February 28, 2024
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (REPORTS 05000387/2023006 AND 05000388/2023006)
Dear Brad Berryman:
The U.S Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Susquehanna Steam Electric Station (Susquehanna), Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023 through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at Susquehanna, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e.,
Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2025.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5337 with any questions you have regarding this letter.
Sincerely, Jonathan E. Greives, Chief Projects Branch 4 Division of Operating Reactor Safety
Docket Nos. 05000387 and 05000388 License Nos. NPF-14 and NPF-22
Enclosure:
As stated
cc w/ encl: Distribution via LISTSERV
Jonathan E.
Greives Digitally signed by Jonathan E. Greives Date: 2024.02.28 07:46:28 -05'00'
SUNSI Review
x Non-Sensitive Sensitive
x Publicly Available
Non-Publicly Available
OFFICE RI/DORS RI/DORS
NAME SHaney JGreives
DATE 2/26/2024 2/22/2024
Site Inspection Activity Plan Susquehanna 01/01/2024 - 12/31/2025 Unit Start End Activity CAC Title Staff Count RP - 71124.03 Airborne
1,2 1/15/2024 1/19/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 1/15/2024 1/19/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Commercial Grade Dedication - Susquehanna
1,2 1/29/2024 2/2/2024 IP 71111.21N.03 001808 Commercial Grade Dedication 1,2 2/12/2024 2/16/2024 IP 71111.21N.03 001808 Commercial Grade Dedication RP - 71124.04 Dosimetry
1,2 2/5/2024 2/9/2024 IP 71124.04 000728 Occupational Dose Assessment 1,2 2/5/2024 2/9/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Inservice Inspection - Susquehanna Unit 1
1 4/1/2024 4/5/2024 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1,2 4/1/2024 4/5/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 4/1/2024 4/5/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - SQ
1,2 7/29/2024 8/2/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 8/19/2024 8/23/2024 IP 71130.03 000735 Contingency Response - Force-On-Force Testing PI&R Biennial Team Inspection - Susquehanna
1,2 9/16/2024 9/20/2024 IP 71152B 000747 Problem Identification and Resolution 1,2 9/30/2024 10/4/2024 IP 71152B 000747 Problem Identification and Resolution EP Exercise Inspection - Susquehanna
1,2 10/21/2024 10/25/2024 IP 71114.01 000716 Exercise Evaluation 1,2 10/21/2024 10/25/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 10/21/2024 10/25/2024 IP 71151 001397 Performance Indicator Verification Cyber Security - Susquehanna
1,2 10/28/2024 11/1/2024 IP 71130.10 000741 Cybersecurity RP - 71124.06 RETS and 71151 PIV
1,2 11/4/2024 11/8/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 11/4/2024 11/8/2024 IP 71151 000746 Performance Indicator Verification Access Control, Equipment Testing and Maintenance, Training, SPR
1,2 12/2/2024 12/6/2024 IP 71130.02 000734 Access Control Prepared on 2/20/2024 2:12:48 PM 1 of 3
Site Inspection Activity Plan 1,2 12/2/2024 12/6/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 12/2/2024 12/6/2024 IP 71130.07 000739 Security Training 1,2 12/2/2024 12/6/2024 IP 71130.09 001656 Security Plan Changes 1,2 12/2/2024 12/6/2024 IP 71151 001338 Performance Indicator Verification Inservice Inspection - Susquehanna Unit 2
2 3/31/2025 4/4/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1,2 3/31/2025 4/4/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls RP - 71124.05 Instruments
1,2 6/2/2025 6/6/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation Material Control and Accounting - Susquehanna
1,2 7/14/2025 7/18/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)
2025 SQ Initial Operator Licensing Exam
1,2 6/16/2025 6/20/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1,2 7/21/2025 7/25/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
1,2 7/28/2025 8/1/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program Comprehensive Engineering Team Inspection - Susquehanna
1,2 8/25/2025 8/29/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2 9/8/2025 9/12/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection SQ Requal Inspection with P/F Results
1,2 9/22/2025 9/26/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1,2 9/22/2025 9/26/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance EP Program Inspection - Susquehanna
1,2 10/27/2025 10/31/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 10/27/2025 10/31/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 10/27/2025 10/31/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 10/27/2025 10/31/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 10/27/2025 10/31/2025 IP 71151 001397 Performance Indicator Verification Access Control, AA, FFD, Sec Plan Review, PI - Susq
1,2 11/3/2025 11/7/2025 IP 71130.01 000733 Access Authorization 1,2 11/3/2025 11/7/2025 IP 71130.02 000734 Access Control 1,2 11/3/2025 11/7/2025 IP 71130.08 000740 Fitness-For-Duty Program 1,2 11/3/2025 11/7/2025 IP 71130.09 001656 Security Plan Changes 1,2 11/3/2025 11/7/2025 IP 71151 001338 Performance Indicator Verification Prepared on 2/20/2024 2:12:48 PM 2 of 3
Site Inspection Activity Plan RP - 71124.08 Rad Transportation PIV
1,2 11/17/2025 11/21/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 11/17/2025 11/21/2025 IP 71151 000746 Performance Indicator Verification Prepared on 2/20/2024 2:12:48 PM 3 of 3