questions, please contact Mahesh Chawla of my staff at (301) 415-8371.
Sincerely, D~Qlto~~~~~
Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-301
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REGARDING THE FIFTH 10-YEAR INSERVICE INSPECTION INTERVAL REQUEST FOR RELIEF NO. 10 POINT BEACH NUCLEAR POWER PLANT. UNIT NO. 2 NEXTERA ENERGY POINT BEACH. LLC DOCKET NO. 50-301 (TAC NO. MF5012)
1.0 INTRODUCTION
By letter dated October 13, 2014 and supplemented by letter dated June 15, 2015 (Agencywide Document Access and Management System (ADAMS) Accession Nos. ML14286A094 and ML15166A146), NextEra Energy Point Beach, LLC (NextEra), (the licensee), submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for relief from the inservice inspection requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI inspection requirements for a unique weld configuration.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1 ), the licensee requested to use the proposed alternative on the basis that the alternative provides an acceptable level of quality and safety.
2.0 REGULATORY EVALUATION
Relief Request (RR) No. 10, dated October 13, 2014, cited 10 CFR 50.55a(a)(3)(i), which covered RRs for alternatives on the basis that the proposed alternative would provide an acceptable level of quality and safety. On December 5, 2015, the NRC reorganized 10 CFR 50.55a (Federal Register Volume 79 Number 214), and RRs that had been previously covered by 10 CFR 50.55a(a)(3)(i) are now covered under the equivalent 10 CFR 50.55a(z)(1 ).
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the pre-service examination requirements, set forth in the ASME Code,Section XI, "Rules for lnservice Inspection of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components.
Paragraph 55a(z) of 10 CFR 50 states, in part, that alternatives to the requirements of 10 CFR 50.55a(g) may be used, when authorized by the NRC, if (1) the proposed alternatives would Enclosure
provide an acceptable level of quality and safety or (2) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for the licensee to request and the Commission to authorize the alternative requested by the licensee.
3.0 TECHNICAL EVALUATION
3.1 Licensee's Relief Request Affected Component The affected weld is a class 2 weld, numbered SG-A-8, between a feedwater nozzle and a nozzle extension. The licensee has classified the weld as an Examination Category C-B Item Number C2.21 Nozzle-to-Shell (Nozzle to Head or Nozzle to Nozzle).
The nozzle and nozzle extension were fabricated from SA-508 Cl. 3a ferritic steel.
ASME Code of Record The 2007 Edition with the 2008 Addenda of the ASME Code Section XI is the code of record for the fifth 10-Year inservice inspection program interval which began on August 1, 2012.
Code Requirement Examination category C-B, Item C2.21 requires a surface and volumetric examination in accordance with Appendix I of ASME Code Section XI.
As there is no specific provision for a nozzle-to-nozzle or a nozzle-to-nozzle extension weld in Appendix I, the nozzle-to-nozzle extension weld defaults to the requirements of ASME Code Section V Article 4, supplemented by ASME Code Section XI Appendix I Table 1-2000-1. ASME Code Section XI Appendix I Table 1-2000-1 requires the use of 45 degree and 60 degree inspection angles.
Proposed Alternative A surface and ultrasonic examination will be performed once each interval. The ultrasonic examination will utilize 30 degree and 45 degree beam angles to interrogate the lower third of the weld and adjacent base material. The 30 degree angle has been chosen to be used from the nozzle taper. Scan coverage with the 45 degree search unit is limited due to short physical length of the nozzle boss, but will be performed to the maximum extent possible.
Basis for Alternative The proposed technique has been demonstrated to the Authorized Inspection Agency on a mock-up with two implanted weld solidification flaws 0.085 inches deep (1.99 percent through-
wall extent). The circumferential flaw was placed in the region of the block which would equate to the weld centerline to demonstrate the ability of the 30 degree search unit to detect a flaw while scanning on the nozzle taper. The axial flaw was placed at a convenient location on the block away from the calibration reflectors (side and end-drilled holes).
Duration of Proposed Alternative The proposed alternative will be used for the fifth 10-Year lnservice Inspection Interval that is currently scheduled to end on July 31, 2022.
3.2 Staff Evaluation The licensee is proposing to use an alternative ultrasonic inspection procedure for a nozzle to nozzle extension weld in the feedwater system for a steam generator on the basis that the alternative provides an acceptable level of quality and safety.
The licensee has classified the weld as a category C-8, Item C2.21 inspection. ASME Code Section XI Appendix I does not specifically describe the requirements for a nozzle to nozzle extension weld, and the weld defaults to an ASME Code Section V Article 4 inspection with the requirement to follow ASME Code Section XI Appendix I Table 1-2000-1. The NRC staff considered the possibility that the weld could also be considered a piping butt weld, which would require an inspection performed to meet the requirements of ASME Code Section XI Appendix VIII. The classification of the weld is ultimately relatively unimportant in this case, as the small area available to scan the weld would result in significant missed volumetric inspection coverage for either a Section V Article 4 or a Section XI Appendix VIII examination. This missed coverage would almost certainly result in the inspection achieving less than essentially 100 percent coverage, resulting in the need for a relief request under 10 CFR 50.55a(g)(5)(iii).
While the licensee also has the option of inspecting the weld with a procedure incapable of achieving sufficient coverage and then submitting a relief pursuant to 10 CFR 50.55a(g)(5)(iii),
using an alternate inspection procedure that is effective over the entire weld provides a stronger basis for assuring structural integrity and leak tightness for the component.
The proposed ultrasonic inspection is designed to be conducted from the flat nozzle "boss" area on either side of the weld using a 45 degree search unit and from the nozzle taper using a 30 degree search unit. The inspection from the tapered area covers the entire wetted surface of the weld and the 45 degree inspections from the flat nozzle boss area cover the upper regions of the inspection area. This procedure was able to detect axial and circumferential 0.085 inch deep, ::=2 percent through-wall, weld solidification cracks. This combination of 100 percent coverage of the inner diameter (ID) wetted surface and demonstrated ability to find small flaws provides a technical basis showing that the proposed inspection is preferable to a limited-access inspection performed to ASME Code requirements that would not be able to scan the ID surface and would not achieve essentially 100 percent coverage.
The calculated cumulative usage factor (CUF) for the component over its remaining lifetime is 0.9276. Based on this calculation, cracking is not expected to occur in this component. The CUF is relatively close to 1, but if thermal fatigue cracks do develop they are expected to take more than one 10-Year interval before they would challenge the structural integrity or leak tightness of the weld.
4.0 CONCLUSION
As set forth above, the NRC staff determines that the proposed alternative described in Request for Relief No. 10 provides an acceptable level of quality and safety. Accordingly, the staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(1 ). Therefore, the NRC staff authorizes Request for Relief No. 10 at Point Beach Nuclear Power Plant, Unit No. 2 for the fifth 10-Year lnservice Inspection Interval that is currently scheduled to end on July 31, 2022.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved remain applicable, including third-party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor: S.Cumblidge, NRR/DE/EPNB Date: September 16, 2015
ML15246A305 (*) memo dated 8/27/2015 OFFICE DORL/LP LI 11-1 /PM DORL/LPLI 11-1 /LA DE/EPNB/BC DORL/LPLI 11-1 /BC NAME MChawla MHenderson DAiiey* DPelton DATE 9/10/2015 9/08/2015 8/27/2015 9/16/2015