ML18092A821
ML18092A821 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 09/17/1985 |
From: | TREJO J Public Service Enterprise Group |
To: | RADOW E TRENTON, NJ |
Shared Package | |
ML18092A822 | List: |
References | |
NUDOCS 8510080086 | |
Download: ML18092A821 (3) | |
Similar Documents at Salem | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M2101999-10-19019 October 1999
[Table view]Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML18107A5601999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML18107A5421999-09-22022 September 1999 Forwards Discharge Monitoring Rept for Salem Generating Station for Aug 1999.Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML18107A5321999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources. ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments ML18107A5331999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML18107A5231999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 ML18107A4981999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5181999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves ML18107A4921999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4861999-08-19019 August 1999 Forwards NPDES Discharge Monitoring Rept, for Salem Generating Station for Month of Jul 1999.Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4831999-08-18018 August 1999 Submits Licensee Comments on NRC 990730 Ltr Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML18107A4531999-07-20020 July 1999 Forwards Discharge Monitoring Rept for Salem Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection ML18107A4431999-07-0606 July 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S98-17 Re Permissible Enrichment Values for New Fuel Storage & Has No Comments ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 ML18107A4181999-06-30030 June 1999 Submits Response to NRC Request for Info Re Y2K Readiness at Npps,Per GL 98-01,suppl 1.Disclosure Encl ML20209B6751999-06-29029 June 1999 Ack Receipt of from Dr Powell in Response to NRC Re Fitness for Duty.Attachment 2 of Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML18107A4091999-06-22022 June 1999 Forwards Discharge Monitoring Rept for May 1999,containing Info as Required by Permit NJ0005622.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4061999-06-21021 June 1999 Provides Supplemental Info to Proposed License Amend, Modifying TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Info Re Acceptance Criterion Discussed ML18107A3691999-06-11011 June 1999 Forwards Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1.Original Submittal Contained Typo for year-to-date Value for Numbers of Hours Generator Was on Line (Service Hours) ML18107A3641999-06-0404 June 1999 Requests Enforcement Discretion for TS 3/4.6.2.3 Re Containment Cooling Sys for Salem Generating Station,Unit 1 ML18107A3561999-06-0303 June 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S99-05 & Has No Comments ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A3301999-05-24024 May 1999 Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves ML18107A3371999-05-21021 May 1999 Forwards NPDES Discharge Monitoring for Salem Generating Station for Apr 1999, Containing Info as Required by Permit NJ0005622 ML18107A3291999-05-20020 May 1999 Forwards Redacted Response to NRC 990322 RAI Re Notification of Licensed Operator That Tested Positive for Alcohol. Attachment 2 Withheld,Per 10CFR2.790(a)(6) ML18107A3031999-05-18018 May 1999 Provides Summary of Changes to NRC Commitments That Have Been Made But Not Reported by Other Means,Iaw with NEI Process for Managing NRC Commitments ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness ML18107A2951999-05-12012 May 1999 Submits SG Tube Plugging Rept,Per Plant TS 4.4.6.5.a.Total of 47 Tubes Were Plugged During SG Tube Insps,Which Were Completed During Plant Tenth RFO ML18107A2861999-05-11011 May 1999 Forwards Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. COLR Rept Was Received by Util as Part of Reload SE ML18107A2481999-04-29029 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Salem & Hope Creek Generating Stations. Rept Summarizes Results of Radiological Environ Surveillance Program for 1998 ML18107A2511999-04-27027 April 1999 Submits 30-day Fuel Clad Temp Rept for Salem Generating Station,Units 1 & 2.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Plant Large & Small LOCA & Small Break LOCA Analyses ML18107A2631999-04-26026 April 1999 Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements ML18107A2371999-04-26026 April 1999 Forwards Corrected Response to NRC RAI Re Licensee Request for Change to TS Permissible Enrichment Values for New Fuel Storage.Incorrect Attachment Was Provided with Util 990412 Ltr to Nrc.Encl Supersedes 990412 Submittal 1999-09-08 Category:EXTERNAL CORRESPONDENCE MONTHYEARML18107A5421999-09-22022 September 1999
[Table view]Forwards Discharge Monitoring Rept for Salem Generating Station for Aug 1999.Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4861999-08-19019 August 1999 Forwards NPDES Discharge Monitoring Rept, for Salem Generating Station for Month of Jul 1999.Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4531999-07-20020 July 1999 Forwards Discharge Monitoring Rept for Salem Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection ML18107A4091999-06-22022 June 1999 Forwards Discharge Monitoring Rept for May 1999,containing Info as Required by Permit NJ0005622.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A3371999-05-21021 May 1999 Forwards NPDES Discharge Monitoring for Salem Generating Station for Apr 1999, Containing Info as Required by Permit NJ0005622 ML18107A2251999-04-23023 April 1999 Forwards Discharge Monitoring Rept for Salem Generating Station for Month of Mar 1999.Rept Is Required & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18106B1111999-03-24024 March 1999 Forwards NPDES Discharge Monitoring Rept, for Salem Generating Station for Feb 1999.Rept Required by & Prepared Specifically for EPA & Nj Dept of Environmental Protection ML18106B0831999-02-23023 February 1999 Forwards Discharge Monitoring Rept for Salem Generating Station, as Required in Permit NJ0005622 for Jan 1999. Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18106B0291999-01-21021 January 1999 Forwards Discharge Monitoring Rept for Salem Generating Station Containing Info as Required in Permit NJ0005622 for Month of Dec 1998.Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18106A9861998-12-16016 December 1998 Forwards Discharge Monitoring Rept for Sgs, Containing Info as Required in Permit NJ0005622 for Month of Nov 1998 ML18106A9691998-11-19019 November 1998 Forwards Discharge Monitoring Rept for Salem Generating Station Containing Info as Required in Permit NJ0005622 for Month of Oct 1998.Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18106A9471998-10-22022 October 1998 Forwards Suppl Rept on Corrective Measures to Be Taken to Reduce Potential of Future Occurrences,Per Discharge Confirmation Rept Submitted on 980709.Attached Pages to Be Inserted Into 980709 Rept & Previous Page Discarded ML18106A9381998-10-22022 October 1998 Forwards Discharge Monitoring Rept for Salem Generating Station for Permit Number NJ0005622 for Month of Sept 1998. Rept Was Prepared Specifically for EPA & Nj Dept of Environ Protection ML18106A8211998-08-18018 August 1998 Forwards Discharge Monitoring Rept for Salem Generating Station for July 1998,per Requirements of Permit NJ0005622. Rept Required & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18106A7871998-07-23023 July 1998 Forwards Discharge Monitoring Rept for Sgs, for June 1998. Rept Is Prepared Specifically for EPA & Nj Dept of Environ. Observed Results of Measurements & Analyses Required to Be Performed by Listed Agencies,Presented ML18106A6741998-06-17017 June 1998 Forwards Discharge Monitoring Rept for Sgs, for May 1998. Rept Is Prepared Specifically for EPA & Nj Dept of Environ Protection.Observed Results of Measurements & Analyses Required to Be Performed by Noted Agencies,Presented ML18106A6191998-05-20020 May 1998 Forwards Discharge Monitoring Rept for Salem Generating Station for Apr 1998. Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18106A5631998-04-20020 April 1998 Forwards Discharge Monitoring Rept for Salem Generating Station for Mar 1998,per Requirements of Permit NJ0005622. Rept Required & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18106A4461998-04-0303 April 1998 Submits Annual Rept,Summarizing Occurrences of Federally Listed Threatened & Endangered Animal Species at Plant Circulating Water Intake Structure During 1997 ML18106A4081998-03-23023 March 1998 Forwards NPDES Discharge Monitoring Rept for Salem Generating Station, for Feb 1998,per Requirements of Permit NJ0005622.Rept Required & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18106A3441998-02-24024 February 1998 Forwards NPDES Discharge Monitoring Rept for Salem Generating Station, as Required in Permit NJ0005622 for Month of Jan 1998.Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18106A2751998-01-20020 January 1998 Forwards Discharge Monitoring Repts for Salem Generating Station for Dec 1997,per Requirements of Permit NJ0005622. Rept Required & Prepared Specifically for EPA & Nj Dept of Environ Protections ML18106A2271997-12-17017 December 1997 Forwards New Jersey NPDES Discharge Monitoring Rept for Salem Generating Station for Month of Nov 1997. Rept Is Required by & Prepared Specifically for EPA & New Jersey Dept of Environ Protection ML18106A1731997-11-18018 November 1997 Forwards New Jersey NPDES Discharge Monitoring Repts, for Oct 1997 for Plant.Observed Results of Measurements & Analysis Required to Be Performed ML18102B6221997-10-0606 October 1997 Forwards New Jersey NPDES Discharge Monitoring Repts for Salem Generating Station for Sept 1997. Rept Is Required by & Prepared Specifically for EPA & New Jersey Dept of Environ Protection ML18102B5221997-08-18018 August 1997 Forwards Discharge Monitoring Rept for Salem Nuclear Generating Station for July 1997 & Results of Tracer Dye Studies Conducted to Determine Pump Flow Rates for Circulating Water Sys as Required by Part IV-B/C ML18102B4021997-06-19019 June 1997 Forwards NPDES Discharge Monitoring Rept for May 1997. Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18102B3411997-05-23023 May 1997 Forwards Corrected Pages of Discharge Monitoring Rept for Nov 1996 for Salem Generating Station. Incorrect Entries Were Made Into Monthly Average & Daily Max Values for Total Residual Chlorine.W/Revised Repts for Dec 1996 & Jan 1997 ML18102B3571997-05-23023 May 1997 Forwards Corrected Pages of Discharge Monitoring Rept for Jan 1997 for Salem Generating Station. Incorrect Entries Were Made Into Monthly Average & Daily Max Values for Total Residual Chlorine ML18102B3591997-05-23023 May 1997 Forwards Corrected Pages of Discharge Monitoring Rept for Feb 1997 for Salem Generating Station. Incorrect Entries Were Made Into Monthly Average & Daily Max Values for Total Residual Chlorine ML18102B3551997-05-23023 May 1997 Forwards Corrected Pages of Discharge Monitoring Rept for Dec 1996 for Salem Generating Station. Incorrect Entries Were Made Into Monthly Average & Daily Max Values for Residual Chlorine ML18102A7961997-01-28028 January 1997 Submits 1996 Annual Rept Summarizing Occurrences of Federally Listed Threatened & Endangered Animal Species at Salem Generating Stations Circulating Water Intake Structure During 1996 ML18102A8111997-01-20020 January 1997 Forwards Corrected Discharge Monitoring Rept for Dec 1996 for Salem Generating Station. ML18102A6241996-11-21021 November 1996 Forwards NPDES Discharge Monitoring Rept for Oct 1996 for Salem Generating Station. Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18102A3671996-08-21021 August 1996 Forwards Corrected Page for Discharge 489C in June 1996 ML18102A3331996-08-21021 August 1996 Forwards Corrected Entries of Effluent Gross Value Flow of NPDES Discharge Monitoring Rept for April 1996 ML18102A3321996-08-21021 August 1996 Forwards Correct Entries of Effluent Gross Value for Flow of NPDES Discharge Monitoring Rept for May 1996 ML18102A1451996-05-30030 May 1996 Requests Continued Relief from Daily Trash Rack Cleaning Until Startup of Unit 2,due to Be on Line Sept 1996 ML18101B3071996-03-28028 March 1996 Submits Supplemental Rept on Corrective Measures Taken to Reduce Potential of Future Occurrences ML18101A7901995-06-20020 June 1995 Forwards NPDES Discharge Monitoring Repts for Salem Generating Station for Month of May 1995 ML18101A7871995-06-16016 June 1995 Forwards Corrected Page for Discharge 485 in Apr 1995 Discharge Monitoring Rept for Salem Generating Station, Reflecting Effluent Gross Value for Acute Toxicity Testing (LC-50) ML18101A7601995-05-30030 May 1995 Forwards Revised NPDES Discharge Monitoring Repts for Salem Generating Station for Sept 1994 ML18101A7681995-05-30030 May 1995 Forwards Table of Results of Tracer Dye Studies Conducted to Determine Pump Flow Rates for Circulating Water Sys ML18101A7271995-05-0909 May 1995 Forwards Corrected Discharge Monitoring Rept for Feb 1995 for Salem Generating Station,Correcting Effluent Net Values for Temp for Both Discharges ML18101A4661995-01-0909 January 1995 Submits Annual Review of Incidental Takes Re Federally Listed Threatened & Endangered Species,Including Fish & Sea Turtles ML18100A8281994-01-13013 January 1994 Summarizes Occurrences of Federally Listed Threatened & Endangered Species at Salem CWS Intake During 1993 ML18100A7921993-12-23023 December 1993 Forwards Comments Addressing Conservation Recommendations in Natl Marine Fisheries Svc 910102 Biological Opinion ML18100A7441993-11-23023 November 1993 Forwards NPDES Discharge Monitoring Rept for Oct 1993. Rept Required by EPA & Nj Dept of Environ Protection & Energy ML18100A7151993-11-17017 November 1993 Forwards Corrected Page 17 of 17 for Sept 1993 Discharge Monitoring Rept ML18100A3671993-04-30030 April 1993 Forwards Listed Sealed Drawings for Salem Generating Station Oil Water Separator Project Treatment Works Approval,(Twa) Twa Application 93-7504-4,per Recipient 930412 Ltr.W/O Encls 1999-09-22 Category:EXTERNAL LETTERS ROUTED TO NRC MONTHYEARML18094B4381990-04-25025 April 1990
[Table view]Advises That Listed Personnel Authorized to Sign NPDES Related Correspondence & Repts ML18094B3241990-02-22022 February 1990 Forwards NPDES Discharge Monitoring Rept for Jan 1990 ML18094B3291990-02-14014 February 1990 Forwards Printouts Containing RW-859 Nuclear Fuel Data for Period Ending 891231 & Diskettes ML18094B2641990-01-23023 January 1990 Forwards Discharge Monitoring Rept for Dec 1989. No Violations of Permit Occurred During Rept Period ML18094B2251989-12-21021 December 1989 Forwards Discharge Monitoring Rept for Nov 1989.Rept Not Intended as Assertion That Any Instrument Has Measured or Any Reading or Analytical Result Represents True Value W/Absolute Accuracy ML18094A5541989-07-0505 July 1989 Forwards Corrected Page V-4, Gas Chromatography/Mass Spectrometry Fraction-Volatile Compounds for Discharge Outfall Dsn 461C.Missing Lab Analyses Results for Bis Ether & Dischlorodifluoromethane Not Reported Due to Lab Error ML18093B5141989-03-0909 March 1989 Forwards Amended Discharge Monitoring Rept for Plant Containing Info as Required in Permit NJ0005622 for Jan 1989 ML18093B1871988-09-19019 September 1988 Forwards Discharge Monitoring Rept for Util,Containing Info as Required in Permit NJ0005622 for Aug 1988.Rept Presents Only Observed Results of Measurements & Analyses Required to Be Performed by Agencies.Explanations & of Exclusions Encl ML18093B1511988-09-12012 September 1988 Lists Personnel Authorized as Representatives to Sign All State of Nj PDES-related Correspondence & Repts ML18094B1161988-09-0808 September 1988 Responds to 880810 Ltr Discussing Recommended Interim Measures to Reduce Mortality of Sea Turtles at Water Intake ML18094B1221988-08-10010 August 1988 Instructs Util to Implement Procedures to Reduce Mortality of Impinged Marine Turtles.Util Should Also Statistically Study Turtle Impingement Correlation W/Factors Which May Help Predict When Impingement Most Likely ML18093A9851988-07-22022 July 1988 Forwards Discharge Monitoring Rept for Permit NJ0005622 for June 1988 & Corrected Page to May 1988 Rept ML18093A8791988-06-10010 June 1988 Forwards Discharge Monitoring Rept for May 1988 & Corrected Page to Rept for Apr 1988.Exclusion Explanations Encl ML18093A6801988-02-23023 February 1988 Forwards Discharge Monitoring Rept for Jan 1988.Exclusion Explanation Included on Addl Pages.Thermal & Flow Data for Dsn 481-486 for Oct-Dec 1987 Forwarded Under Separate Cover ML18093A6551988-02-17017 February 1988 Forwards Discharge Monitoring Rept Amended Pages for Jan 1985 - Dec 1987.Rept Required & Prepared Specifically for EPA & State of Nj Dept of Environ Protection ML18093A6401988-02-12012 February 1988 Forwards Printouts of IBM-PC Diskettes Containing RW-859 Nuclear Fuel Data for Period Ending 871231 ML18093A8071988-01-25025 January 1988 Forwards Pollutant Discharge Elimination Sys Discharge Monitoring Repts for Dec 1987.Rept Presents Only Observed Results of Measurements & Analyses Required to Be Performed by EPA & New Jersey Dept of Environ Protection ML18093A3261987-08-25025 August 1987 Forwards NPDES Discharge Monitoring Rept for Jul 1987. Exclusion Explanations Also Encl ML18093A2741987-07-24024 July 1987 Forwards Pollutant Discharge Elimination Sys Monitoring Repts for June 1987 & Corrected Pages to May 1987 Thermal & Flow Data ML18092B5441987-04-29029 April 1987 Forwards Discharge Monitoring Rept Per Permit NJ0005622 for Month of Mar 1987.Thermal & Flow Data for Dsn 481-486 Available & Being Forwarded Per 870424 Rept ML18092B4701987-03-18018 March 1987 Forwards Vol 1 to 1986 Inservice Exam of Selected Class 1 & Class 2 Components & Sys of Salem Generating Station,Unit 2, Final Rept.Owners Data Rept for Inservice Insp (Form NIS-1) Also Encl ML20210P5991986-09-25025 September 1986 Forwards NPDES Discharge Monitoring Rept for Aug 1986. Exclusion Explanations Encl ML20203G8291986-07-21021 July 1986 Forwards Discharge Monitoring Rept for June 1986.Exclusion Explanations Also Encl ML20203J3181986-07-18018 July 1986 Notifies That,Per Njac 7:14A-2.4,radiation Protection/ Chemistry Managers for Plants Authorized to Sign All NJPDES- Related Correspondence & Repts ML20154M5171986-02-28028 February 1986 Forwards NPDES Discharge Monitoring Rept for Jan 1986 ML20151W2211986-01-22022 January 1986 Forwards Discharge Monitoring Rept for Dec 1985. Documentation of Accuracy of Direct Vs Indirect Flow Measurement of Cooling Water Will Accompany Discharge Monitoring Rept for Mar 1986 ML20137X6381985-11-22022 November 1985 Forwards NPDES Discharge Monitoring Rept for Oct 1985. Discharge Sampling Locations 482 & 485 Established & Used for Ongoing Entrainment Studies,Precluding Sampling Activities ML18092A8741985-10-15015 October 1985 Informs That Radiation Protection/Chemistry Managers for Facilities Duly Authorized Representatives to Sign All State of Nj Pollution Discharge Elimination Sys Related Correspondence & Repts ML18092A8701985-10-11011 October 1985 Forwards NPDES Discharge Monitoring Rept for Sept 1985. Rept Presents Observed Results Obtained in Accordance W/Approved Methods for Sampling & Monitoring ML18092A8211985-09-17017 September 1985 Forwards NPDES Discharge Monitoring Rept for Aug 1985. ML18092A7521985-08-26026 August 1985 Forwards NPDES Discharge Monitoring Repts for Jul 1985. ML18092A6891985-07-15015 July 1985 Forwards Discharge Monitoring Rept for June 1985.Rept Presents Observed Results Required by EPA & State of Nj Dept of Environ Protection ML18092A5681985-04-12012 April 1985 Forwards NPDES Discharge Monitoring Rept for Mar 1984. Repts Contain Results of Sampling,Analysis,Monitoring & Methods of Reporting ML18092A5161985-02-13013 February 1985 Forwards Discharge Monitoring Repts for Jan 1985.On 850108 & 23,industrial Waste Treatments Overflowed,Allowing 7,000 Gallons of Demineralizer Waste Water to Spill Onto Ground. No Environ Impact Occurred ML18092A3591984-10-17017 October 1984 Forwards NPDES Discharge Monitoring Repts for Sept 1984.On 840918,State of Nj Dept of Environ Protection Informed That Approx 10,000 Gallons of Liquid Discharged Through Yard Drain.Discharge Caused by Temporary Hose Failure ML18092A3001984-09-25025 September 1984 Forwards NPDES Discharge Monitoring Rept for Aug 1984. Discharge Reporting of Data & Accuracy of Results Reflect Working Environ,Design Capabilities & Reliability of Instrumentation.Exclusion Explanations Encl ML18092A2711984-08-22022 August 1984 Forwards NPDES Discharge Monitoring Repts for Jul 1984 ML18092A1981984-05-25025 May 1984 Forwards NPDES Discharge Monitoring Repts for Apr 1984.Info Presents Observed Results Required by EPA & New Jersey Dept of Environ Protection Re Sampling,Analysis,Monitoring & Methods of Reporting ML18089A5121984-01-23023 January 1984 Forwards NPDES Discharge Monitoring Repts for Dec 1983 ML18087A6841983-02-10010 February 1983 Forwards NPDES Discharge Monitoring Repts for Jan 1983 ML20028C1551982-12-21021 December 1982 Forwards NPDES Annual QA Rept for 1982,demonstrating Validity of Analyses Reported on Monthly Discharge Monitoring Repts ML20079H9921982-12-15015 December 1982 Forwards NPDES Discharge Monitoring Rept for Nov 1982 ML18087A5911982-11-16016 November 1982 Forwards NPDES Discharge Monitoring Rept - DE River, for Oct 1982.Exclusion Explanations Encl ML18087A5371982-10-20020 October 1982 Forwards NPDES Discharge Monitoring Repts for Sept 1982 ML18086B6201982-08-18018 August 1982 Forwards NPDES Discharge Monitoring Repts for Jul 1982 ML18086B5411982-06-25025 June 1982 Forwards Discharge Monitoring Repts for May 1982.Exclusion Explanations Also Encl ML18086B4501982-04-22022 April 1982 Forwards NPDES Repts for Mar 1982.Exclusion Explanations Included ML18086B3381982-02-19019 February 1982 Forwards NPDES Discharge Monitoring Rept for Jan 1982. Exclusion Explanations Encl ML18086B0951981-11-19019 November 1981 Forwards NPDES Discharge Monitoring Rept for Oct 1981 ML18086B0431981-11-13013 November 1981 Forwards Neomysis Americana Target Species Specific Rept Per Discussion at Technical Advisory Group 811012 Meeting 1990-04-25 |
Text
- * * * /'\ ..:.:,
Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station Ellen Radow -Chief Bureau of Permits Admin. Division of Water Resources CN-029 Trenton, NJ 08625
Dear Ms. Radow:
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORTS SALEM NUCLEAR GENERATING STATION PERMIT NO. NJ0005622 September 17, 1985 Attached are the Monitoring Report forms for Salem Nuclear Generating Station containing the information as required in .Permit No. NJ0005622 for the month of August, 1985. The information contained in this report presents the observed results required by the Environmental Protection Agency and the New Jersey Department of Environmental Protection, obtained in accordance with approved methods with respect to sampling, analysis, monitoring and methods of reporting.
The reporting of the data and the accuracy of the results reflect the working environment, design capabilities and reliability of the instrumentation.
Discharge sampling locations 482 and 485 are set up and used for ongoing entrainment studies. This precludes any sampling activities.
Since all chemical treatments of or discharges to the circulating water system are common with at least one other discharge, those values are assumed to be identical.
This assumption is made for all identified The columns labeled, "No. Ex.", in the enclosed Discharge Monitoring Report forms tabulate the number of observed results that were above or below, as appropriate, the limits contained in the permit; the limits are reflected on the enclosed forms . ( 8510080086 850917 PDR ADOCK 05000272 R PDR The Energy People
- I NJPDES e Discharge Monitoring Reports 9/17/85
- Exclusion explanations are included on an additional sheet. *
- PDB: slg Attachment C Executive Director, DRBC Very truly yours, t/ohn Trej-:r Chemistry/Rad.
Prot. Manager -Salem Operations Director, USNRC Office of Nuclear Reactor Regulation Dr. Richard Baker Vice President
-Nticlear FI LE: NPDES2. RPT
- *
- 1 NJPDES Report Explanation or exc1'4tons August 9/17/85 The following exclusions are included in the attach.ed report and explained below. Exclusions have not endangered nor significantly impacted health or the environment.
DMR NO. FAC 48C EXPLANATION Net Heat Release -This is a calculated value based on assumed pump flow rates for two. Unit operation and is subject to programatic errors. Ammonia -Current facility operating configuration is not conducive to ammonia removal. Increased removal rates are expected with the commencement of mixer lation and operation .