ML053070402
From kanterella
Revision as of 13:21, 29 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML053070402 | |
Person / Time | |
---|---|
Site: | Davis Besse ![]() |
Issue date: | 04/20/2001 |
From: | Rhex Edwards - No Known Affiliation |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML053070402 (59) | |
Similar Documents at Davis Besse | |
---|---|
Category:- No Document Type Applies
MONTHYEARML22041B1072022-02-10010 February 2022
[Table view]LTR-22-0033-1 Oedo Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML20177A4932020-06-25025 June 2020 Enclosure a - Redacted Owners, Officers, Directors, and Executive Personnel Forms for Energy Harbor Corp., Energy Harbor Nuclear Corp., and Energy Harbor Nuclear Generation LLC ML20008D2232020-01-0808 January 2020 NRC Region I Twitter Feeds 10-1 to 12-31-2019 L-16-092, Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 62016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 6 ML16132A3962016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 5 of 6 ML16132A3942016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 3 of 6 ML16132A3932016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 2 of 6 ML15231A3642015-05-27027 May 2015 FOIA/PA-2014-0204 - Resp 1 - Final, Group a ML12167A0622012-07-16016 July 2012 Enclosure - Davis-Besse 17RFO SG Tube Inspection Tables ML12170B1042012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #4 Scenario ML12170B1052012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #5 Scenario ML12200A1832012-06-12012 June 2012 Unit Licensing Basis Seismic Ground Motion Concern ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11348A0432011-12-12012 December 2011 Email -- Davis-Besse SB Crack Rc Investigation RFI ML12213A3532011-11-15015 November 2011 Shield Building Laminar Cracking ML12213A3512011-11-10010 November 2011 Containment Shield Building Issue ML12200A1952011-11-0707 November 2011 Shield Building Issue NRC Technical Reviewer Focus Questions ML11301A2392011-10-31031 October 2011 Reference: Wind Resource Estimates Developed by Aws Truepower LLC for Windnavigator ML11301A2352011-10-31031 October 2011 References: Concentrating Solar Resources of the United States ML1126601882011-09-23023 September 2011 NRC 2011 Davis-Besse L-11-165, Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30)2011-05-27027 May 2011 Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30) ML11193A1332011-05-27027 May 2011 Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab H 1 Through Tab H 16) ML11193A1042011-05-27027 May 2011 Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab H 17 to Tab C 2) ML11227A1962011-05-27027 May 2011 Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab Am 1 Through a 7) ML11109A0842011-04-15015 April 2011 Attachments B-D, to L-11-107, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application ML1016006942010-06-10010 June 2010 G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse - T. Gurdziel Questions ML1017301232010-06-0909 June 2010 Green Ticket Tritium Releases ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML0906500232009-03-0606 March 2009 Safety Culture Policy Statement (Safety & Security) Comments ML0904800182009-02-17017 February 2009 Public Comments Regarding the Safety Culture Policy Statement ML0906404392009-01-28028 January 2009 Enclosure 5: Case Study 1: Structure of TS for Ultrasonic Flow Meters - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf ML0829101252008-11-20020 November 2008 ITSB R-Relocated Specifications - to Davis Besse Amendment Beyond Scope Issues ML0829007802008-11-20020 November 2008 ITSB L-Less Restrictive Changes - Attachment to Davis-Besse Amendment Beyond Scope Issues ML0829006832008-11-20020 November 2008 Table A-DOC Attachment - Administrative Changes - to Davis-Besse Amend. ITS with Beyond Scope Issues ML0829006302008-11-20020 November 2008 List of Acronyms to Davis-Besse Amend. Re; ITS with Beyond Scope Issues ML0829101122008-11-20020 November 2008 ITSB M - More Restrictive Changes - to Davis Besse Amendment Beyond Scope Issues ML0824902712008-10-0202 October 2008 List of Acronyms to Davis Besse Draft Amend. ITS Conversion L-08-241, Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs2008-08-26026 August 2008 Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs ML0803600792008-02-0101 February 2008 Attachment 1- DBNPS Steam Generator Inspections Data ML0802800442008-01-25025 January 2008 Special Inspection Evaluation, Basis for Investigatory Response Decision for a Significant Operational Power Reactor Event ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0733801902007-06-27027 June 2007 Meeting Attendees, 6/27/07, Meeting with Firstenergy Nuclear Operating Company Regarding May 14, 2007, Demand for Information ML0634705992006-12-14014 December 2006 Plant Service List ML0535402852005-12-16016 December 2005 Issuance of Conforming Amendments for Bv, Units 1 and 2; Perry, Unit 1 and Davis-Besse, Unit 1 Transfer of Ownership Interests to Fengenco - Amendment 7 to Indemnity Agreement B-79 ML0530704422005-11-0808 November 2005 Proposal to Clean Incore Tunnel and Below Vessel - a Locked High Radiation Area ML0531302012005-04-21021 April 2005 Timeline for Enforcement Actions ML0423002112004-08-0505 August 2004 Submittal of Independent Assessment Plan for the Davis-Besse Nuclear Power Station Operations Performance, Revision 2 2022-02-10 Category:Drawing MONTHYEARL-20-234, 3 to Updated Final Safety Analysis Report, Drawings - Part 7 of 7 (Redacted)2020-09-25025 September 2020
[Table view]3 to Updated Final Safety Analysis Report, Drawings - Part 7 of 7 (Redacted) ML20302A3392020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 3 of 7 ML20302A3432020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 2 of 7 ML20302A3412020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 4 of 7 ML20302A3372020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 1 of 7 ML20302A3402020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 5 of 7 ML20302A3382020-09-25025 September 2020 3 to Updated Final Safety Analysis Report, Drawings - Part 6 of 7 ML17045A4862016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00016, Rev 14 ML17045A5532016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00059, Rev 13 ML17039A7612016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing E-030-00005, Rev 6 ML17045A4312016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00001, Rev 3 ML17045A5032016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00041, Rev 8 ML17045A4902016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00029, Rev 13 ML17039A7662016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing E-030-00016, Rev 21 ML17045A5012016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00039, Rev 14 ML17045A5192016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00057, Rev 7 ML17045A5552016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00061, Rev 6 ML17045A5582016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00064, Rev 12 ML17045A4922016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00031, Rev 9 ML17045A4872016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-0001, Rev 12 ML17045A5162016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00054, Rev 11 ML17045A4882016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00018, Rev 12 ML17039A9362016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing E-030AQ-00036, Rev 2 ML17045A5652016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00071, Rev 5 ML17045A4852016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00015, Rev 11 ML17045A5092016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00047, Rev 8 ML17045A4302016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-180Q-00014, Rev 13 ML17045A4822016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00012, Rev 14 ML17039A7982016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00037, Rev 20, ML17039A8042016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00047, Rev 15, ML17045A4912016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00030, Rev 6 ML17039A8152016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00345, Rev 1 ML17039A8142016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00344, Rev 1 ML17039A8062016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00340, Rev 1 ML17039A8122016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00342, Rev 2 ML17045A5682016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00073, Rev 5 ML17039A8112016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report Dwg E-030-00341, Rev 2 ML17039A8132016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00343, Rev 3 ML17045A5642016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00070, Rev 8 ML17045A5562016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00062, Rev 7 ML17045A5112016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00049, Rev 13 ML17039A8172016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Dwg E-030-00346, Rev 4 ML17045A5572016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00063, Rev 7 ML17039A7642016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing E-030-00014, Rev 15 ML17045A5152016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00053, Rev 7 ML17045A5122016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00050, Rev 6 ML17045A4962016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00035, Rev 9 ML17045A5172016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00055, Rev 11 ML17045A5702016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00075, Rev 11 ML17045A5072016-11-21021 November 2016 Revision 31 to Updated Final Safety Analysis Report, Drawing M-536-00045, Rev 9 2020-09-25 Category:Graphics incl Charts and Tables MONTHYEARML20142A3972020-05-0505 May 2020
[Table view]Annual Radiological Environmental Operating Report, Figure 32, Wind Rose Annual Average 10M ML20142A3982020-05-0505 May 2020 Annual Radiological Environmental Operating Report, Figure 31, Wind Riose Annual Average 75M ML20142A3992020-05-0505 May 2020 Annual Radiological Environmental Operating Report, Figure 30, Wind Rose Annual Average 100M ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15239B2122015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15238B8652015-09-0303 September 2015 FHRR MSFHI Tables 1 and 2 ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T L-13-257, Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45)2013-07-23023 July 2013 Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45) ML12167A2622012-05-29029 May 2012 Enclosure - Davis-Besse 17RFO License Condition 2.C(7) SG Circumferential Crack Report ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML1015201172010-05-28028 May 2010 Nozzle 4 - 52M Deposit Depth ML1005396232010-02-22022 February 2010 Lessons Learned Task Force Action Plan Regarding Stress Corrosion Cracking Dec 2009 (Final Update) ML0824903002008-10-0202 October 2008 ITSB Draft R, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues ML0824902752008-10-0202 October 2008 Draft a, Attachment to Davis Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues ML0824902802008-10-0202 October 2008 ITSB Draft La, to Davis Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues ML0824902952008-10-0202 October 2008 ITSB Draft M, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues ML0824902892008-10-0202 October 2008 ITSB Draft L, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues L-08-094, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Amendment Application2008-03-12012 March 2008 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Amendment Application ML0727405102008-02-11011 February 2008 Lltf Action Plan Feb 2008 Update - Public ML0803700812008-02-0101 February 2008 Lltf Status of Recommendations February 2008 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0708602822007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Appendix B, Crack Driving Force and Growth Rate Estimates ML0708602532007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 3. Background ML0708602612007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 5. Worldwide Industry Response to CRDM and Other Alloy 600 Nozzle Cracking ML0708602682007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 7. FENOC/Davis-Besse Response to CRDM Cracking and Boric Acid Corrosion Issues ML0708602812007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Appendix a, Finite Element Stress Analysis of Davis-Besse CRDM Nozzle 3 Penetration ML0708602712007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 8. Stress Analysis and Crack Growth Rates for Davis-Besse CRDM Nozzles 2 and 3 ML0708602642007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 6. Boric Acid Wastage of Carbon Steel Components in Us PWR Plants ML0702603952007-01-31031 January 2007 Summary of Conference Telephone Call Regarding the Spring 2006 Steam Generator Inspections - Handouts ML0618002582006-06-27027 June 2006 Closure of Davis-Besse Operational Improvement Plan ML0611401302006-03-16016 March 2006 Ltr Fm J. Gutierrez, Morgan Lewis to S. Brock Requesting to Withhold Materials from Public Disclosure Which Was Submitted by FENOC - Affidavits of Terry Young and Warren Bilanin ML0525707982005-09-12012 September 2005 Documentation of Completed Post-Restart Process Plan for Transition of Davis-Besse from the IMC 0350 Oversight Process to the Reactor Oversight Program (ROP) ML0523801412005-08-31031 August 2005 Status of Davis-Besse Lessons Learned Task Force Recommendations - Last Update: August 31, 2005 ML0411301992004-04-21021 April 2004 Oversight Panel Final Restart Checklist Public Release Memo ML0414503382004-02-13013 February 2004 Oversight Panel Open Action Item List ML0414503372004-02-13013 February 2004 IMC 0350 Panel Process Plan ML0414503262004-02-13013 February 2004 Restart Action Matrix - Open Items Only ML0308000432003-01-0101 January 2003 Firstenergy Nuclear Operating Company, NRC Allegations and Employee Concerns Program Contact Trends, January 2002 - January 2003 ML0224601492002-08-29029 August 2002 Undated Data Chart, CDF, LERF, Rem ML0224601482002-08-29029 August 2002 Heat 69 Crack Growth - Bounding Weibull with 1.5 Shape Facto with Handwritten Notes ML0224601422002-08-29029 August 2002 Chart, Long-Term Results for Integrated Model with Handwritten Notes ML0224003452002-08-27027 August 2002 Failure Frequency Curve for Davis-Besse Conditions ML0224003402002-08-27027 August 2002 Draft Graphs for Flaw Curves and Stress Intensity Factors ML0530703682002-03-13013 March 2002 Timeline of Key Events Related to Reactor Vessel Head Boric Acid Wastage Rev.3, 3-13-02 ML0530704022001-04-20020 April 2001 Normal Sump Pump Samples 2020-05-05 Category:Letter MONTHYEARIR 05000346/20243012024-02-0202 February 2024
[Table view]NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML053070402&oldid=1158512"