Forwards NPDES Discharge Monitoring Rept for Oct 1985. Discharge Sampling Locations 482 & 485 Established & Used for Ongoing Entrainment Studies,Precluding Sampling Activities
ML20137X638
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/22/1985
From: Trejo J
Public Service Enterprise Group
To: Radow E
NEW JERSEY, STATE OF
Shared Package
ML20137X641 List:
References
NUDOCS 8512100589
Download: ML20137X638 (3)


Text

r s

3PSEG

' Public Service Electric and Gas Company P.O. Box E Hanccds Body. Ne , Jersey 08038 Salem Generating Station November 22, 1985 Ellen Radow - Chief Bureau'of Permits Ad mi n.

Division of Water Resources

~CN-029 Trenton, NJ 08625

Dear Ms. Radow:

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORTS SALEM NUCLEAR GENERATING STATION PERMIT NO. NJ0005622 Attached are the Di- 'wrge Monitoring Report forms for Salem Nuclear Generating - . ion containing the information as required in Permit No. NJ0005  ? for the month of October, 1985.

The information contained in this report presents the observed results required by the environmental Protection agency and the New Jersey Department of Environmental _ Protection, obtained in accordance with approv'd methods with respect to sampling, analysis, monitoring cod methods of reporting.

The reporting of the data and the accuracy of the results reflect the working e nvi r onme nt, design capabilities and reliability of the instrumentation.

Discharge sampling locations 482 and 485 are set up and used for ongoing entrainment studies. This precludes any sampling a c ti vi ti e s. Since all chemical treatments of or discharges to the circulating water system are common with at least one other c discharge, those values are assumed to be identical. This assumption is made for all identified parameters.

The columns labeled, "No. Ex.", in the enclosed Discharge Monitoring Report. forms tabulate the number of observed results that were above or below, as appropriate, the li mi t s contained in the pe rmi t; the li mi t s are reflected on the enclosed forms.

8512100509 851122 jf DR ADOCK 050002 2 g The Energy Peopk: I

O NJPDES 11/22/85 Discharge M o ni t o r i n g

Reports e

Exclusion explanations are included on an additional sheet.

Very truly yours, i

ohn Trejo Chemistry / Rad. Prot. Manager Salem Operations PDB: sig Attachments

.C ' Executive Director, DRBC Di re c t or, USNRC Office of Nuclear Reactor Regulation Vice President - Nuclear

. FI LE: NPDES 3.RPT i

L i

f

, -NJPDES Report 11/22/85

-Explanation of exclusions October-The following exclusions are included in the attached report and explained below. Exclusions have not endangered nor significantly impacted health or the environment.

DMR N O.- EXPLAN/ TION-FAC Net Heat Release - This is a calculated value based on assumed pump flow rates for two Unit operation and is subject to programatic errors. A review of the program is being conducted.

Expected corrections by 12/85.

483 AT.TSS - Cause of high values uaknown.

487A Fecal Coliform - Investi-gation of cause proved i nc oncl us i ve. Operation of the plant has been modified and chlorination supply changed. Sub-sequent test results showed no fecal coliform bacteria.

(