ML17262A769

From kanterella
Revision as of 03:51, 19 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Part 21 Re Victoreen Field Calibr Source Being Accepted W/O Meeting Purchase Order Requirements.Initially Reported on 920220.Field Source Will Be Calibr & Returned in Apr 1992
ML17262A769
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/24/1992
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC
References
REF-PT21-92 NUDOCS 9203180013
Download: ML17262A769 (6)


Text

ACCELERATED DISTRIBUTION DEMONST$&TION SYSTEM REGULATO..

INFORMATION DISTRIBUTION

..-STEM (RIDS)AG FUSION NBR:9203180013 DOC.DATE: 92/02/24 NOTARIZED:

NO FACIAL;.50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION NRC-No Detailed Affiliation Given DOCKET 05000244

SUBJECT:

Initial part 21 rept re Victoreen field calibr source S/N 109, model 878-10.Source accepted w/out meeting purchase order requirements, creating potential to allow use of source to calibr containment radiation monitors.DISTRIBUTION CODE: IE19D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Part 21 Rept (50 DKT.)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DSP/ROAB NRR/DRIS/RVIB9D RES/DSIR/EIB RGN2 RGN4 SECY VANDERMEL EXTERNAL: INPO RECORD CTR NSIC SILVER,E COPIES LTTR ENCL 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD NRJJJOOEAQOQPEQ 1 REG=I-'GE~0+RGN1 RGN3 RGN5 NRC PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISI'RIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL, NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 17 ROCHESTER GAS AND ROSERT C.MECREOY Vi<e Prerr'dehr Cirrnl Nuclear Prrrductlrrn

~,Joe r I~fI J!ELECTRIC CORPORA77ON

+88'FAST AVENtJF ROCHESTER N.Y.74649.0001 lHEAKlrre NKVD COoCV W 548 2700 February 24, 1992 U.S.Nuclear Regulatory Commission Operations Center

SUBJECT:

Notification of 10 CFR Part.21 Defect R.E.Ginna Nuclear Power Plant Docket No.50-244 In accordance with 10 CFR Part.21, Section 21, (c)(3)(i), the enclosed initial notification is provided vi=.":ac."simile, to the NRC operations center, at (301)492-8187.writ~en'notification, in accordance with 10 CFR Part 21, Section 21 (c)(3)(ii), will he provided hy March 23, 1992.Very truly yours,~e Robert C.ecre y Enclosures 9203180013 920224 PDR ADQGK 05000244 8 PDR TB'd MTBZ6tr ABET d'U'0 WOMB TS:Bl 266'-hZ-833 1

FORM 2 Controlled Copy 54 Refer to A-63.for Xnstructions PNTEN NAME: Robert E.Smith TRANSM TO NRC Oat@, 2/20/92 TITLE: V.P.Production and Engineering ADDRESS: as 6 Electric nue Rochester NY 14649 2.FACXXrTTY'

-.Activity, or basic component supplied.which fails to comply or contains a defect: Field calibration source S/N 109, Model 878-10 4.Firm supplying the basic component which fails to comply or contains a defect!Victoreen Inc.5.Nature of the defect or failure to comply and the safety hazard, which is created or could be created by such a defect or failure to comply: The field calibration source was accepted without meeting the purchase order re uirements.

This created the potential to allow use of the source to calibrate containment radiation monitors.6.Date on which the information of such defect or failure to comply was obtained: December 10 1991 V.Xn the case of a basic component.

which contains a defect.or fails to comply, the number and locations of all such compon-ents in use at, supplied, for, or being supplied, at Ginna Station: NEER: One LpCATXpNS:

Radiochemistry, Hot Lab 28'd Q37826t'TGCT Oi'd'U'0 NMd TS:8T 26ST-LE-833 EB'd lUIOl~C A~6li8 Refer to A-61 for Instructions Corrective Action which has been, is being>or will be taken: Nonconformance Re rt 91-613 Xdentified Deficienc Re r Name of individual or organisation responsible for the action!Health Ph sics De 8.2 Length of time thag has been or wil1 be taken to complete the aotion: Field source will be calibrated and returned in April, 1992.9.Any advice related to the defect or failure to comply about the facili,ty, activity, or basic comyonent that.has been, is.being, or will be given to Rochester Gas and RLecteic: Recalibration of field source is bei completed at this time.Fo ,n e'oJ t (weoinuo confecr 7honv (.a,lee 4,.n, Lhc&~~W 2l~S41-~~+~~r.ZJ~CB'd LSTSZGPTBCT OL'd'9'O 4NMQ 79:A7 P(4 T-JH-P44 I r.r V 4