e PS~G**
Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station Dr. Richard A. Baker, Chief Permits Administration Branch Planning & Management Division November 16, 1982 U.S. Environmental Protection Agency, Region II 26 Federal Plaza New York, New York 10278 Attention:
Mr. Clifford Lundin
Dear Sir:
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORTS SALEM NUCLEAR GENERATING STATION PERMIT NO. NJ0005622 Attached are the Discharging Monitoring Reports for Salem Nuclear Generating Station containing the information, as outlined in Permit No. NJ0005622 for the month of October, 1982.
Exclusion explanations are included on an additional sheet.
EJK:slg Very truly yours, L. K. Miller -
Technical Manager -
Salem Operations CC:
Assistant Director for Operations and Enforcement, NJDEP Executive Director, DRBC Director, USNRC Office of Nuclear Reactor Regulation
. ~-. -
--*~
=~-::--.*..
. 8211290374 821116
.. PDR ADOCK 0500027'2
. R PDR The Energy People 95-2189 (20M) 11-81
N'PDES Permit ~o. N~?S622 Salem Generating Station Explanation of exclusions October, 1982 1
11/11/82.
The following exclusions are included in the attached report and explained below.
Exclusions have not endangered nor significantly impacted health or the environment.
DMR No.
481 484 486 FAC 87A 489 EXPLANATION Total Suspended Solids - Correlation of influent and effluent analytical results indicates sampling technique or systematic flow related problems.
Continued net discharge of this magnitude is not feasible.
Installation of an improved sampling system is in progress.
Total Suspended Solids - Correlation of influent and effluent analytical results indicates sampling technique or systematic flow related problems.
Continued net discharge of this magnitude is not feasible.
Installation of an improved sampling system is in progress.
Effluent Temperature Differential -
Less than the design number of Circulators in operation.
Effluent Temperature Differential -
Less than the design number of Circulators in operation.
Effluent Net Heat Release -
Due to Two Unit operation.
BOD loading -
System flow exceeds design capacity.
Parallel Unit undergoing startup testing.
Total Suspended Solids -
Exceeds effluent limitation due to inclement weather causing excessive runoff.