ML19207C233

From kanterella
Revision as of 14:31, 19 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Supplements 790731 Response to NRC 790619 Request.Forwards Charts & Tables Re Mgt & Technical Resources Available in Event of Nuclear Incident
ML19207C233
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/05/1979
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 7909100515
Download: ML19207C233 (12)


Text

'

d BALTIM O RE G AS AN D ELECTRIC CO M PANY GAS AN D ELECTRIC DUILDING B A LTI M O R E, M A RYLA N D 21203 ARTHUR E. LUN DVALL,JR v.c c rac.mc~- September 5, 1979 s-.

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attn: Mr. Robert W. Reid, Chief Operating Reactors Branch #h Division of Operating Reactors

Subject:

Calvert Cliffs Nuclear Power Plant Units Nos. 1 & 2, Docket Nos. 50-317 & 50-318 Manacement and Technical Resources

Reference:

a) 'GC letter dated 6/29/79 from H. R. Denton to All Power Reactor Licensees.

b) BG&E letter dated 7/31/79 from A. E. Lundvall to R. W. Reid, same subject.

Gentlemen:

The attached charts and tables provide additional information relative to the technical human resources available to the manarement of Baltimore Gas and Electric Company in the event of a S!I-2 type of evt. ...

This infor=ation supplements that previously submitted in Reference (b) in response to Reference (a). If you have any questions, please contact us.

Very truly your's, ,

't j ,

l

-

,/

,

. / 2 rpat_a _ . 3

_

J', m. u .

i ,-

cc: J. A. Biddison, Esquire G. F. Trowbridge, Esquire Mr. E. L. Conner, Jr. - NRC Mr. W. P. Haass, - NRC t.u>me s)%)

  • A fa rln t) 7909100 6/I

.

BALTIMORE GAS Afl0 ELECTRIC PRODUCTION ELECTRIC COMPANY CALVERT CLIFFS fl0 CLEAR POWER PLANT DEPARTMEtiT CHIEF ENGIflEER-NUCLEAR PLANT

  • l. L. B. Russell 3 8 l l NUCLEAR PLANT ErlGI- - fluCLEAR PLAtlT EtlGI- RADIATION SAFETY & ASSISTANT GENERAL ASST. GEN. SUPERVISOR-

- NEER-0PERATIONS NEER-PERFORMAtlCE CHEMISTRY ENGIflEER SUPERVISOR-PLAflT fluCLEAR SECURITY SERVICES

  • l. R. E. Denton *l. W. S. Gibson *l. A. J. Kaupa 1. C. C. Woody
1. H. A. Eqgleston PLANT HEALTil

- SHIFT SUPERVISORS __ ASSISTAflT GENERAL PHYSICIST FOREf1 Ell-MAINTEN ANCE

1. C. L. Dunkerly 1 E. T. Reimer 2 J. R. Hill 1. R. G. Rizzo 3 J. F. Lohr 2. E. R. Bauer --

PERFORMANCE 4 J. E. Rivera EtlGINEERS S. D. F. Zyriek 6 J. E. Gilbert SUPERVISOR- 1. P. T. Crinigan TECHilICAL SUPPORT 2. R. F. Eherts

~-

PERFORMANCE 1. J. T. Carroll FOREfiEN-RADIATION ENGINEERS SAFETY & CHEMISTRY 1 R. P. Heibel PERFORMAflCE ~~~

1. J. R. Speciale
2. S. M. Davis ErlGIflEERS 2. J. T. Carlson
1. B. C. Rudell
2. T. L. Sydnor NUCLEAR ENGINEER-CALVERT CLIFFS 3 R. L. Wenderlich 4 L. O. Wenger *l. W. J. Lippold CC

$$ TECHillCAL -- - ENGINEERS

SPECIALIST

[.k 1 J. P. Steelman c; 1. K. G. Tietjen 2 J. A. Mihalcik

  • Personal background data and job descriptions provided previously.

BALTIMORE GAS AND ELECTRIC COMPANY PRODilCTION MAINTENANCE DEPARTMENT CALVERT CLIFFS NUCLEAR POWER Pl. ANT SUPERVISOR, PLANT ENGINEERING - NUCLEAR GENERAL FOREMAN - NUCLEAR

  • 1. D. W. Latham *1. J. R. Lemons ENGINEERS SENIOR ENGINEER
1. S. E. Jones 1. M. E. Roberson
2. K. W. Mauk 3 T. P. Schafer FNGINEERS PROFESSIONAL ASSOCIATES 1 K. M. Romney
2. M. J. Miernicki
1. R. H. Penny
2. R. T. Jennings ASSISTANT GENERAL FOREMEN
1. R. D. Sheranko 2 W. L. Whitaker 3 R. W. Talley CO CJ
  • Personal background data and job descriptions provided previously.

C3 i)

~:

OUALITY ASSURANCE DEPAR'ItiENT OFF-SITE TECHNICAL IITAFF Total or Cubtotal by subunit Fngineering Ouality Assurance Quality Assurance Ouality Control Mgr. QA

1. Total number (fianagers, Fngineers, and Professional Personnel) 9 3 1 1
2. By education backfrround, e.g. -

B.S. - Nuclear Engineering B.3. - Civil Fngineering 1

- Electrical Engineering 1 1

- Business flanagement 1

- flechanical Engineering 3

- Metallurgical Fngineering 1

- Naval Science 1

- Physics 1 M.S. - (as indicated)

Mgt. & related areas 3

3. Technical Experience (in man-yearn) Total Man-Years Total Man-Years Total Man-Years Total Man-Years
a. Engineering (1) Nuclear Power Field 71 28 12 13 (2) Engineering Management 8 12 25 (3) Total Utility Experience 67 55 8 30 "b. Field (Discipline) (F) (N) (F) (H) (F) (N) (F) (N)

(1) Henci.or Physics (2) Electrical Fngineering (3) Mechanical Engineering 2 51 (1) Civil Engineering 6 10 (5) liealth Physics 10 (6) Quality Assurance 12 4 1 241 7 1 (7) Muclear (oper. & Maint.) 23 16 5 12

,, (8) Metallurgy 13 10

  • ,, (9) Possil Plant Engineer 17

'?]

v f *!ipecify how much experience is (F) - full time nuclear experience, (H) - non-nuclear experience.

C

.

ELECTRIC SYSTEMS OPERATIONS DEPAR'IttENT TECifNICAL STAFF (OFFSITE)

Total or cubtotal by subunit Dept. Manager & Line & Substation Substation System Operations Operationn Eng. Operations Maintenance

1. Total number (Managers, Engineers, and Professional Personnel) 22 10 S 4
2. 11 education background, e.g. -

B.S. - Nuclear Fngineerin;e O O O O B.S. - Electrical Fngineering h 8 1 2

- Fngineering (general) 2 0 0 0

- Mechanical Engineering 0 0 0 1

3. Technical Experience (in man-years) Total Man-Years Total Man-Years Total Man-Years Total Man-Years
a. Engineering (1) Nuclear Power Field 0 0 0 0 (2) Engineering Management 0 0 0 0 (3) Total Utility Experience 56 91 29 42
b. Field (Discipline) (F) (N) (F) (N) (F) (N) (F) (N)

(1) Electrical Engineering 0 86 0 91 0 29 0 42

  • Specify how much experience is (F) - full time nuclear experience, (N) - non-nuclear experience.

O rA c3 i' )

(?

O

ELECTRIC TFST DEPAlflitENT OFF-SITE TECliNIC'L STAFF Manager Area Supply Bulk Power Special Studies Electric System Planning Planning Section Analysis

1. Total flumber 1 11 11 4 7
2. Educational B .S . - El ec . Pngr. I 11 11 3 7

- Mech. Engr. 1 1

- Business 1

- Inst. Engr. 1 M .S . - El ec . Engr. k

- Finan. Mgmt. 1

- bus. Mant 1

- Mgmt. Sc1. 1

- Computer Sci. 2 Juris Doctor 1

3. Technical Exp. Total Man-Years
a. Engineering (1) Nucl. Power Field (2) Entrrg. Mgmt. Ik 56 31 28 12 (3) Total Utility Exp. 23 167 125 83 69
b. Field (Discipline) (F) (N) (F) (N) (F) (N) (F) (N) (F) (N)

(1 ) El ec . Engrg. h 5 11 1 1 O

5

$m u

'p +

C

Brandon Shores Project Department Off-Site Technical Staff

1. Total Number 3
2. Educational Backcround 3.S. - Civil Engr 1

- Mech. Engr. 1 B.E. 1 M.S. - Mech. Engr. 1

- Nuclear Engr. 1

3. Technical Exterience
a. Engineering (1) Nuclear Power Field LO (2) Engineering Mz=t. 3h (3) Total Utility Exper. To
b. Field (?) (N)

Construction M et. 5 3 Mechanical Engrg. 17 Nuclear Engrg. 17 Nuclear Quality Assurance 6 o , g. , s s ej% \> .## k. .b

.

.

EIECTRIC PRODUCTION DEPARTMENT OFF-SITE TECHNICAI, STAFF Chemical Plant Install- Support, Services Performance Generation tinit ationn Unit Section Section Section

1. Total Ilumber h 8 1 17 11 4
2. F;1ucational B.A. - Chemistry 1 H.S. - Chem. Engr. 3 1

- Elec. Fngr. 1

- Mech. Engr. 3 12 8

- Engineering 1 1 1 5 B.E. 1 M.S. - Environmental 1 M.S. - Mech. Engrg. 1 M . S . -- I,1be ral Ar t s 1

3. Technical Exp.
a. (1) Nucl. Power Field h 30 0 21 5 (2) Engrg. Mgmt. 18 20 9.5 h0 127

( 3) Total Utility Exp. 111 212 32 223 295 (F) (N) (F) (N) (F) (N) (F) (N) (P) (N)

b. (1) Reactor Physics (2) Elec. En grg . 1 314 (3) Ifealth Physics h (h) Controls 3 52 (S) ffech. Pngrg. 13 111 13 12 164 12 96 (6) Environmental 8 (7) Chem. Engrg. 83 1 7 (8 ) Spectroscopy 30 (9) Operations 10 7 23 148 C

U O

i) pa N

l'MD TECitf alC Al. ST AF F (OF F-S i ll. )

Maintenance Engineering Plant Engineering Planning & Scheduling Materials Analysts General Supervisson

1. Total Numt>er (Managers, Engi-neers, and Pro-fossional Per- 8 7 2 9 5 sonnel)
2. By Edu4ation Background 4 - II . S . Mechanical 5 - U.S. Mechani- 2 - II . S . Mechanical 2 - 11 . 5 . Mechanical 4 - 11.S. Hechanical Engineering cal Engineer- Engineering Engineering Engineering 1 - II . S . Electricab ing 1 - Assoc. Mech. De- 1 - M.S. Metallurgy 1 - B.S. Chemical Engineering 1 - D.S. Welding sign Engrg. 1 - M.S. Industrial Engineering 1 - II . S . Marine Engi- Engineering Atimi ni s t ra t ion 1 - M.S. Environmen-

. neering 1 - II . S . Electri- tal llcalth-Radia-1 - Doctorate-l.aw cal Engineering tion Safety 1 - II . S . Ind. Engr.

3. Technical Total Man-Years Total Man-Yean's Total Man-Years I~o t a l Man-Years Total Man-Yea:s Experience
a. Engineering (1) Nuclear Power 10 9 1/2 1 14 1/2 13 Field (2) Engineerin9 h 13 0 21 1/2 53 Management (3) Total Utility 130 59 15 96 1/2 99 Experience
b. Field (Discipline (F) (N) ]) (fi) (F) (N) (F) (rl) (F) (N)

(1) Electrical I 7 S Engineering (2) Health Physics 6 (3) Mechanical Engr 8 67 41 41} I 14 4 3 (4) NDE 6 Metalrg 1 4 '

S 14} 44j 3 9 (S) Weldiswl Engr. S Footnote: (F) - full time nuclear experft.. e, (N) - non-nuclear expersence C

.

m P'# Page 1 of l Q

.

.

ELECTHIC EhGINEERING DEPAR'INENT OFF-SITE TECl!NICAL STAFF Electrical Electrical

  • Engineering Mechanical Civil Ihgineering- Syst. Protection & Environmental Mechanical Fngineering Nuclear Transmission lhgineering Generation Commientions FnFineering Ehrineering I & C Group thaineering Fh grg.
1. Total Number 8 8 8 7 6 7 6 12
2. F.1uc at ionni Packrround B.S. - Civil Engrg. 5 2 3

- Mech. thgrg. 1 2 6 3 1 2

- El ec . Phgrg. 7 8 4 1 7

- Chemistry 2

- Geology 1

- 7 oology 1

- Chem Fngrg. 1

- Nucl. thgrg. 1 3

- Physics 1

- thgineering 1 B.A. - Science Felucation 1 M.S. - Civil 1%grg. 1 1

- Mcch. Engr. 1 1

- M,rm t . Science 1 1

- Nuclear thgrg. 1 1

- Business Administration 1 1 1

-

-

Elec. Engr.

Biology

{ ,) 1 1

- Itai11ation Chemistry b..^ al

'

1

- Chem. Ehgrg. 1

~#

- Environ. Ehgrg. 1

- Meteorology 1

- Structures

-- h [] , 1 Ph.D -

-

Itadiation Chemistry Biological Studies

'

,

ca) 1 I

3. Technlent Fxnerience y w a)
a. Engineering -

(1) Nuclear Power Field 26 42 -7 lh 29 30 64 (2) Engrg. Mgmt. 2 21 5 22 7 1 3 12 (3) 'btal Utility Exper. 15h 130 67 64 114 6k 49 203

b. Field (F) (N) (F) (H) (F) (N) (F) (N) (F) (N) (F) (N) (F) (N) (F) (N)

(Q (1) Civil / Structural 19 ST 2 12 40 g

(2) Mechanical /HVAC 2 h

-m (3) Fire Protection 5 19 -

(4 ) Elec. Engrg. 32 98 72 11 13 h(]

'r

,, (5) Environ. Engrg.

(6) Meteorology 10 hk k

130

  1. 3 (7) Mech. Engrg. k 8 27 73 33 11 33

.' 2 ', ..cl ea r Ermer . ,

49

.

Electric Production Department -

On Site Technical Staff

.

Itadiation Nuclear-Plant Nuclear-Plant Safety &

Engineer-Operations Engineer-Performance fluelear Fuel Groun Chemistry

1. Total flumbe r 9 9 3 6
2. Educational Bkgd.

A.S. - Engineering 1 1 A.A. - Ilusiness tfgmt. 1 B.S. - flue l . Engr. 1 1 1

- flech Engr. 1 1 1

- Physics 1

- Chemistry 1 1

- Biochemistry 1

- Naval Science 1

- ftathematics 2

- thgineering 1

- Engineering Science 1 M.S. - fluc l . Engr. 1

3. Technical Experience A. Engineering (1) Nuclear Power Field 28 (98)* 87 31 57 (2) Engr. rtgmt. 2 6 5 6 (3) Total Util. Exp. 18 (58)* 149 20 614 B. Field (F) (N) (F) (N) (F) (N) (F) (N)

(1) Nucl. Engrg. 5 2 (2) Mech. Engrg. 5 2 (3) Operations 98 10 12 (1) Maintenance Staff 4 21 (5) Quality Assurance 7 (6) lleactor Physics 17 (7 ) Elec. Engrg. 6 (8) Chemistry 27 (9) llealth Physics / Rad Chen 55

  • $
  • 1*. Denotes man-years of operators non-engineering background in nuclear power field and for utility.

W Ib

..,

<

.

PRODUCTION MAI!T"ENA' ICE DEPARC4E'IT ON-SITE TECHNICAL STAFF Plant Engineerine Staff General Forenan Staff

1. Total Number 6 7
2. Educa+1onal Backereund 3.S. - Engineering 1

- Mechanical Engineer 2 2

- Electrical Engineer 1 1

- Civil Engineer 1

- Ae ro . Engineer 1 A.S. - Engineer 1 3.A. - Natural Sciences 1 3 Technical Experience

a. Engineering (1) Nuclear Power Field 35 60 (2) Engineering Management 2 L (3) Total Utility Experience 21 35
b. Field (1) Maintenance 23 (2) Mechanical Engineer 2 8 (3) Civil Engineer 2 (h) Electrical Engineer 2 h (5) Engineering 9 o o-a g sssu.is1.t.3

.