Forwards NPDES Discharge Monitoring Repts for Salem Generating Station for Month of May 1995
ML18101A790
Person / Time
Site: Salem  PSEG icon.png
Issue date: 06/20/1995
From: Summers J
Public Service Enterprise Group
To: Caporale G
NEW JERSEY, STATE OF
Shared Package
ML18101A791 List:
References
NUDOCS 9506280225
Download: ML18101A790 (5)


Text

~

  • 2'Jbl1c'Service Electric ancl Gas Company P 0. Box 236 Hancocks Bridge. 1\Jew Jersey 08038-0236 Nuclear Business Unit JUN 201995 Chief George Caporale Bureau of Information Systems CN-029 Trenton, NJ 08625 NEW JERSEY POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORTS SALEM GENERATING STATION PERMIT NO. NJOOOS622 Attached is the Discharge Monitoring Report for Salem Generating Station containing the information as required in Permit No.

NJ0005622 for the month of May 1995.

  • This report is required by and prepared specifically for the Environmental Protection Agency (EPA) and the New Jersey Department of Environmental Protection (NJDEP) . It presents only the observed results of measurements and analyses required to be performed by the above agencies. The choice of the measurement devices and analytical methods is controlled by EPA and NJDEP, not by the company, and there are limitations on the accuracy of such measurement devices and analytical techniques even when used and maintained as required. Accordingly, this report is not intended as an assertion that any instrument has measured, or any reading or analytical result represents, the true value with absolute accuracy, nor is it an endorsement of the suitability of any analytical or measurement procedure.

yours, John c. Summers General Manager -

Salem Operations SRT:pc Attachments 260*0

.. i r-

.i.d 9506280225 950620 PDR ADDCK 05000272 R PDR 95*2168 REV 6 g.:

NJPDES Report :May 1995 C Mr. Gerald M. Ransler - Executive Director USNRC - Document Control Desk Manager-Licensing & Regulations M. Vaskis D. Hurka Central Record Facility File RPC95-122

NJPDES Report Explanation of Deviations

t:'Iay 1*995 The following explanations are included to clarify possible deviations from permit conditions.

General - The columns labeled, "No. Ex.," on the enclosed DMR, tabulate the number of daily discharge values outside the indicated limits.

Data reporting and accuracy reflect the working environment, the design capabilities and reliability of the monitoring instruments and operating equipment.

All reported concentrations are based on daily discharge values.

Total residual chlorine is performed three times per week during chlorination unless otherwise indicated.

Analytical values which are less than detectable are reported as zero unless otherwise indicated.

Analytical results for all parameters other than pH, temperature, TSS, TRC and Bioassay are provided by NET Atlantic, Inc. (NJDEP certification 08153).

Bioassay results are provided by AnalytiKEM Inc.

(NJDEP certification 82888) .

Net negative discharge values are reported as negative.

487B Flow calculated as per permit based on Wilmington NWS Data 489C Flow thru outfall 489 is calculated based on Oil Water Separator Lift Pump run times.

481-486 - Chlorination of the circulation water syste~ normally does not occur except as otherwise noted. Service water system chlorination is normally continuous and is monitored on the circulating water system outfall.

Chlorination of both systems will be indicated by results reported for both and represents their combined effect upon the circulating water outfall.

NJPDES Report ~xplanation of Deviations May 1~95 48C - Non-Radioactive Liquid Waste - This system continues to be operated in a batch mode to treat for hydrazine and ammonia by the addition of sodium hypochlorite. No hydrazine has been discharged from this outfall during the reporting period. Residual chlorine is monitored at the outfalls of DSN's 481, 482, 484, and 485, and has not exceeded the permit limits at these outfalls.

The following excursions are included in the attached report and are explained below. Excursions have not endangered nor significantly impacted public health or the environment.

DMR NO. EXPLANATION NONE

COUNTY OF SALEM STATE OF NEW JERSEY I, John c. Summers, of full age, being duly sworn according to law, upon my oath depose and say:

1. I am General Manager of Salem Generating Station, and as such, am authorized to sign Discharge Monitoring Reports submitted to the New Jersey Department of Environmental Protection and Energy pursuant to the Station's New Jersey Pollutant Discharge Elimination System permit.
2. I have reviewed the attached Discharge Monitoring Reports.

Pursuant to N.J.A.C. 7:14A-2.4, I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments and that based on my inquiry of those individuals responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

3. The signature on the attached Discharge Monitoring Reports is my signature and I am submitting this affidavit in satisfaction of the requirement that my signature be notarized.

John C. Summers General Mqnager -

Salem Operations Sworn and subscr~~ ~~f~re me

, this d/ot~ ~1995.

~ln Jb~

KIMBERLY JO BROWN NOTARY PUBLIC OF NEW JERSEY Mv Commission Expires April 21. 1998