IR 05000261/2011001

From kanterella
Revision as of 22:03, 10 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Annual Assessment Letter (Report 05000261/2011001)
ML110630060
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/04/2011
From: Mccree V
Region 1 Administrator
To: Duncan R
Carolina Power & Light Co
Shared Package
ML110630051 List:
References
IR-11-001
Download: ML110630060 (2)


Text

Inspection / Activity Plan Page 1 of 2 03/04/2011 06:53:11 Report 22 03/01/2011-06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson 95002-95002 SUPPLEMENTAL INSPECTION 8 2 IP Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Perfor 95002 05/31/2011 06/10/2011 95001-95001 SUPPLEMENTAL INSPECTION 2 2 IP Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 95001 03/21/2011 03/25/2011 PSB1-RP-RP PUBLIC RADIATION SAFETY INSP 5 2 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 05/23/2011 05/27/2011 2 IP Occupational Dose Assessment 71124.04 05/23/2011 05/27/2011 2 IP Radiation Monitoring Instrumentation 71124.05 05/23/2011 05/27/2011 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/23/2011 05/27/2011 2 IP Performance Indicator Verification 71151 05/23/2011 05/27/2011 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 2 IP Exercise Evaluation 7111401 05/23/2011 05/27/2011 2 IP Emergency Action Level and Emergency Plan Changes 7111404 05/23/2011 05/27/2011 2 IP Performance Indicator Verification 71151 05/23/2011 05/27/2011 OL EXAM-INITIAL EXAM PREP 4 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES V23363 11/07/2011 11/11/2011 OL EXAM-INITIAL EXAM - WEEK 1 4 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES V23363 11/28/2011 12/02/2011 OL EXAM-INITIAL EXAM - WEEK 2 4 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES V23363 12/05/2011 12/09/2011 PSB1-RP-OCCUPATIONAL RP BASELINE WK1 3 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/23/2012 01/27/2012 2 IP Occupational ALARA Planning and Controls 71124.02 01/23/2012 01/27/2012 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 01/23/2012 01/27/2012 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 01/23/2012 01/27/2012 2 IP Performance Indicator Verification 71151 01/23/2012 01/27/2012 EB3 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR 7111108P 01/30/2012 02/03/2012 PSB1-RP-OCCUPATIONAL RP BASELINE WK2 4 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/06/2012 02/10/2012 2 IP Occupational ALARA Planning and Controls 71124.02 02/06/2012 02/10/2012 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/06/2012 02/10/2012 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 02/06/2012 02/10/2012 2 IP Performance Indicator Verification 71151 02/06/2012 02/10/2012 This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Inspection / Activity Plan Page 2 of 2 03/04/2011 06:53:11 Report 22 03/01/2011-06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 2 IP Identification and Resolution of Problems 71152B 05/07/2012 05/11/2012 2 IP Identification and Resolution of Problems 71152B 05/21/2012 05/25/2012 PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 1 2 IP A lert and Notification System Testing 7111402 05/21/2012 05/25/2012 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/21/2012 05/25/2012 2 IP Emergency Action Level and Emergency Plan Changes 7111404 05/21/2012 05/25/2012 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/21/2012 05/25/2012 2 IP Performance Indicator Verification 71151 05/21/2012 05/25/2012 EB3 HS-TRIENNIAL HEAT SINK INSPECTION 1 2 IP Heat Sink Performance 7111107T 06/04/2012 06/08/2012 This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.