IR 05000482/2017407
From kanterella
Revision as of 08:53, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17356A191 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 12/22/2017 |
From: | Jeremy Groom Plant Support Branch-1 |
To: | Heflin A Wolf Creek |
References | |
EA-17-149 IR 2017407 | |
Download: ML17356A191 (6) | |
Similar Documents at Wolf Creek | |
---|---|
Category:Letter
MONTHYEARML24199A1712024-09-17017 September 2024
[Table view]Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24184C1852024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24036A0092024-02-14014 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0075 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24036A1852024-02-0505 February 2024 Correction to 2022 Annual Radioactive Effluent Release Report - Report 46 ML24032A1742024-02-0202 February 2024 Withdrawal of Requested Licensing Action Exemption from Specific Provisions in 10 CFR 73.55 ML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information 2024-09-06 Category:Meeting Briefing Package/Handouts MONTHYEARML24180A0092024-06-28028 June 2024
[Table view]July 23, 2024, Portable Lighting Amendment 237 Meeting Slides ML24071A2102024-03-25025 March 2024 March 25, 2024, Portable Lighting Revised SE Meeting Slides ML24085A2732024-03-21021 March 2024 Comments for March 25, 2024 Meeting on Portable Lighting Revised SE ML23275A1712023-10-16016 October 2023 October 16, 2023, Licensee Pre-submittal Meeting Slides - License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2 for Wolf Creek Generating Station ML21333A1512021-11-29029 November 2021 Pre-Submittal Meeting Slides License Amendment Request Addressing Portable Lighting for Operator Manual Actions ML21179A0892021-07-13013 July 2021 Background Information July 13, 2021, Pre-Submittal Public Teleconference ML20308A7332020-11-18018 November 2020 Slides for GSI-191 Pre-Submittal Public Teleconference November 18, 2020 ML18299A0492018-10-30030 October 2018 Accident Analyses Methodology Transition LAR Public Meeting IR 05000482/20174072017-12-22022 December 2017 Summary of Closed Regulatory Conference to Discuss Wolf Creek, Unit 1, Security Inspection Report 05000482/2017407 ML16271A4822016-09-27027 September 2016 Summary of Regulatory Conference to Discuss Safety Significance of Wolf Creek Generating Station Emergency Generator Excitation Diode Apparent Violation ML16236A0952016-08-25025 August 2016 and Wolf Creek Generating Station - August 25, 2016, Class 1E Electrical Equipment Air Conditioning System Pre-Application Meeting ML16095A0782016-04-12012 April 2016 Slides for the WCGS Meeting Discussion 4/12/16 ML16095A0852016-04-12012 April 2016 Large Scale Head Loss Test Specification 4/12/16 ML16095A0802016-04-12012 April 2016 Large Scale Penetration Test Specification 4/12/16 ML16095A0922016-03-31031 March 2016 Large Scale Penetration and Head Loss Test Plan 4/12/16 ML14188C4812014-07-0707 July 2014 Summary of Annual Assessment Meeting with Wolf Creek Generating Station ML14134A1842014-05-14014 May 2014 Summary of Public Meeting to Discuss an Apparent Violation Identified at Wolf Creek Generating Station ML14038A3852014-02-0606 February 2014 1/22/2014 - Summary of Public Meeting to Discuss Corrective Actions Implemented to Address the Chilling Effect Letter ML13218A0212013-08-0707 August 2013 Licensee Slides, 08/07/13 Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Long-Term Corrective Actions for Water Hammer Events in the Essential Service Water System at Wolf Creek ML13205A2142013-07-30030 July 2013 Operating Corporation - Slides for Pre-application Meeting on 7/30/13 - Core Design and Safety Analysis Methodology Transition License Amendment Request for Wolf Creek Generating Station ML12263A3622012-09-20020 September 2012 Pre-application Meeting Slide Core Design and Safety Analysis Methodology Transition License Amendment Request TAC No. ME9495) ML12191A1742012-07-0909 July 2012 6/25/2012 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation ML1110104292011-04-11011 April 2011 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Wolf Creek Generating Station Performance for the NRC Inspection Period Ending December 31, 2010 ML1016204902010-06-16016 June 2010 Notice of Construction Reactor Oversight Process Category 2 Public Meeting Handout: Wolf Creek 2, Notice of Violation and Proposed Imposition of Civil Penalty, Dated 11/21/1984 ML1016901162010-06-16016 June 2010 6/16/2010 Construction Reactor Oversight Process Category 2 Public Meeting Handout: Meeting Slides (Enforcement Cases) ML1013404892010-05-14014 May 2010 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Wolf Creek Generating Station Performance for the NRC Inspection Period from January 1 Through December 31, 2009 ML0933702032009-12-0303 December 2009 Summary of Public Meeting for Wolf Creek Generating Station ML0933801482009-11-20020 November 2009 Licensee Handouts from November 20, 2009, Public Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss GL 2004-02 Response Rai'S ML0913300232009-05-13013 May 2009 Meeting Slides, Successful Licensing of the Als Fpga Based Safety Related I&C Platform ML0912600692009-05-0606 May 2009 Lessons Learned Using Digital I&C Interim Staff Guidance Workshop ML0902102422009-01-15015 January 2009 Licensee Slides, January 15, 2009, Category 1 Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Changes to Post Fire Shutdown Unresolved Items Analysis Methods Pre-Application for Wolf Creek Generating Station ML0834700222008-12-11011 December 2008 Slides, Category 2 Public Meeting Digital Instrumentation and Control Steering Committee M080717, M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection2008-07-17017 July 2008 M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection ML0817706682008-06-25025 June 2008 Summary of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Several Initiatives That Were Being Implemented to Improve Plant Performance at Wolf Creek ML0803706102008-01-11011 January 2008 Westinghouse Electric Company LLC, LTR-CDME-08-2, Rev. 1 NP-Attachment, Meeting Handouts from the December 13, 2007 Meeting with Wolf Creek and NRR on H*/B*. ML0729204682007-10-29029 October 2007 09/25/2007, Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Strategic Teaming and Resource Sharing Representatives to Discuss License Renewal Activities ML0721501532007-08-0202 August 2007 NRC Staff Handout for August 2, 2007, Meeting with Wolf Creek Nuclear Operating Corporation ML0721102382007-07-24024 July 2007 Performanc Contracting, Inc.'S Powerpoint Slide, Proposed Wolf Creek/Callaway Test Configuration ML0719303772007-07-11011 July 2007 Handouts (NRC and Licensee) for Meeting with Representatives of Wolf Creek Nuclear Operating Corporation ML0718606902007-06-19019 June 2007 06/19-20/2007 Slides,Fabrication Records Review, from Category 2 Public Meeting Between the NRC Staff and the Expert Panel for the Wolf Creek Advanced Finite Element Analyses (Fea) ML0716203882007-06-0101 June 2007 06/01/07 - Presentation Material, Advanced Fea Crack Growth Calculations for Evaluation of PWR Pressurizer Nozzle Dissimilar Metal Weld Circumferential Pwscc. ML0733409182007-05-31031 May 2007 05/31/2007 Presentation by J. Cudsworth NRC Treatment of Issues Other than Category 2 Issues for License Renewal ML0713703642007-05-17017 May 2007 Handout for Meeting with Wolf Creek Nuclear Operating Corporation on the Licensee'S Application for the Main Steam and Feedwater Isolation System (Msfis) Modification ML0713506532007-05-0808 May 2007 Slides, Recommendations for Critical Flaw Size Calculations (in Wolf Creek Advanced Fea Project). ML0713506462007-05-0808 May 2007 Industry Slides, Advanced Fea Crack Growth Calculations for Evaluation of PWR Pressurizer Nozzle Dissimilar Metal Weld Circumferential PWSCC, from Status Meeting on Implications of Wolf Creek Dissimilar Metal Weld Inspections ML0713506512007-05-0808 May 2007 Slides, Category 2 Public Meeting with NEI on the Implications of the Wolf Creek Dissimilar Metal Weld Inspections. ML0713603732007-05-0101 May 2007 Enclosure-1 05/01/2007 Dominion Engineering Presentation Advanced Fea Crack Growth Calculations for Evaluation of PWR Pressurizer Nozzle Dissimilar Metal Weld Circumferential Pwscc. ML0713603962007-05-0101 May 2007 Enclosure 2-05/01/2007 Engineering Mechanics Corporation of Columbus Presentation, NRC Welding Residual Stress Solutions as Generated by Battelle and Emc2. ML0701704732007-01-19019 January 2007 12/19/2006 Summary of Public Meetings Related to the Review of the Wolf Creek Generating Station License Renewal Application ML0635603632006-12-20020 December 2006 12/01/2006 Industry Meeting Handout: Draft Report (December 2006) - Implications of Wolf Creek Pressurizer Butt Weld Indications Relative to Safety Assessment and Inspection Requirements 2024-06-28 Category:Slides and Viewgraphs MONTHYEARML24180A0092024-06-28028 June 2024
[Table view]July 23, 2024, Portable Lighting Amendment 237 Meeting Slides ML24071A2102024-03-25025 March 2024 March 25, 2024, Portable Lighting Revised SE Meeting Slides ML23275A1712023-10-16016 October 2023 October 16, 2023, Licensee Pre-submittal Meeting Slides - License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2 for Wolf Creek Generating Station ML21333A1512021-11-29029 November 2021 Pre-Submittal Meeting Slides License Amendment Request Addressing Portable Lighting for Operator Manual Actions ML20310A2232020-11-19019 November 2020 Slides for ERO Staffing pre-submittal Public Teleconference November 19, 2020 (L-2020-LRM-0104) IR 05000482/20174072017-12-22022 December 2017 Summary of Closed Regulatory Conference to Discuss Wolf Creek, Unit 1, Security Inspection Report 05000482/2017407 ML16236A0952016-08-25025 August 2016 and Wolf Creek Generating Station - August 25, 2016, Class 1E Electrical Equipment Air Conditioning System Pre-Application Meeting ML16236A0972016-08-25025 August 2016 Operating Corporation - August 25, 2016, Core Design and Safety System Analysis Methodology Transition License Amendment Request Revised ML16095A0782016-04-12012 April 2016 Slides for the WCGS Meeting Discussion 4/12/16 ML14188C4812014-07-0707 July 2014 Summary of Annual Assessment Meeting with Wolf Creek Generating Station ML14134A1842014-05-14014 May 2014 Summary of Public Meeting to Discuss an Apparent Violation Identified at Wolf Creek Generating Station ML14038A3852014-02-0606 February 2014 1/22/2014 - Summary of Public Meeting to Discuss Corrective Actions Implemented to Address the Chilling Effect Letter ML13218A0212013-08-0707 August 2013 Licensee Slides, 08/07/13 Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Long-Term Corrective Actions for Water Hammer Events in the Essential Service Water System at Wolf Creek ML13219A1932013-08-0707 August 2013 Licensee Slides (Final), 08/07/13 Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Long-Term Corrective Actions for Water Hammer Events in the Essential Service Water System at Wolf Creek ML13205A2142013-07-30030 July 2013 Operating Corporation - Slides for Pre-application Meeting on 7/30/13 - Core Design and Safety Analysis Methodology Transition License Amendment Request for Wolf Creek Generating Station ML13121A4892013-05-0101 May 2013 End of Cycle Meeting Summary 4-18-13 ML12263A3622012-09-20020 September 2012 Pre-application Meeting Slide Core Design and Safety Analysis Methodology Transition License Amendment Request TAC No. ME9495) ML12191A1742012-07-0909 July 2012 6/25/2012 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation ML1110104292011-04-11011 April 2011 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Wolf Creek Generating Station Performance for the NRC Inspection Period Ending December 31, 2010 ML1016901162010-06-16016 June 2010 6/16/2010 Construction Reactor Oversight Process Category 2 Public Meeting Handout: Meeting Slides (Enforcement Cases) ML1013404892010-05-14014 May 2010 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Wolf Creek Generating Station Performance for the NRC Inspection Period from January 1 Through December 31, 2009 ML0933702032009-12-0303 December 2009 Summary of Public Meeting for Wolf Creek Generating Station ML0933801482009-11-20020 November 2009 Licensee Handouts from November 20, 2009, Public Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss GL 2004-02 Response Rai'S ML0913300232009-05-13013 May 2009 Meeting Slides, Successful Licensing of the Als Fpga Based Safety Related I&C Platform ML0912600762009-05-0606 May 2009 Lessons Learned Using Digital I&C Interim Staff Guidance Workshop Application of ISG-4 During Wolf Creek and Oconee Reviews ML0912600692009-05-0606 May 2009 Lessons Learned Using Digital I&C Interim Staff Guidance Workshop ML0902102422009-01-15015 January 2009 Licensee Slides, January 15, 2009, Category 1 Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Changes to Post Fire Shutdown Unresolved Items Analysis Methods Pre-Application for Wolf Creek Generating Station ML0834700222008-12-11011 December 2008 Slides, Category 2 Public Meeting Digital Instrumentation and Control Steering Committee M080717, M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection2008-07-17017 July 2008 M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection ML0817706682008-06-25025 June 2008 Summary of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Several Initiatives That Were Being Implemented to Improve Plant Performance at Wolf Creek ML0813606472008-06-10010 June 2008 05/01/2008-Summary of Public Meeting on Safety Evaluation Report with Open Items Regarding the Wolf Creek Generating Station License Renewal Review ML0721102382007-07-24024 July 2007 Performanc Contracting, Inc.'S Powerpoint Slide, Proposed Wolf Creek/Callaway Test Configuration ML0720601382007-07-17017 July 2007 Slides from Meeting Between NRC Staff and Wolf Creek Panel Enclosures 2 to 3, Advanced Fea Crack Growth Calculations for Evaluation of PWR Pressurizer Nozzle Dissimilar Metal Weld Circumferential Pwscc. ML0719303772007-07-11011 July 2007 Handouts (NRC and Licensee) for Meeting with Representatives of Wolf Creek Nuclear Operating Corporation ML0718606902007-06-19019 June 2007 06/19-20/2007 Slides,Fabrication Records Review, from Category 2 Public Meeting Between the NRC Staff and the Expert Panel for the Wolf Creek Advanced Finite Element Analyses (Fea) ML0716203882007-06-0101 June 2007 06/01/07 - Presentation Material, Advanced Fea Crack Growth Calculations for Evaluation of PWR Pressurizer Nozzle Dissimilar Metal Weld Circumferential Pwscc. ML0733409182007-05-31031 May 2007 05/31/2007 Presentation by J. Cudsworth NRC Treatment of Issues Other than Category 2 Issues for License Renewal ML0713703642007-05-17017 May 2007 Handout for Meeting with Wolf Creek Nuclear Operating Corporation on the Licensee'S Application for the Main Steam and Feedwater Isolation System (Msfis) Modification ML0713506532007-05-0808 May 2007 Slides, Recommendations for Critical Flaw Size Calculations (in Wolf Creek Advanced Fea Project). ML0713506512007-05-0808 May 2007 Slides, Category 2 Public Meeting with NEI on the Implications of the Wolf Creek Dissimilar Metal Weld Inspections. ML0713603962007-05-0101 May 2007 Enclosure 2-05/01/2007 Engineering Mechanics Corporation of Columbus Presentation, NRC Welding Residual Stress Solutions as Generated by Battelle and Emc2. ML0713603732007-05-0101 May 2007 Enclosure-1 05/01/2007 Dominion Engineering Presentation Advanced Fea Crack Growth Calculations for Evaluation of PWR Pressurizer Nozzle Dissimilar Metal Weld Circumferential Pwscc. ML0701601892006-12-19019 December 2006 12/19/2006, Viewgraphs from Meeting with Wolf Creek Generating Station to Discuss License Renewal Process and Environmental Scoping ML0635603462006-11-30030 November 2006 November 30, 2006 NRC Presentation Slides: Wolf Creek Flaw Evaluation ML0635603582006-11-30030 November 2006 Industry Presentation Slides: MRP-139 Analysis Basis ML0632100772006-11-16016 November 2006 NRC Presentation: NRC Perspective on Wolf Creek Inspection Results ML0632100802006-11-16016 November 2006 Industry Presentations: Nov. 16, 2006 Public Meeting ML0622804372006-08-16016 August 2006 Handouts from Wolf Creek Nuclear Operating Corporation and from Union Electric Company for Meeting with NRC on the Main Steam Isolation Valve (MSIV) Operability Determination ML0618000292006-06-28028 June 2006 Handout for June 28, 2006, Meeting with Representatives of Wolf Creek Nuclear Operating Corporation for Wolf Creek Generating Station on the Main Steam and Feedwater Isolation System (Msfis) Controls Replacement Project ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 2024-06-28 |
Inspection Report - Wolf Creek - 2017407 (Security) | |
---|---|