IR 05000461-10-003, 08/03/2010, & 09/01/2010 - 09/02/2010, Acknowledgment of Three Disputed Violations - Clinton Power Station
ML102660135
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/22/2010
From: Ring M
NRC/RGN-III/DRP/B1
To: Pacilio J
Exelon Generation Co, Exelon Nuclear
References
ea-10-185, ea-10-186, ea-10-187 IR-10-003
Download: ML102660135 (3)


See also: IR 05000461/2010003

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352

September 22, 2010

EA-10-185; EA-10-186; EA-10-187

Mr. Michael J. Pacilio

Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer (CNO), Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS - CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003

Dear Mr. Pacilio:

This letter acknowledges three letters you sent to the U.S. Nuclear Regulatory Commission

(NRC), two letters dated September 1, 2010, and one letter dated September 2, 2010, which

provide a response to our inspection report issued on August 3, 2010, concerning activities

conducted at Clinton Power Station. The three letters you sent each contested a separate

Non-Cited Violation (NCV) contained in the inspection report. The contested NCVs are: 05000461/2010003-01 "Failure to Satisfy 10 CFR 50.72 and 50.73 Reporting Requirements,"05000461/2010003-02 "Failure to Perform an Adequate 10 CFR 50.59 Evaluation for CPS

Procedure 3711.01," and 05000461/2010003-04 "Inadequate Emergency Plan Augmentation

Call-In Drills."

We are currently reviewing your basis for contesting the above NCVs. The NRC seeks to be thorough and timely in the review of licensee responses to NCVs. Accordingly, we will inform

you as soon as we complete our evaluation.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Website at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark A. Ring, Chief

Branch 1 Division of Reactor Projects

Docket No. 50-461

License No. NPF-62

cc: Distribution via ListServ

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352

September 22, 2010

EA-10-185; EA-10-186; EA-10-187

Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer (CNO), Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS - CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003

Dear Mr. Pacilio:

This letter acknowledges three letters you sent to the U.S. Nuclear Regulatory Commission (NRC), two letters dated September 1, 2010, and one letter dated September 2, 2010, which

provide a response to our inspection report issued on August 3, 2010, concerning activities

conducted at Clinton Power Station. The three letters you sent each contested a separate

Non-Cited Violation (NCV) contained in the inspection report. The contested NCVs are: 05000461/2010003-01 "Failure to Satisfy 10 CFR 50.72 and 50.73 Reporting Requirements,"05000461/2010003-02 "Failure to Perform an Adequate 10 CFR 50.59 Evaluation for CPS Procedure 3711.01," and 05000461/2010003-04 "Inadequate Emergency Plan Augmentation

Call-In Drills."

We are currently reviewing your basis for contesting the above NCVs. The NRC seeks to be thorough and timely in the review of licensee responses to NCVs. Accordingly, we will inform you as soon as we complete our evaluation.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, /RA/ Mark A. Ring, Chief

Branch 1 Division of Reactor Projects

Docket No. 50-461

License No. NPF-62

cc: Distribution via ListServ DISTRIBUTION:

See next page DOCUMENT NAME: G:\1-Secy\1-Work In Progress\Clinton Contested Violations 9-1-2010.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in th

e concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII E RIII N RIII E NAME MRing:cs HPeterson PLougheed for SOrth

DATE 09/22/10 09/22/10 09/22/10

OFFICIAL RECORD COPY

Letter to M. Pacilio from M. Ring dated September 22, 2010

SUBJECT: ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS - CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003

DISTRIBUTION

Daniel Merzke

RidsNrrDorlLpl3-2 Resource

RidsNrrPMClinton Resource

RidsNrrDirsIrib Resource Steven Reynolds

Steven Orth

Patricia Lougheed