ML18092A752
| ML18092A752 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/26/1985 |
| From: | Trejo J Public Service Enterprise Group |
| To: | Radow E NEW JERSEY, STATE OF |
| Shared Package | |
| ML18092A753 | List: |
| References | |
| NUDOCS 8509040021 | |
| Download: ML18092A752 (2) | |
Text
...
Public Service Electric ant;J Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station Ellen Radow -
Chief Bureau of Permits Admin.
Division of Water Resources CN-029 Trenton, NJ 08625
Dear Ms. Radow:
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORTS SALEM NUCLEAR GENERATING STATION PERMIT NO. NJ0005622 August 26, 1985 Attached are the Discharge Monitoring Report forms for Salem Nuclear Generating Station containing the information as required in Permit No. NJ0005622 for the month of July 1985.
The information contained in this report presents the observed results required by the Environmental Protection, Agency and the New Jersey Department of Environmental Prot-tect ion, obtained in accordance with approved methods with respect to sampling analysis, monitoring and methods of reporting.
The reporting of the data and the accuracy of the results reflect the working environment, design capabilities and reliability of the instrumentation.
Discharge samp.l ing locations 482 and 485 are set up and used for ongoing entrainment studies.
This precludes any sampling activities.
Since all chemical treatments of or discharges to the circulating water system are common with at least one other discharge, those values are assumed to be identical.
This assumption is made for all identified parameters.
The columns labeled, "No, Ex.", in the enclosed Discharge Monitoring Report forms tabulate the number of observed res u 1 t s that were above or be 1 ow, as a ppr op r i at e, the -1 i mi t s contained in the permit; the limits are reflected on the enclosed forms.
The Ene1*gy Peop!e 8509040021 850826 PDR ADOCK 05000272 R
~.
NJPDES Discharge Monitoring Reports 8/25/85 Pursuant to Consent Order EPA-CWA-II-82-77 <May 27, 1983),
modifications to the Industrial Wastewater Treatment Facility <DSN 48C) was certified as complete to the NJDEP as part of the Stage III Treatment Works approval on May 30, 1 985
- Exclusion explanations are included on an additional sheet.
PDB:slg Attachment C Executive Director, DRBC Very truly yours, ftfn~
Radiati~~(~rot./Chem. Manager Director, USNRC Office of Nuclear Reactor Regulation Dr. Richard Baker Vice President - Nuclear