September 22, 2010
EA-10-185; EA-10-186; EA-10-187 Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS - CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003
Dear Mr. Pacilio:
This letter acknowledges three letters you sent to the U.S. Nuclear Regulatory Commission (NRC), two letters dated September 1, 2010, and one letter dated September 2, 2010, which provide a response to our inspection report issued on August 3, 2010, concerning activities conducted at Clinton Power Station. The three letters you sent each contested a separate Non-Cited Violation (NCV) contained in the inspection report. The contested NCVs are: 05000461/2010003-01 "Failure to Satisfy 10 CFR 50.72 and 50.73 Reporting Requirements,"05000461/2010003-02 "Failure to Perform an Adequate 10 CFR 50.59 Evaluation for CPS Procedure 3711.01," and 05000461/2010003-04 "Inadequate Emergency Plan Augmentation
Call-In Drills."
We are currently reviewing your basis for contesting the above NCVs. The NRC seeks to be thorough and timely in the review of licensee responses to NCVs. Accordingly, we will inform you as soon as we complete our evaluation.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/
Mark A. Ring, Chief Branch 1 Division of Reactor Projects
Docket No. 50-461 License No. NPF-62
cc: Distribution via ListServ September 22, 2010 EA-10-185; EA-10-186; EA-10-187
Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS - CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003
Dear Mr. Pacilio:
This letter acknowledges three letters you sent to the U.S. Nuclear Regulatory Commission (NRC), two letters dated September 1, 2010, and one letter dated September 2, 2010, which provide a response to our inspection report issued on August 3, 2010, concerning activities conducted at Clinton Power Station. The three letters you sent each contested a separate Non-Cited Violation (NCV) contained in the inspection report. The contested NCVs are:
05000461/2010003-01 "Failure to Satisfy 10 CFR 50.72 and 50.73 Reporting Requirements,"05000461/2010003-02 "Failure to Perform an Adequate 10 CFR 50.59 Evaluation for CPS Procedure 3711.01," and 05000461/2010003-04 "Inadequate Emergency Plan Augmentation
Call-In Drills."
We are currently reviewing your basis for contesting the above NCVs. The NRC seeks to be thorough and timely in the review of licensee responses to NCVs. Accordingly, we will inform you as soon as we complete our evaluation.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/ Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62 cc: Distribution via ListServ DISTRIBUTION:
See next page DOCUMENT NAME: G:\1-Secy\1-Work In Progress\Clinton Contested Violations 9-1-2010.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in th e concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII N RIII E NAME MRing:cs HPeterson PLougheed for SOrth DATE 09/22/10 09/22/10 09/22/10 OFFICIAL RECORD COPY Letter to from M. Ring dated September 22, 2010
SUBJECT: ACKNOWLEDGMENT OF THREE DISPUTED VIOLATIONS - CLINTON POWER STATION NRC INSPECTION REPORT 05000461/2010-003
DISTRIBUTION
RidsNrrDorlLpl3-2 Resource
RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Steven Reynolds Steven Orth Patricia Lougheed Jared Heck Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak ROPreports Resource