Part 21 Rept Re Failure of Diesel Min Operating Fuel Oil Pressure Pump Mfg by Tuthill Corp.Safety Hazard May Be Created If Emergency DG B Not Able to Maintain Design Load Rating.Pump End Play Clearance Adjusted
ML20095K036
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/28/1995
From: Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC
References
REF-PT21-95 NUDOCS 9512280065
Download: ML20095K036 (3)


Text

k' ~

AUG-38-1995 14:53 RG&E NUCLEAR ASSUR..GINNA 315 524 4446 325 P.01 I

. .,,g ,

a b ,

@ 7/6 - 77/- 36Yl ROCHES TER OA S ANO GLEC TRIC CORPORA TION . 89 EA STA VENUG. ROCHESTER, N. Y. 14G49-000 t

[ .'

j JC$E004 A t// CAY N LE M 'O'.C MWs 0Arlp'Oy4f Gevu Nrp;Wy fyggs ASI.A CGOL ItG $46M%

August 28,1995 U.S' . Nuclear Regulatory Commission Operations Center Facsimile Number 301-816-5151 Telephone Number 301-816-5100

Subject:

Initial Notification of 10 CFR Part 21 Defect R.E. Ginna Nuclear Power Plant Docket No. 50-244 In accordance with 10 CFR Pan 21, Reporting of Defects and Noncompliance, Section 21 (c)

(3) (i), which requires " Initial notification by facsimile", the enclosed initial notification is provided. Written notification, in accordance with 10 CFR Part 21, Section 21 (c) (3) (ii), will be provided by September 25,1995.

Very truly yours, 1

0.0' oseph A. Widay Enclosure .

i h Wdb N ,

l l

i 9

9512280065 950828 PDR ADOCK 05000244 ( I S PDR lfp

y M ~um . m . -, . x w- wa- ~=e...- 2.: :=- ~= x ;. ~=

PAGE 2 10CFR21 INITIAL FACSIMILE NOTIFICATION l l

I. NAME AND ADDRESS OF THE INDIVIDUAL INFORMING THE I COMMISSION:

NAME: Joseph A. Widay l Plant Manager l ADDRESS: Rochester Gas & Electric Co.poration 89 East Avenue Rochester, New York 14649 II. IDENTIFICATJON OF THE FACILITY, THE ACTIVITY, OR THE BASIC COMPONENT SUPPLIED FOR SUCH FACILITY WHICH FAILS TO COMPLY OR CONTAINS A DEFECT:

The facility is the R. E. Ginna Nuclear Power Plant. The basic component is the Internal gear positive displacement pump used as the fuel oil booster pump on the l "B" Emergency Diesel Generator (D/G) (The pump is a Tuthill Model 2CF-CC and the Ginna equipment identification number (EIN) is PDG05B.) 1 IIL IDENTIFICATION OF THE FIRM CONSTRUCTING THE FACILITY OR I SUPPLYING THE BASIC COMPONENT WHICH FAILS TO COMPLY OR CONTAINS A DEFECT:

The pump was manufactured by:

1 Tuthill Corporation j Tuthill Pump Division 1 12500 South Pulaski Road Chicago, Illinois 60658 Note: This pump was purchased commercial-grade, was commercially-dedicated by Rochester Gas & Electric, and met all technical requirements included in the procurement document. I IV. NATURE OF THE DEFECT OR FAILURE TO COMPLY AND THE SAFETY HAZARD WHICH IS CREATED OR COULD BE CREATED BY SUCH DEFECT OR FAILURE TO COMPLY:

1 The pump was supplied as an exact replacement (by model number) for the original, component and was satisfactorily tested to meet the pump performance requirements established by the pump original equipment manufacturer (OEM). ,

The replacement pump was installed during a scheduled maintenance outage of the I "B" Emergency D/G in August,1995. During post-installation testing, the diesel minimum operating fuel oil pressure (as recommended by the diesel OEM) could not be achieved. The safety hazard that could have been created was that the "B" Ernergency D/G may not have been able to maintain design load rating (with the fuel oil booster pump capacity reduced).

J c. 2? %5 '7 ! ". FM FC:

,y ..w a os .

ia. n u av, m aio2 e uu n nou 6oo4

,AUG-28-1995 14:54 RGEE M. CLEAR ASSUR. .GINNA 315 c324 4446 325 P.03 PAGE 3 v v V. THE DATE ON WHICH THE INFORMATION OF SUCH DEFECT OR i-FAILURE TO COMPLY WAS OBTAINED:

The information was obtained on August 3,1995.

j VI. IN THE CASE OF A BASIC COMPONENT WHICH CONTAINS A DEFECT OR FAILS TO COMPLY, THE NUMBER AND LOCATION OF ALL SUCH COMPONENTS IN USE AT, SUPPLIED FOR, OR BEING SUPPLIED FOR i

GINNA STATION:

There are two fuel oil booster pumps installed, one on the "A" and one on the "B" Emergency D/O. (This defect only affected the "B" Emergency D/G.)

There were two pumps procured as replacement spares for the installed fuel oil i booster pumps, and both of these spares appear to have this defect.

VII. THE CORRECTIVE ACTION WHICH HAS BEEN, IS BEING, OR WILL BE

)

~

TAKEN; THE NAME OF THE INDIVIDUAL OR ORGANIZATION RESPONSIBLE FOR THE ACTION; AND THE LENGTH OF TIME THAT 4

HAS BEEN OR WILL BE TAKEN TO COMPLETE THE ACTION:

?

Corrective action for the fuel oil booster pump installed on the "B" Emergency D/G is complete. The corrective action was to adjust the pump end play l

clearance to tighter tolerances by changing shims on the pump cover to achieve l the fuel oil system pressure recommended by the diesel OEM. Additional actions to ensure spare pumps meet these recommendations are being evaluated.

VIII. ANY ADVICE RELATED TO THE DEFECT OR FAILURE TO COMPLY i

ABOUT THE FACILITY, ACTIVITY, OR BASIC COMPONENT THAT HAS l BEEN, IS BEING, OR WILL BE GIVEN TO PURCHASERS OR LICENSEES:

' Subsequent to the installation of a new fuel oil booster pump, if fbel oil system pressure (as recommended by the diesel OEM) is not achieved, adjustment of pump end play clearance may be necessary to increase pump capacity.