ML20106C268

From kanterella
Jump to navigation Jump to search
Part 21 Rept Re Design Error When Upgrading Catalytic,Inc post-accident Filter Duct Butterfly Valve Solenoids.Design Spec Called for Wrong Failure Position for Solenoids. Solenoids Replaced
ML20106C268
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/03/1984
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-85-007-000 PT21-85-007-000, PT21-85-7, NUDOCS 8502120203
Download: ML20106C268 (7)


Text

, _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

yj; U

. '}

I ,' ] l ROCHESTER GAS AND El 'TRIC CORPORATION e 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001' 't

... . < ol,",!.~$Yo.2 7oo December 3, 1984 ag- oo 7 c/

Director, Office of Inspection and Enforcement U.S. Nuc1 car Regulatory Commission Washington " .-. zoass SUBJECT 10CFR21 Report v E. 04~ _ m uar Power Plant Docket No. 50-244

Dear Sir:

The enclosed transmittal is to provido notification of a design error made when upgrading the Post Accident Filter Duct Buttorfly Valve Solenoids. The Catalytic, Inc. design specification call for the wrong failure position for these solonoids. Testing of this system detected the error and the colonoids were replaced within ten days. Rotesting verified that the proper solenoids are installed.

At no timo during this evolution was the plant in a modo requiring the Post Accident Filter System to be operable.

V truly yours, Ro er W. Kober k 0 4 8 PDR f

/

t I

'x

,. , C ntrolicd C;py #4

,, . ROfcr to A-61 f;r Instructions FORM 2 CONTENT OF TRANSMITTAL TO NRC Date December 3, 1984

1. NAME: Mr. Roger W. Kober TITLE: Vice President Electric and Steam Production ADDRESS: Rochester Gas & Electric 89 East Avenue Rochester, NY 14649
2. FACILITY: R.E. Ginna Nuclear Power Station DOCKET NO.: 50'-244
3. Activity, or basic component supplied which fails to comply or contains a defect:

12 Class IE Nuclear Solenoid Valvos (ASCO Model No. NP8316E37E)

4. Firm supplying the basic component which falls to comply or contains a defect:

Catalytic, Inc ,

5. Nature of the defect or failure to comply and the safety hazard which is created or could be created by such a defect or failure to comply:

Catalytic, Inc Specification called for "normally open" instond of the required "normally closod" solenoid valvos

6. Date on which the informatign of such dofoct or ' failure to comply was obtained: 4-24-02 /
7. In the case of a basic component which contains a defect or falls to comply, the number and locations of all such components in use at, supplied for, or being supplied at Ginna Station:

NUMDER: 12 LOCATIONS: Containment Rocirculation and Post Accident filter Duet Butterfly Valves L

_ : ; D '.

g. y' ..

j FORM 2 (con't)

L 8. Corrective Action which has been, is being, or will be taken:

Solenoid Valves' replaced with correct type per Field Change Request No. 3260-6 8.1 Name of individual or organization responsible for the action:

Ginna Modification Project Group '

8.2 Length of time that has-been or will be taken to complete the action: Change completed le days after discovery (5-4-82) i e

'- 9. . Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, _

or will be given to Rochester Gan.and Electric:  !

None 3

Mr Notification is not required if individual has actual knowledge -

that the NRC has been adequately informed of. such defect  :

or'such failure to comply.

Initial notification shall be made within two days following-receipt of the information. If initial. notification is by : means ~ other than written communication a written report, shall be submitted within five days af ter the information is obtained.

p Notification shall be made to

.l. Director, Office of Inspection and Enforcement, or to .

2. Director of Regional Office Three copies of each report shall be submitted to'the Director, Office of~ Inspection and Enforcement.

i I

r ,

1

q-

f"t, ,

.g: .Je 1 Contro11cd Copy #4 (4- '

x Rofor to A-61 for Instructions 70ml 2 1

CONFENF '0F TRAMBIIITTAL TO ERC Date s December 3,1984 l'.: NAME: Mr. Roger W. Kober TITLE: 'Vice President Electric and Steam Production

-ADDRESS: Rochester Gas & Electric c 89 East Avenue Rochester, NY 14649 1

-2. .' FACILITY: 'R.E. Ginna~ Nuclear Power Station DOCKET NO.: 59-244

3. L Activity, or basic component supplied Which fails to comply or contains a defect:

12 Class 1E Nuclear' Solenoid Valves (ASCO Model No. NP8316E37E)

  • L4. Firm supplying the basic component Which fails to comply or contains a defect:

5 Catalytic, Inc

5. Nature of. the defect or failure to comply and the safety hazard Which . is ' created or could be created by'such ~a . defect or failure.
to comply

Catalytic, Inc Specification called for "normally open" instead' of the required "normally closed" solenoid valves

-4. Date L on which the information of 'euch defect or failure to comply '

. was obtained:' 4-24-82

7. ;In the case of a basic component Which contains a defect or fails ,

to-comply, the pueber and locations of>all.such components-in-

-use at, supplied for,'or being supplied.at Ginna Station ,

NUMBER: 11 2 f

)

- ~ LOCATIONS' Containment Recirculation and Post Accident filter .

c r

Duet Butterfly Valves s

i*

FORM 2 (con't)

.8. Corrective Action which has been, is being, or will be taken:

Solenoid Valves replaced with correct type per Field Change Request No. 3260-6 8.1 Name of individual or organization responsible for the action:

Ginna Modification Project Group 8.2 Length' of time that has been or will be taken to complete the action: Change completed 10 days after discovery (5-4-82)

9. Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or.will be given to Rochester Gas and Electrics None g: Notification is not required if individual has actual knowledge that ~ the NRC has been adequately informed of such defect or such failure to comply.

Initial notification shall be made within two days following receipt of the information. If initia1' notification is by means other than written communication a written report shall be submitted within five days after the'information is obtained.

Notification shall be made to:

1. Director, Office of Inspection and Enforcement, or to
2. Director of Regional Office Three copies of each report shall be submitted to the Director, Office of Inspection and_ Enforcement.

(

Controlled Copy #4 Rcfor to A-61 for Instructions FORM 2 i.

CONTENT OF TRANSMITTAL TO NRC Date December 3, 1984

1. NAME: Mr. Roger W. Kober TITLE: Vice President Electric and Steam Production

.N

= ADDRESS: ~

Pochester Gas & Electric 69 East Avenue Rochester, NY 14649

2. FACILITY: R.E. Ginna Nuclear Power Station DOCKET NO.: 50-244

-3. ' Activity, orbasic component supplied which fails to comply or contains

a. defects, 12' Class 1E Nuclear Solenoid Valves (ASCO Model No. NP8316E37E)
4. Firm. supplying the basic component which fails to comply or contains a defect:

Catalytic, Inc 1

5., Nature of the defect or failure to comply and the safety hazard

<i which is created or could be created . by such a - defect or failure

'I to comply:

y Catalytic, Inc ~ Specification called for "normally open" instead of the required "normally closed" solenoid valves 5

6. Date on which the'information of such' defect or failure to comply was obtained: 4-24-82 70 In the case of a. basic component which contains a defect or fails to'acomply,-the number and locations of all such components in tise at, supplied for;. or being supplied at Ginna Station:

NUMBER: 12 LOCATIONS: Containt7ent Recirculation P.nd Post Accident filter h-

.g Duct Butterfly Vcives

I j ..

FORM 2 (con't)

8. Corrective Action which has been, is being, or will be taken:

Solenoid Valves replaced with correct type per Field Change Request No. 3260-6 8.1 Name of individual or organization responsible for the action:

Ginna Modification Project Group 8.2 Length of time that has been or will be taken to complete the action: Change completed 10 days after discovery (5-4-82)

9. Any adv' ice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to Rochester Gas and Electric:

None NOTE: Notification is not required if individual has actual knowledge that the NRC has been adequately informed of such defect or such' failure to comply.

Initial notification shall be made within two days following receipt of the information. If initial notification is by means other than written communication a written report shall be submitted within five days after the information is obtained.

Notification shall be made to:

1. Director, Office of Inspection and Enforcement, or to
2. Director of Regional Office Three copies of each report shall be submitted to the Director, Office of Inspection and Enforcement.