Similar Documents at Salem |
---|
Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report – Cycle 302023-11-0101 November 2023 Core Operating Limits Report – Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-23
[Table view] Category:Operating Report
MONTHYEARLR-N23-0016, And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N21-0055, Corrected Report of Changes, Tests, and Experiments2021-07-20020 July 2021 Corrected Report of Changes, Tests, and Experiments LR-N18-0136, Report of 10 CFR 72.48 Changes, Tests, and Experiments2018-12-0505 December 2018 Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N06-0046, PSEG Metrics for Improving Work Environment, Salem and Hope Creek, Quarterly Report2006-01-31031 January 2006 PSEG Metrics for Improving Work Environment, Salem and Hope Creek, Quarterly Report LR-N05-0196, Report of Changes, Tests and Experiments2005-03-31031 March 2005 Report of Changes, Tests and Experiments ML0402908812004-01-22022 January 2004 New Jersey Pollutant Discharge Elimination System Discharge Monitoring Reports Salem Generating Station Permit No. NJ0005622 LR-N04-0013, December 2003 Monthly Operating Report Salem Generating Station Unit 22004-01-15015 January 2004 December 2003 Monthly Operating Report Salem Generating Station Unit 2 ML19031A3521978-10-10010 October 1978 Submit Operating Report for Month of September 1978 ML19030A3241978-09-12012 September 1978 Submit Monthly Operating Report for the Month of August 1978 for Salem No. 1 ML19030A3261978-08-10010 August 1978 Submit Monthly Operating Report for the Month of July 1978 for Salem No. 1 ML19030A3291978-07-12012 July 1978 Submit Monthly Operating Report for the Month of June 1978 for Salem No. 1 ML19030A3281978-07-10010 July 1978 Attached Monthly Operating Report of Industrial Waste Treatment Plant for the Month of June 1978 ML19030A3311978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3321978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3341978-05-10010 May 1978 Submit Monthly Operating Report for the Month of April 1978 for Salem No. 1 ML19030A3351978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3371978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3381978-03-0707 March 1978 Submit Monthly Operating Report for the Month of February 1978 for Salem No. 1 ML19030A3401978-02-15015 February 1978 Submit Monthly Operating Report for the Month of January 1978 for Salem No. 1 ML19030A3411978-01-0909 January 1978 Submit Monthly Operating Report for the Month of December 1977 for Salem No. 1 ML19030A3431977-12-0909 December 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3471977-11-0404 November 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3491977-10-0505 October 1977 Submit Monthly Operating Report for the Month of September 1977 for Salem No. 1 ML19030A3511977-09-0909 September 1977 Submit Monthly Operating Report for the Month of August 1977 for Salem No. 1 ML19030A3531977-08-10010 August 1977 Submit Monthly Operating Report for the Month of July 1977 for Salem No. 1 ML19030A3561977-07-0808 July 1977 Submit Monthly Operating Report for the Month of June 1977 for Salem No. 1 ML19030A3591977-06-0606 June 1977 Submit Monthly Operating Report for the Month of May 1977 for Salem No. 1 ML19030A3601977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3611977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3621977-04-0606 April 1977 Submit Monthly Operating Report for the Month of March 1977 for Salem No. 1 ML19030A3641977-03-0303 March 1977 Submit Monthly Operating Report for the Month of February 1977 for Salem No. 1 ML19030A3661977-02-0707 February 1977 Submit Monthly Operating Report for the Month of January 1977 for Salem No. 1 ML19030A3681977-01-28028 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3691977-01-12012 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3711976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3721976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3741976-11-0101 November 1976 Submit Monthly Operating Report for the Month of October 1976 for Salem No. 1 ML19030A3761976-10-18018 October 1976 Submit Monthly Operating Report for the Month of September 1976 for Salem No. 1 ML19030A3771976-09-14014 September 1976 Submit Monthly Operating Report for the Month of August 1976 for Salem No. 1 2023-02-28
[Table view] Category:Monthly
MONTHYEARLR-N04-0013, December 2003 Monthly Operating Report Salem Generating Station Unit 22004-01-15015 January 2004 December 2003 Monthly Operating Report Salem Generating Station Unit 2 ML19031A3521978-10-10010 October 1978 Submit Operating Report for Month of September 1978 ML19030A3241978-09-12012 September 1978 Submit Monthly Operating Report for the Month of August 1978 for Salem No. 1 ML19030A3261978-08-10010 August 1978 Submit Monthly Operating Report for the Month of July 1978 for Salem No. 1 ML19030A3291978-07-12012 July 1978 Submit Monthly Operating Report for the Month of June 1978 for Salem No. 1 ML19030A3281978-07-10010 July 1978 Attached Monthly Operating Report of Industrial Waste Treatment Plant for the Month of June 1978 ML19030A3311978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3321978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3341978-05-10010 May 1978 Submit Monthly Operating Report for the Month of April 1978 for Salem No. 1 ML19030A3351978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3371978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3381978-03-0707 March 1978 Submit Monthly Operating Report for the Month of February 1978 for Salem No. 1 ML19030A3401978-02-15015 February 1978 Submit Monthly Operating Report for the Month of January 1978 for Salem No. 1 ML19030A3411978-01-0909 January 1978 Submit Monthly Operating Report for the Month of December 1977 for Salem No. 1 ML19030A3431977-12-0909 December 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3471977-11-0404 November 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3491977-10-0505 October 1977 Submit Monthly Operating Report for the Month of September 1977 for Salem No. 1 ML19030A3511977-09-0909 September 1977 Submit Monthly Operating Report for the Month of August 1977 for Salem No. 1 ML19030A3531977-08-10010 August 1977 Submit Monthly Operating Report for the Month of July 1977 for Salem No. 1 ML19030A3561977-07-0808 July 1977 Submit Monthly Operating Report for the Month of June 1977 for Salem No. 1 ML19030A3591977-06-0606 June 1977 Submit Monthly Operating Report for the Month of May 1977 for Salem No. 1 ML19030A3601977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3611977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3621977-04-0606 April 1977 Submit Monthly Operating Report for the Month of March 1977 for Salem No. 1 ML19030A3641977-03-0303 March 1977 Submit Monthly Operating Report for the Month of February 1977 for Salem No. 1 ML19030A3661977-02-0707 February 1977 Submit Monthly Operating Report for the Month of January 1977 for Salem No. 1 ML19030A3681977-01-28028 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3691977-01-12012 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3711976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3721976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3741976-11-0101 November 1976 Submit Monthly Operating Report for the Month of October 1976 for Salem No. 1 ML19030A3761976-10-18018 October 1976 Submit Monthly Operating Report for the Month of September 1976 for Salem No. 1 ML19030A3771976-09-14014 September 1976 Submit Monthly Operating Report for the Month of August 1976 for Salem No. 1 2004-01-15
[Table view] |
Text
{{#Wiki_filter:Public Service Electric and Gas Company Salem Nuclear Generating Station P.O. Box #168 Hancocks Bridge, New Jersey 08038 so-~1~
September 9, 1977
,,*(\5'*;~0~r~~?2);**. .
Director *",**1*.:-- lrEc'[.1':~,o. . . .':~\
Off ice of Inspection and Enforcement " Sr.*1-; I v,* '-.\
U.S. Nuclear Regulatory Commission Washington, D.C. 20555
,....,f.'I
.. :~*-~ U.s,
......
*;". l\
- t UqE.4 CoM R REGu
~ 19J7 \~:J
\~-* \
I
;--1
. . ._:'\ trto;_1 ~:s~10,f4roR"1 ;~;-: /
... 1 * ..<.lto!J I , '/
MONTHLY OPERATING REPORT SALEM GENERATING STATION
'\:~*c>z:;*>* --~-<(~2~))
....,,f../// I{{~\_\/.
In compliance with Section 6.9, Reporting Requiremeri-ts---f'or the Salem Technical Specifications, the following Monthly Operating Reports for the month of August, 1977 are being sent to you.
(Original plus 10 copiesI Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Additional copies of the Monthly Operating Reports are being sent to:
- 1. Mr. James P. O'Reilly (1 Copy)
Director of US NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406
- 2. Director, Office of Management Information (2 Copd:es) and Program Control US Nuclear Regulatory Commission Washington, DC 20555 Prior to August, 1977 the maximum dependable capability of Sale~ #1 Unit was based upon a circulating water inlet temperature of 70 F.
The revised M.D.C. for this unit will be 1079 (MWe - NetI. The ba~is for this value is a circulating water inlet temperature of 77 F. which is the summer rating basis dictated by the P.J.M.
interconnection.
Manager
)/~~lem q #~'1#~? Generating Station Enc.
The Energy People
APPENDIX B
,. J AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
- 272
------
UNIT , Salem #1 DATE Sept. 8, 1977 COMPLETED BY J.M. Zupko, Jr.
TELEPHONE 609-365-7000 X507 MONTH August, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWE-NET) 1 813 17 773 1,076 869 2 18 3 545 19 950 527 901 4* 20 1,070 21 819 5
583 985 6 22 7 900 23 793 981 24 1,.031 8
9 938 25 1,072 10 1,.076 26 1,011 11 910 27 533 723 934 12 28 257 902 13 29 418 30 816 14 1,069 841 15 31 16 . 1,070 Pg. 2-4 8.1-7.RL-
APPENDIX C OPERA'.llNG DATA REPOroe
~ ~Tn 50-272
~* IV* - - - - - - - - - - -
UNIT Salem No. 1 DATE 9-8-77
******""*** COOLE!'ED BY J.M. Zupko, Jr.
OPERATING STA'IUS TELEPHJNE
*:u-::b
- 1. REPORI'ING PERIOD:August, 1977 GROSS HOURS IN REPORTING PERIOD:
-------
744
- 2. OJRRENl'LY AUllIDRIZED POWER LEVEL (MWt): 3338MAX.DEPEND.CAPACITY(MWe-NET): 1079 DESIGN ELECTRICAL RATING(MWe-Net): 1090
- 3. roiiER LEVEL TO WHICli RESTRICTED (IF ANY) ()!We-Net) :__N_o_n_e_ _ _ __
- 4. REASONS FOR RESI'RICTION (IF ANY) : .
THIS MJNI'H YR TO DATE CtMJLATIVE S. NteER OF HJURS REACTOR WAS CRITICAL
- 6. REACl'OR RESERVE SHDTOOWN HOURS * * * *
*1. HOURS GENERATOR ON LINE * * * ....... 718.6 4,090~5 4,130.8 o.o o.o o.o 8.
9.
UNIT RESERVE SHt1I'OOWN HOURS * * * * * * *
- GROSS mERrvJAL ENERGY GENERATED(}ll'YH). * * *
----
2,040,089 9.,202~949
- 10. GROSS ELECTRICAL ENERGY' GENERATED(}n'iH). *
- 661,150 2,944,090 2,947,320 ll. NET ELECTRICAL ENERGY GENERATED (MMi) * * *
- 628, 9.9.6 2,722,594 2,722,594
- 12. REACTOR SERVICE FACTOR * * * * * * * * ** 9.7.7 89.6 89.6
- 13. REACTOR AVAILABILIT'f FACI'OR * . . . . . . .. ---- 9.7.7 89..6 89..6
- 14. UNIT SERVICE FACTOR * * * *
- 15. UNIT AVAILABILIT'f FACTOR
** 87.7 87.7 UNIT CAPACITY' FACTOR(Using MDC)* * . . . . . 78.4 67.9 67.9 16.
---- 67.2 67.2
- 17. UNIT CAPACITf FACI'OR(Using Design MW'e) * *
- 18. UNIT FORCED OUI'AGE RATE I I * *
- 19. SHUl'OOWNS SamootED OVEl NEXT 6 MJNIRS(TYPE,DATE,.AND DURATJ;ON OF EAQ1): 9-17-77 Modification of IDil Pressure Turbine. Scheduled cight week outage.
- r.;. 20. IF SHCIT OOl'IN AT END OF REPORI' PERIOD, ESTIMATED DATE OF ST6.\RTUP: _ N/A
_..;;.;:~----
- 21. UNITS IN 'l'E.:l""T ST.ATUS(PRIOR TO CCMifERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITf 9-30-76 12-11-76 INITIAL ELECTRICITY 11-01-76 12-25-76 Pg. :3-4
<Df.1ERCIAL OPERATION 12-20-76 6-30':""77 8-1-7.Rl-
APPENDIX D DOCKET NO. 50.,-272
-
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Salem No. 1
'*
DATE September 8, 1977 COMPLETED BY J.M. Zupko, Jr.
TELEPHONE 609-365-7000 X507 REPORT MONTH August, 1977 METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION Tiffi REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS Clean Condensate Pump
- 77-82 7-31-77 F o.o H 4 Strainers
- 77-83 8...-1-77 F o*o.o H 4 Clean llA Circulator Traveling Screens
- 77.,..94 9.,..1.,...77 F o.o H 4 Clean llB Circulator Traveling Screens
- 77-85 8.,-3-77 F o.o H 4 Clean Condensate Pump Strainers
- 77-86 9.,...3.,...77 F o.o H 4 Clean 13A Circulator Traveling Screens 77-87 8-3-77 F 9. 7 G -3 Personnel error during routine testing of S.S.P.S., Train A
- 77":"'88 9.,...s.,...77 F 0.0 H 4 Clean 11, 12 S.G. Feed Pump Strainers.
- 77.,..99 8.,-6-77 F o.o H 4 Clean 12A & 13A Circulator Traveling Screens
- 77-90 8-9-77 F o.o H 4 Clean 13 Condensate Pump Strainers
SUMMARY
- *LOAD REDUCTION.
Pg.4-4 8.1-7.R 1
APPENDIX D DOCKET NO. 50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME ~alernNo.l DATE August 8, 1977 "
COMPLETED BY J.M. Zupko, Jr.
TELEPHONE 609-365-7000 X507 REPORT MONTH August, 19 77 METHdD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS
- 77-91 8-9-77 F o.o A 4 llB Circulator Traveling Screen Spray Header Repair 77-92 B-11-77 F 0.0 A 4 13 Condensate Pump Upper Bearing
- Cooler Repair 77-93 8-11-77 F 0.0 A . 4. 11 Condensate Pump Upper Bearing
- Replacement
- 77-94 B-13-77 F o.o H 4 Clean 13 Condensate Pump Strainer 77-95 8.-13-77 F 8.4 A 3 12 S.G. Hi Fl011/lD Level Trip -
12 S.G. Feed Pump Auto/Manual Station Failure.
77-96 8-13-77 F 7.3 A 3 IDose Cover to Turbine Trip Plate Mechanism Causing Turbine to Unlatch.
- 77-97 8-17-77 F o.o H 4 Clean Condensate Pump Strainers
- 77-98 B-17-77 F o.o H 4 Clean 12 S.G. Feed Pump Strainer
- 77-99 8.,.-18-77 F 0.0 H 4 Clean 11 S.G. Feed Pump Strainer
- 77-100 8-18-77 F o.o H 4 Clean Condensate Pump Strainers SUMM.'\RY: *LOAD REDUCTION.
Pg. 4 -4 8.1-7.R 1
APPENDIX D DOCKET NO. 50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME (3alern No. 1 DATE August 8, 1977 COMPLETED BY J.M. Zupko, Jr.
TELEPHONE 609-365-7000 X507 REPORT MONTH August, 1977 METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS
- 77-101 8-20-77 F o.o H 4 Clean 12 S.G. Feed Pump Strainers
- 77-102 8-21-77 F 0.0 H 4 Clean 11 S.G. Feed Pump Strainers
- 77-103 8-21-77 F o.o H 4 Clean 13A Circulator Traveling Screens
- 77*.-104 8-23-77
' _,
F o.o H 4 Clean 12, 13 Condensate PUmp Strainers
- 77-105 8-23-77 F 0.0 A 4 13 Condensate Pump Upper Bearing Cooler Repair
- 77-106 8-27-77 F o.o D 4 Quandrant Paver Tilt Ratio Exceed' Tech. Spec. Lirnits
- 77-107 8-28-77 F 0.0 H 4 Clean 12, 13 Condensate Pump Strainers
SUMMARY
- *LOAD REDUCTION.
Pg.4-4 8.1-7.R 1}}