Category:Letter
MONTHYEARPLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 ML24260A2312024-09-17017 September 2024 Senior Reactor and Reactor Operator Initial License Examinations 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor2024-09-16016 September 2024 B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) 05000387/LER-2023-004, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-26026 August 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum 05000387/LER-2024-001, Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear2024-08-21021 August 2024 Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) PLA-8123, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 2024-09-06
[Table view] Category:Memoranda
MONTHYEARML23094A1252023-03-31031 March 2023 Talen Part 21 Final Notification P21-03032023-FN R0 Re Defect Identified in Automatic Transfer Switch ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21054A3032021-04-22022 April 2021 Memo to File: Final Ea/Fonsi of Independent Spent Fuel Storage Facilities Decommissioning Funding Plans Related to Susquehanna ML17090A1332017-04-0505 April 2017 Notice of Meeting with Susquehanna Nuclear, LLC to Discuss the Nrc'S Assessment of Safety Performance at Susquehanna Steam Electric Station for 2016 ML17037B8502017-02-0606 February 2017 08/21/1975 Notice of Meeting with Architect Engineers of Mark II Owners to Discuss Load Combinations and Analytical Techniques for Determining Stresses in Mechanical Components and Structures of Mark II Containments ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML15345A0912015-12-17017 December 2015 Closure of Issue Found During 2014 Regulatory Commitment Audit ML15313A2392015-11-0606 November 2015 Request for Additional Information Proposed Relief Requests for the Third 10-Year Inservice Inspection Interval (TAC Nos. MF6302 Through MF6307) ML15093A3052015-04-0303 April 2015 Memorandum to the Participants NRC Staff Notification of Proposed Issuance of Order and Conforming License Amendments Approving Indirect Transfer ML14133A0592014-07-0101 July 2014 Summary of Closed Meeting Between Representatives of the Army Corps of Engineers, Nuclear Regulatory Commission, Federal Energy Regulatory Commission, Exelon Generation Co, LLC, and PPL Susquehanna, LLC, to Discuss Dam Failure Analysis.. ML14085A4112014-05-0606 May 2014 Final TIA Response Susquehanna SGTS and Secondary Ventilation ML14112A2392014-04-22022 April 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Peach Bottom Atomic Power Station Units 2 and 3, Susquehanna Steam Electric Station Units 1 and 2, and Three Mile Island Nuclear Station Unit 1 ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13043A4062013-02-12012 February 2013 Proposed Amendment No. 309 to License NPF-14 and Proposed Amendment No. 280 to License NPF-22: Change to Technical Specification Surveillance Requirement (SR) 3.8.1.9, 3.8.1.11,3.8.1.12, and 3.8.1.19 to Increase Diesel ML13035A2482013-02-0101 February 2013 ME9609 Susquehanna Steam Electric Station Proposed Amendment No. 309 to License NPF-14 and Proposed Amendment No. 280 to License Npf -22: Change to Technical Specification Surveillance Requirement 3.8.1.19 to Increase Diesel Generator E Min ML1114410162011-05-24024 May 2011 Summary of Susquehanna Annual Assessment Meeting, May 19, 2011 ML1014700962010-05-25025 May 2010 Summary of Annual Assessment Meeting with PPL Susquehanna, LLC, to Discuss Nrc'S Assessment of Safety Performance for Calendar Year 2009 ML0925103122009-09-0808 September 2009 Drop-in Visit from PPL Susquehanna, LLC - August 31, 2009 ML0919404402009-07-13013 July 2009 Meeting Summary, Public Meeting with PPL Susquehanna, LLC Re SCWE at Site ML0915505712009-06-0101 June 2009 Meeting Minutes of the Plant License Renewal Subcommittee on April 1, 2009 ML0900803792009-01-30030 January 2009 Summary of Telephone Conference Call Held on 12/18/08, Between the U.S. NRC and PPL Susquehanna, LLC, Concerning TLAA RAI ML0833101132008-12-0303 December 2008 Meeting Summary, Telephone Conference Call Between U.S. NRC and PPL Susquehanna, LLC, Concerning the Draft Request for Additional Information Pertaining to the Susquehanna Steam Electric Station Units 1 & 2, LRA ML0832307862008-11-19019 November 2008 11/13/2008-Summary of Telephone Conference Call Between NRC and PPL, Concerning the Responses to RAIs Pertaining to the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application ML0828901522008-10-21021 October 2008 Summary of Telephone Conference Call Held on October 8, 2008, Between the USNRC and PPL Susquehanna, Llc. Concerning Draft Requests for Additional Information Pertaining to the, License Renewal Application ML0822603532008-10-0101 October 2008 06/25/2008 Meeting Summary, Telephone Conference Call Between the NRC and PPL Susquehanna, LLC, Concerning Draft Request for Additional Information Pertaining to the Susquehanna, Units 1 and 2, License Renewal Application ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0806303822008-03-0505 March 2008 Notice of Meeting with PPL Susquehanna, LLC (PPL) to Discuss Ppl'S Plan Regarding Compliance with the License Conditions Related to the New Steam Dryer During Extended Power Uprate Power Ascension for the Upcoming Refueling Outage ML0728800512007-12-13013 December 2007 Summary of Telephone Conference Call Held on 10/03/07, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, LLC, Concerning Fire ML0728511102007-11-16016 November 2007 Summary of Telephone Conference Call Held on October 3, 2007, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, LLC Concerning Open Items Pertaining to the Susquehanna, Units 1 and 2, License Renewal Application ML0730200012007-10-25025 October 2007 FRN - Power Uprates (Susquehanna), November 14, 2007 ML0726401342007-10-24024 October 2007 Summary of Telephone Conference Call with PPL Susquehanna, LLC Concerning Requests for Additional Information ML0728906522007-10-24024 October 2007 Summary of July 19th Conference Call Between NRC DLR Environmental Staff; PPL Susquehanna, LLC; and PPL Generating Regarding PPL Generation'S Letter of Intent to File a Combined License Application for a Potential New Unit at the SSES Site ML0724900462007-09-18018 September 2007 and 09/05/2007 Summary of Telephone Conference Calls Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, LLC, Concerning D-RAI ML0723304142007-08-27027 August 2007 Summary of Telephone Conference Call Held on August 16, 2007, Between the Us NRC and PPL Susquehanna, Concerning Request for Additional Information Pertaining to the Susquehanna, Units 1 and 2, License Renewal Application ML0721101752007-07-30030 July 2007 Notice of Meeting with PPL Susquehanna, LLC (Ppl), Susquehanna Steam Electric Station, Units 1 and 2, to Conduct a Working Level-Discussion Related to NRC Staff'S Reactor Systems Safety Review of Proposed Extended Power Uprate Application ML0716400652007-06-14014 June 2007 Notice of with PPL Susquehanna, LLC (Ppl), Susquehanna, Units 1 and 2 to Conduct a Working Level-Discussion Related to the Steam Dryer Instrumentation Plan Finite Element Analysis Model Changes, Fabrication Improvements and Start-Up Limit. ML0705800922007-03-0202 March 2007 Summary of Telephone Conference Call Held on February 12, 2007, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, Lcc, Concerning Requests for Additional Information Pertaining to the Susquehanna Steam Electric Station, Un ML0629104092006-11-0909 November 2006 Review of Susquehanna Steam Electric Station Units 1 and 2 Amendment Request to Revise Technical Specifications 3.8.1 ML0624202762006-08-30030 August 2006 09/13/2006 Notice of Forthcoming Meeting with PPL Susquehanna, LLC (PPL) Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) on Pre-License Renewal Application ML0608107012006-03-22022 March 2006 04/05/06 - Forthcoming Meeting with PPL Susquehanna, LLC (Ppl), Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2) on License Renewal and Extended Power Uprate ML0530704902005-11-0303 November 2005 Forthcoming Meeting with PPL Susquehanna, LLC (Ppl), Susquehanna, Units 1 and 2 to Conduct a Working level-discussion Related to the Schedule, Approach, and Strategy for the Proposed Extended Power Uprate Application.. ML0527103892005-09-29029 September 2005 Meeting with PPL Susquehanna 1 & 2, Schedule, Approach and Strategy for the SSES Unit 1 Cycle 14 and Cycle 15 Minimum Critical Power Ratio Safety Limit Submittals in Light of the Control Cell Friction Issues Experienced on Unit 1 ML0510804732005-04-29029 April 2005 Correction to Letter Approving the Use of the Privatel Model 960V Validated to Federal Information Processing Standard (Fips) 140-1 ML0403001132004-01-30030 January 2004 Correction of License Authority Files ML0235404372002-12-18018 December 2002 Rquest for Additonal Information (RAI) for Emergency Plan (E-Plan) Revisions PLA-5567 - Attachment ML0235200602002-12-18018 December 2002 Draft Request for Additional Information (RAI) Response Regarding Amendment Request for Emergency Plan (E-Plan) Revisions ML0229705292002-10-24024 October 2002 Results of the Susquehanna Steam Electric Station Units 1 and 2 SDP Phase 2 Notebook Benchmarking Visit ML0226002922002-09-17017 September 2002 Memorandum Regarding Report on the Status of Open TIAs Assigned to NRR ML0219802582002-07-17017 July 2002 Safety Evaluation Input for Proposed Changes to the Susquehanna, Units 1 & 2 Technical Specifications Implementing Operability Requirements for the Ultimate Heat Sink Spray Valves (TAC Nos. MB2119 & MB2120) 2023-03-31
[Table view] Category:Note to File incl Telcon Record
MONTHYEARML18347A2722018-12-12012 December 2018 Conversation Record with M. Krick/ Susquehanna Steam Electric Station RAI Regarding 2015 Triennial Decommissioning Funding Plan (DFP) Update (Conversation Held on December 12, 2018) (Dkt No. 72.0028) ML1015304112010-06-0707 June 2010 Summary of Conference Call with Boiling Water Reactor Vessel and Internals Project Regarding Recent Operating Experience Associated with Replacement Steam Dryer ML0832307862008-11-19019 November 2008 11/13/2008-Summary of Telephone Conference Call Between NRC and PPL, Concerning the Responses to RAIs Pertaining to the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application ML0832209472008-11-19019 November 2008 Summary of Telephone Conference Call Held on October 10, 2008, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, Llc., Concerning the Responses to Requests for Additional Information Pertaining to the Susquehanna Steam... ML0728800512007-12-13013 December 2007 Summary of Telephone Conference Call Held on 10/03/07, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, LLC, Concerning Fire ML0728511102007-11-16016 November 2007 Summary of Telephone Conference Call Held on October 3, 2007, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, LLC Concerning Open Items Pertaining to the Susquehanna, Units 1 and 2, License Renewal Application ML0728906522007-10-24024 October 2007 Summary of July 19th Conference Call Between NRC DLR Environmental Staff; PPL Susquehanna, LLC; and PPL Generating Regarding PPL Generation'S Letter of Intent to File a Combined License Application for a Potential New Unit at the SSES Site ML0726401342007-10-24024 October 2007 Summary of Telephone Conference Call with PPL Susquehanna, LLC Concerning Requests for Additional Information ML0715105492007-06-15015 June 2007 Summary of Telephone Conference Call Held on May 29, 2007, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, LLC, Concerning Requests for Additional Information Pertaining to the Susquehanna Steam Electric Station, Units 1 ML0705800922007-03-0202 March 2007 Summary of Telephone Conference Call Held on February 12, 2007, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, Lcc, Concerning Requests for Additional Information Pertaining to the Susquehanna Steam Electric Station, Un ML0607600212006-03-16016 March 2006 Summary of 03/14/06 Phone Call Between Eric Epstein, Chairman, Three Mile Island Alert, Inc,. and NRC Staff Regarding Proposed Spent Fuel Exemption for the Susquehanna Nuclear Generating Station ML0703804662006-03-14014 March 2006 License Renewal Scoping Meeting Handouts: TMI-Alert Exhibits ML18025A2611977-01-19019 January 1977 Letter Documenting Responses to Questions Given to Mr. Singh Bawa of the NRC from Pp&L'S Mr. E.D. Testa in Telephone Conversations on 1/17/1977 and 01/18/1977 2018-12-12
[Table view] Category:Verbal Comm
MONTHYEARML18347A2722018-12-12012 December 2018 Conversation Record with M. Krick/ Susquehanna Steam Electric Station RAI Regarding 2015 Triennial Decommissioning Funding Plan (DFP) Update (Conversation Held on December 12, 2018) (Dkt No. 72.0028) ML1015304112010-06-0707 June 2010 Summary of Conference Call with Boiling Water Reactor Vessel and Internals Project Regarding Recent Operating Experience Associated with Replacement Steam Dryer ML0832307862008-11-19019 November 2008 11/13/2008-Summary of Telephone Conference Call Between NRC and PPL, Concerning the Responses to RAIs Pertaining to the Susquehanna Steam Electric Station, Units 1 and 2, License Renewal Application ML0832209472008-11-19019 November 2008 Summary of Telephone Conference Call Held on October 10, 2008, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, Llc., Concerning the Responses to Requests for Additional Information Pertaining to the Susquehanna Steam... ML0728800512007-12-13013 December 2007 Summary of Telephone Conference Call Held on 10/03/07, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, LLC, Concerning Fire ML0728511102007-11-16016 November 2007 Summary of Telephone Conference Call Held on October 3, 2007, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, LLC Concerning Open Items Pertaining to the Susquehanna, Units 1 and 2, License Renewal Application ML0728906522007-10-24024 October 2007 Summary of July 19th Conference Call Between NRC DLR Environmental Staff; PPL Susquehanna, LLC; and PPL Generating Regarding PPL Generation'S Letter of Intent to File a Combined License Application for a Potential New Unit at the SSES Site ML0726401342007-10-24024 October 2007 Summary of Telephone Conference Call with PPL Susquehanna, LLC Concerning Requests for Additional Information ML0715105492007-06-15015 June 2007 Summary of Telephone Conference Call Held on May 29, 2007, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, LLC, Concerning Requests for Additional Information Pertaining to the Susquehanna Steam Electric Station, Units 1 ML0705800922007-03-0202 March 2007 Summary of Telephone Conference Call Held on February 12, 2007, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, Lcc, Concerning Requests for Additional Information Pertaining to the Susquehanna Steam Electric Station, Un ML0607600212006-03-16016 March 2006 Summary of 03/14/06 Phone Call Between Eric Epstein, Chairman, Three Mile Island Alert, Inc,. and NRC Staff Regarding Proposed Spent Fuel Exemption for the Susquehanna Nuclear Generating Station ML0703804662006-03-14014 March 2006 License Renewal Scoping Meeting Handouts: TMI-Alert Exhibits ML18025A2611977-01-19019 January 1977 Letter Documenting Responses to Questions Given to Mr. Singh Bawa of the NRC from Pp&L'S Mr. E.D. Testa in Telephone Conversations on 1/17/1977 and 01/18/1977 2018-12-12
[Table view] |
Text
October 24, 2007
LICENSEE: PPL Susquehanna, LLC FACILITY: Susquehanna Steam Electric Station, Units 1 & 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JULY 19, 2007, BETWEEN THE U.S. NUCLER REGULATORY COMMISSION, PPL SUSQUEHANNA, LLC, AND PPL GENERATION REGARDING PPL GENERATION'S LETTER OF INTENT TO FILE A COMBINED LICENSE APPLICATION FOR A POTENTIAL NEW UNIT AT THE SUSQUEHANNA STEAM ELECTRIC STATION SITE U.S. Nuclear Regulatory Commission environmental staff (NRC or the staff), representatives of PPL Susquehanna, LLC, and representatives of PPL Generation held a telephone conference call on July 19, 2007, to discuss and clarify PPL Generation's May 24 and June 13, 2007, letters regarding intent to file a combined license application for a new nuclear power plant at the Susquehanna Steam Electric Station (SSES) site. The telephone conference provided information necessary for the staff to address potential cumulative impacts to the SSES site and related resources from reasonably foreseeable future plant construction and operation.
Enclosure 1 provides a list of the participants and Enclosure 2 summarizes the discussion among the staff, PPL Generation and PPL Susquehanna.
/RA/ Drew Stuyvenberg, Environmental Project Manager Environmental Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
Enclosures:
- 1. List of Participants 2. Discussion Summary cc w/encls: See next page
ML072890652 OFFICE LA:DLR PM:DLR:REBB PM:DLR:REBB BC:DLR:REBB
NAME IKing DStuyvenberg JDavis RFranovich
DATE 10/18/07 10/18/07 10/19/07 10/24/07 TELEPHONE CONFERENCE CALL BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION, PPL SUSQEHANNA, LLC AND PPL GENERATION LIST OF PARTICIPANTS JULY 19, 2007 PARTICIPANT AFFILIATION Drew Stuyvenberg U.S. Nuclear Regulatory Commission (NRC) Harriet Nash NRC Dennis Logan NRC Nathan Goodman NRC Elizabeth Wexler NRC Ekaterina Lenning NRC Jeffrey Rikhoff NRC Mike Detamore PPL Susquehanna, LLC Duane Filchner PPL Susquehanna Rocco Sgarro PPL Susquehanna Jerry Fields PPL Susquehanna Terry Harpster PPL Generation Fred Eisenhuth PPL Generation DISCUSSION
SUMMARY
FROM THE JULY 19, 2007 CONFERENCE CALL BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION, PPL SUSQUEHANNA, LLC AND PPL GENERATION REGARDING PPL GENERATION'S LETTER OF INTENT TO FILE A COMBINED LICENSE APPLICATION FOR A POTENTIAL NEW UNIT AT THE SUSQUEHANNA STEAM ELECTRIC STATION SITE
Background:
The U.S. Nuclear Regulatory Commission (NRC or the staff), representatives of PPL Susquehanna, LLC, and representatives of PPL Generation held a telephone conference call on July 19, 2007, to discuss and clarify PPL Generation's May 24 and June 13, 2007, letters regarding intent to file a combined license (COL) application for a new unit at the Susquehanna Steam Electric Station (SSES) site.
NRC staff requested the conference call to obtain sufficient information to address cumulative impacts as described in 40 CFR 1508.7, adopted by NRC in 10 CFR 51.14b, and included in Regulatory Guide 4.2, Supplement 1, on page 4.2-S-6:
Cumulative impact is the impact on the environment which results from the incremental impact of the action when added to other past, present, and reasonably foreseeable future actions regardless of what agency (Federal or non-Federal) or person undertakes such other actions. Cumulative impacts can result from individually minor but collectively significant actions taking place over a period of time.
PPL Generation's letters of intent to file a COL made a new unit onsite a "reasonably foreseeable future action." Since PPL Generation submitted their letters of intent after the license renewal environmental site audit, the staff requested a conference call to address potential cumulative impacts should PPL Generation choose to proceed with an additional unit at the SSES site. Duane Filchner, Senior Engineer - Regulatory Affairs for PPL Susquehanna, coordinated involvement by PPL Susquehanna and PPL Generation representatives.
This call provided the staff with adequate information to address cumulative impacts related to a potential additional unit, as PPL Generation indicated in the May 24 and June 13 letters, or two additional units, as PPL Generation indicated was ultimately possible during the July 19 conference call. Should PPL Generation (or any other organization) proceed to file a COL, the staff would then perform a more-complete environmental review in the process of developing an environmental impact statement for the new unit(s).
The conference commenced at 10:05 A.M. with brief introductions.
Topics: 1. Overview of PPL Generation's activities and plans related to a potential COL submittal in 2008 (information in this and subsequent sections provided by Terry Harpster, General Manager - Site Development, PPL Generation, unless otherwise noted.)
PPL Generation considered seven alternative sites before selecting land west of the current SSES plant (SSES site land west of Township Rd. T438) as the best candidate site for one or two potential new reactors.
PPL Generation will be performing due diligence on the site and on any future plans for that site. PPL Generation is analyzing applicable local and state permitting requirements for preliminary work, and will do so for future work should PPL Generation move forward on the project.
At this point, PPL Generation has not selected a vendor for the new unit(s). The unit's (or units') systems and footprints will depend upon the reactor design PPL Generation ultimately chooses to pursue. Other plant systems - including cooling system selection - will also depend on the unit design chosen. The unit(s) will require river intake and outflow structures separate from the existing SSES facility.
New reactors at the site will only share transmission systems with the existing SSES. Currently, PPL Generation analysis indicates that existing transmission lines are sufficient to deliver energy from a future unit or units. The unit(s) will share no other systems with the existing SSES. The only other synergies between existing and potential future units will be in emergency planning.
At this point, PPL Generation has committed only to preliminary site work for a 3 rd and a potential 4 th reactor (beginning in August of 2007), and has yet to identify a joint venture partner for the potential new unit(s). PPL Generation does not plan to continue with the project in the absence of a joint venture partner.
- 2. Description of potential unit cooling system PPL Generation indicated that the cooling system design of the unit would be dependent on which unit design PPL Generation ultimately selects, and may include either mechanical or natural draft cooling towers. NRC staff noted that a new unit would have to use some sort of cooling system other than once-through cooling under the Environmental Protection Agency 316(b) rules. Placement of a potential 4 th unit could influence PPL Generation's choice of a cooling system for the new unit(s). Regardless of the cooling system selected, the unit(s) would need new intake and discharge structures.
PPL Generation noted that the Susquehanna River would be the unit's (or units') cooling water source, and indicated that consumptive use of water from the Susquehanna River would require approval from the Susquehanna River Basin Commission. PPL Susquehanna staff (Jerry Fields, Senior Environmental Scientist - Nuclear) indicated that the Pennsylvania Department of Environmental Protection would oversee impingement and entrainment issues.
- 3. Interface with transmission system
PPL Generation confirmed that a new unit or units would be able to connect directly to the existing transmission system without modifications to the existing system. Any potential enhancements would be minor. PPL Generation also indicated that a new transmission line proposed by PPL Electric Utilities and recently approved by PJM Interconnection (PJM; 500 kV, 150 miles from Susquehanna substation to Roseland, NJ, substation) is not related to a potential new unit or units. Any new units would require permission from PJM to use the new lines, and would be subject to a PJM system interconnect study.
Conference concluded at 10:50 A.M. with no further questions from NRC reviewers.
PPL Susquehanna, LLC from D. Stuyvenberg dated October 24, 2007
DISTRIBUTION:
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JULY 19, 2007 BETWEEN THE NUCLER REGULATORY COMMISSION, PPL SUSQUEHANNA, LLC AND PPL GENERATION REGARDING PPL GENERATION'S LETTER OF INTENT TO FILE A COMBINED LICENSE APPLICATION FOR A POTENTIAL NEW UNIT AT THE SUSQUEHANNA STEAM ELECTRIC STATION SITE
HARD COPY DLR R/F E-MAIL: PUBLIC SUttal RidsNrrDlr RidsNrrDlrRebb RidsOgcMailCenter
DStuyvenberg JDavis EGettys RGuzman Susquehanna Steam Electric Station, Units 1 and 2 cc: Cornelius J. Gannon Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467
Robert M. Paley General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467
Rocco R. Sgarro Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179
Walter E. Morrissey Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Michael H. Crowthers Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179
Ronald E. Smith General Manager - Site Preparedness and Services PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467
Steven M. Cook Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467
Luis A. Ramos Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 Bryan A. Snapp, Esq. Associate General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179
Supervisor - Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179
Richard W. Osborne Allegheny Electric Cooperative, Inc. 212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266 Director, Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406
Susquehanna Steam Electric Station, Units 1 and 2 cc: Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803