ML18106A969

From kanterella
Jump to navigation Jump to search
Forwards Discharge Monitoring Rept for Salem Generating Station Containing Info as Required in Permit NJ0005622 for Month of Oct 1998.Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection
ML18106A969
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/19/1998
From: Trum M
Public Service Enterprise Group
To:
NEW JERSEY, STATE OF
Shared Package
ML18106A970 List:
References
P-461-187-842, NUDOCS 9811300092
Download: ML18106A969 (11)


Text

. : ... .. . . . . ..

      • 'r i

.Public ~ervice Electric and Gas Company P.O. Box 236 Hancocks Bridge, New.J~rsey 08038-0236 Nuclear Business Unif November 19, 1998 New Jersey Department of Environmental Protection Division of Water Quality Bureau of Permit Management CN029 Trenton, NJ 08625-0029 Certified Mail Number P 461 187 842 NEW JERSEY POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORTS SALEM GENERATING STATION PERMIT NO. NJ0005622 Attached is the Discharge Monitoring Report for Salem Generating Station containing the information as required in Permit No. NJ0005622 for the month of October, 1998.

This report is required by and prepared specifically for the Environmental Protection Agency (EPA) and the New Jersey Department of Environmental Protection (NJDEP).

It presents only the observed results of measurements and analyses required to be performed by the above agencies. The choice of the measurement devices and analytical methods is controlled by EPA and NJDEP, not by the company, and there are limitations on the accuracy of such measurement devices and analytical techniques even when used and maintained as required. Accordingly, this report is not -lriten-ded -- --

as an assertion that any instrument has measured, or any reading or analytical resul~

represents, the true value with absolute accuracy, nor is it an endorsement of the

  • suitability of any analytical or measurement procedure.

in J. Trum neral Manager - (Acting)

Salem Operations Attacnments 9811300092-98-1119 7 - - - - - - -

PDR R

ADOCK 05000272 'i PDR I

NJPDES Report 2 October, 1998 C Executive Director - DRBC USNRC - Document Control Desk Unit#1-50-272 Unit#2-50-311 General Manager - Salem Operations Director - Licensing, Regulation, and Fuels M. Vaskis D. Hurka J. Schloss Central Record Facility E. Keating

NJPDES Report Explanation of Deviations October, 1998 The following explanations are included to clarify possible deviations from permit conditions.

General - The columns labeled, "No. Ex. " on the enclosed DMR, tabulate the number of daily discharge values outside the indicated limits.

Data reporting and accuracy reflect the working environment, the design capabilities and reliability of the monitoring instruments and operating equipment.

All reported concentrations are based on daily discharge values.

Total residual chlorine is performed three times per week during chlorination unless otherwise indicated.

Analytical values which are less than detectable are reported as zero unless otherwise indicated.

Analytical results for all parameters other than pH, temperature, TSS, TRC and Bioassay results are provided by Raytheon Environmental Services Laboratory. (NJDEP certification 77343) or South Jersey Testing Laboratory (NJDEP certification 06431). Bioassay results are provided by New England Bioassay, Inc. (NJDEP certification 46405).

. Net negative *discharge values are reported as negative.

489C- Flow thru outfall 489 is calculated based on Oil Water Separator Lift Pump run times.

481-486 - Chlorination of the circulation water system normally does not occur except as otherwise noted. Service water system chlorination is normally continuous and is monitored on the circulating water system outfall.

Chlorination of both systems will be indicated by results reported for both and represents their combined effect upon the circulating water outfall.

NJPDES Report Explanation of Deviations October, 1998 48C - Non-Radioactive Liquid Waste - This system continues to be operated in a batch mode to treat for hydrazine and ammonia by the addition of sodium hypochlorite. No hydrazine has been discharged from this outfall during the reporting period~ Residual chlorine is monitored at the outfalls of DSN's 481, 482, 484, and 485, and has not exceeded the permit limits at these outfalls.

The following excursions are included in the attached report and are explained below.

Excursions have not endangered nor significantly impacted public health or the environment.

DSN NO. EXPLANATION None

COUNTY OF SALEM STATE OF NEW JERSEY I, Martin J. Trum, of full age, being duly sworn according to law, upon my oath depose and say:

1. I am General Manager (Acting) of Salem Generating Station, and as such, am authorized to sign Discharge Monitoring Reports submitted to the New Jersey Department ofEnvironmental Protection pursuant to the Station's New Jersey Pollutant Discharge Elimination System permit.
2. I have reviewed the attached Discharge Monitoring Reports. Pursuant to N.J.

A. C. 7: 14A-2.4, I certify under penalty oflaw that I have personally examined and am familiar with the information submitted in this document and all attachments and that based on my inquiry of those individuals responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

3. The signature on the attached Discharge Monitoring Reports is my signature and I am submitting this affidavit in satisfaction of the requirement that my signature be notarized.

General Manager - (Acting)

Salem Operations Sworn and subscribed before me this i.S_~ay ofba~I 998 DANA L BUSSEY NOTARY PUBL!C OF NEW JERSE':'

MY COMMISSION EXPIRES AUG. 1. 2001

e OPS~G MAPLEWOOD TESTING SERVlCES REPORT TO: Dave Hurka September 29, 1998 Sr. Staff Engineer - Nuclear Report No.TP98012 PSE&G

SUBJECT:

DETERMINATION OF CIRCULATING.WATER FLOW AT SALEM GENERATJNG STATION - UNIT N0.1 CONDUCTED BY: Victor Simpson Sr. Test Engineer, Maplewood Testing Services PURPOSE To determine the flow capacities of the Unit No.1 circulating water pumps.

SUMMARY

On September 22 and 23, 1998 the Mechanical Division of Maplewood Testing Ser1ices conducted a series of test runs at Salem Unit No.1 ta determine the capacities of the 11A, 118, 12A, 128, 13A and 138 (CMS designations H, J, K, M, Land A respectively) circulating water pumps.

Final test results are shown in Table 1 and Figure 1.

DISCUSSION Discharge pressures could not be measured at the pump due to plugged feeler lines. The total dynamic heads reported were calculated using the pressures measured at the inlet water boxes which were lower than the pump discharge pressures. The difference in pressure is a result of losses. in the piping between the pumps and the waterboxes.

Dave Hurka Septe*mber 29, 1998 Sr. Staff Engineer;.. Nudear Report No.TP98012 PSE&G TEST METHOD The circulating water flow rate was determined by fluorometry using MTS Mechanical Division Procedure Mech-40 "Determination of Water Flow Using The Turner Fluorometer". Rhodamine VVT dye was injected into the bell mouth of each pump using 1'2 inch PVC pipe with a carrier flow oJ screen wash water at 3 gallons per minute. The dye was injected at a known rate using a peristaltic pump and a class A burette to measure rate. The diluted sample was retrieved and monitored by taking a sample from the inlet water box piping. The ratio of the injected concentration to the sampled concentration multiplied by the injection flow rate yielded the circulator flow rate.

The total dynamic head was obtained by measuring the pump su.ction head in feet from elevation 100 and the pump discharge head in feet of water at the water box inlet. After correcting for elevation the total dynamic head was calculated as the pump discharge head minus the pump suction head.

Senior Supervising Test Engineer Mechanical Division

~Su_

nag er 7~--

Mechanical Division cc M. Welker F. Tod~¥, . ~.,..:

. ~~-,

F:\MAG\TP98012\T?98012.DOC

SALEM GENEHATING STATION - UNIT N0.1 TOTAL DYNAMIC HEAD VS. CIRCULATING WATER PUMP FLOW D Pump I (11A)

'\l Pump H (11B)

I r

0 PumpK(12A)

Pump M (12B)

II'.

  • 0 Pump L (13A)

PumpA(13B)

I~ L----------'

~IL 0

Iii *******1********************

H! ****+ 1********

~iii

r.

u 401---;..._-:----';..._--'~

~

z GUARANTEE POINT D ... --~1-1:-~~---L . . . . :. . . . ..

~

l-o I- 'ISJ0i 20 t--___,_ _ ,_ _,__ _ , ____ . . --*** .. I~-**- - - r - - - i - - _ p . , ,_ _,__ _,__ _,_---1 O'---'---'---L-------'---'~:-..i--j___-'--*-*-- * - * * - * - - * ' - - - L - - L - - ' - - - - ' L - - - " ' - - - - ' - - - ' - - - ' ' - - - - l - - - ' - - - L - - - L - > - - - '

150 200 o 50 ' 100 PUMP FLOW - 1000 GPM PSE&G Maplewood Tesling Services GSALEM FIGURE 1 Report No. TP98012 September 1998

Table 1 Salem Generating Station Circulating Water Pump Flow Test Maplewood Testing Services Mechanical Division Report Number TP98012

SUMMARY

OF TEST RESULTS Pump CMS Test Measured Pump Pump Total No. Pump Date Pump Suction Discharge Dynamic Desig. Capacity Head Head Head (gpm) (ft h2o) (ft h2o) (ft h2o) 11A H 09/22/98 172,745 -7.6 16.4 24.0 118 j 09/22/98 173,715 -8.8 14.7 23.5 12A I

I K 09122198 177,2251 -9.4 !

I 14.51 23.9 I

128 I M 09/22198 I 160,638 -10.1 15.7 25.8 13A I L 09/23/98 I 177,993 I

-10.0 13.71 23.7

  • --- ----1---- ----- ---------- --- - -- --

I ---8.2-1- 1s5,494 138 A 09/23/98 15.3 23.5 Note: Pump suction heads and discharge heads corrected to elevation 100'

T-VWX-014 NEW JERSEY DEP ARTI\IBNT OF ENVIRO:MENTAL PROTECTION DIVISION OF WATER QUALITY MONITORING REPORT - TRANSMITI'AL SHEET NJPDESNO. REPORTING PERIOD 101010151612121 Mo.Yr. Mo.Yr.

111019181 111019181 PERMI'ITEE: Name  : Public Service Electric and Gas Company Address: P.O. Box 236 FACILITY: Name  : Salem Nuclear Generating Station Address: Alloway Creek Neck Road Hancock's Bridge Telephone: (609) 935-6000 FORMS ATTACHED (Indicate Quantity of Each) Operating Exceptions SLUDGE REPORT-SANITARY Yes No

_Q_T-VWX-007 _Q_T-VWX-008 _Q_T-VWX-009 DYE TESTING x 0 EPA FORM 3320-1 TEMPORARY BYPASSING x SLUDGE REPORT-INDUSTRIAL

_Q_T-VWX-OlOA _Q_T-VWX-OlOB DISINFECTION INTERUPTION x WASTEWATER REPORTS MONITORING MALFUNCTIONS x

_Q_T-VWX-011 _Q_T-VWX-012 _Q_T-VWX-013 UNITS OF OPERATION x GROUNDWATER REPORTS

_Q_VWX-015(A,B) _Q_VWX-016 _Q_VWX-017 OTHER x 0 ELECTRONIC SUBMISSION

- (Detail any "Yes" on reverse .side in appropriate space) ____ - - ----

NJPDES DISCHARGE MONITORING REPORT 11._EPA FORM 3320-1 NOTE: The "Hours Attended at Plant" on the reverse -

of this sheet must also be completed.

A UIHENTICATION I certify under penalty of law that this document and all attachments were prepared under the direction of supervision in accordance with a system designed to assure my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the infonnation, the infonnation submitted is, to the best of my knowledge and belief: true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

LICENSED OPERATOR PRINCIPAL EXECUTIVE OFFICER or DULY AUTIIORIZED REPRESENTATIVE Name (Printed) Michael J. Kubiak Grnde & ¥ - 2

,_Signature f 001~

0 ~ .

Date 11

0PER~TING EXCEPTIONS DETAILE.

0

  • Page 2 ADDITIONAL SAMPLES WERE TAKEN ON OUTFALLS 481A, 482A, 483A, 484A, 485A,,AND 486A TO COMPLY WITH NJAC7:18. E HOURS ATTENDED AT PLANT Month L1.iQJ Year ~

Day of Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Licensed Operator 8 8 0 0 8 8 8 8 8 0 0 8 8 8 8 8 Others 4 4 0 0 4 4 4 4 4 0 0 4 4 4 4 4 Day of Month 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Licensed Operator 0 0 8 8 8 8 8 0 0 8 8 8 8 8 0 Others 0 0 4 4 4 4 4 0 0 4 4 4 4 4 0