Summary of Telephone Conference Call Held on October 10, 2008, Between the U.S. Nuclear Regulatory Commission and PPL Susquehanna, Llc., Concerning the Responses to Requests for Additional Information Pertaining to the Susquehanna Steam...
ML083220947
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/19/2008
From: Gettys E
License Renewal Projects Branch 1
To:
Gettys Evelyn, NRR/DLR/RPB1 415-4029
References
Download: ML083220947 (5)


Text

November 19, 2008 LICENSEE: PPL Susquehanna, LLC FACILITY: Susquehanna Steam Electric Station, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 10, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PPL SUSQUEHANNA, LLC., CONCERNING THE RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of PPL Susquehanna, LLC (PPL) held a telephone conference call on October 10, 2008, to discuss PPLs response to requests for additional information (RAIs) concerning the Susquehanna Steam Electric Station, Units 1 and 2, license renewal application (LRA). By letter dated July 3, 2008, the NRC staff sent PPL RAIs on the Aging Management of Electrical and Instrumentation and Controls section of the LRA. In a letter dated August 5, 2008, PPL responded to RAI 3.6-1 and stated that there is no need for an aging management program (AMP) for metallic fuse holders. This is inconsistent with the Generic Aging Lessons Learned Report. Therefore, the staff asked PPL to amend its response to include an AMP for the metallic fuse holders.

With regard to RAI 3.6-2 concerning the margin calculations, for the transmission lines the applicants response was not acceptable. PPL indicated that it would review its calculations and amend its response to RAI 3.6-2 if needed.

The Enclosure provides a listing of the participants.

The applicant had an opportunity to comment on this summary.

\RA\

Evelyn Gettys, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

As stated cc w/encl: See next page

ML083220947 OFFICE LA:DLR PM:RPB1:DLR BC: RPB1:DLR NAME IKing EGettys DPelton DATE 11/18/08 11/19/08 11/19/08 TELEPHONE CONFERENCE CALL SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS October 10, 2008 PARTICIPANTS AFFILIATIONS Evelyn Gettys U.S. Nuclear Regulatory Commission (NRC)

Duc Nguyen NRC Duane Filchner PPL Susquehanna, LLC (PPL)

Dave Flyte PPL ENCLOSURE

Letter to PPL Susquehanna, LLC from E. Gettys, dated November 19, 2008 DISTRIBUTION:

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 10, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PPL SUSQUEHANNA, LLC., CONCERNING THE RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSrxb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter EGettys FJaxheimer

Susquehanna Steam Electric Station, Units 1 and 2 cc:

Cornelius J. Gannon Michael H. Rose Vice President - Nuclear Operations Manager - Quality Assurance PPL Susquehanna, LLC PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Joseph J. Scopelliti Robert M. Paley Community Relations Manager, General Manager - Plant Support Susquehanna PPL Susquehanna, LLC PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 634 Salem Blvd., SSO Berwick, PA 18603-0467 Berwick, PA 18603-0467 Rocco R. Sgarro Bryan A. Snapp, Esq.

Manager - Nuclear Regulatory Affairs Associate General Counsel PPL Susquehanna, LLC PPL Services Corporation Two North Ninth Street, GENPL4 Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Allentown, PA 18101-1179 Supervisor - Nuclear Regulatory Affairs Document Control Services PPL Susquehanna, LLC PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Two North Ninth Street, GENPL4 Berwick, PA 18603-0467 Allentown, PA 18101-1179 Michael H. Crowthers Richard W. Osborne Supervisor - Nuclear Regulatory Affairs Allegheny Electric Cooperative, Inc.

PPL Susquehanna, LLC 212 Locust Street Two North Ninth Street, GENPL4 P.O. Box 1266 Allentown, PA 18101-1179 Harrisburg, PA 17108-1266 Ronald E. Smith Director, Bureau of Radiation Protection General Manager - Site Preparedness Pennsylvania Department of and Services Environmental Protection PPL Susquehanna, LLC Rachel Carson State Office Building 769 Salem Blvd., NUCSA4 P.O. Box 8469 Berwick, PA 18603-0467 Harrisburg, PA 17105-8469 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035

Susquehanna Steam Electric Station, Units 1 and 2 cc:

Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Berwick, PA 18603-0467 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803