ML12170B104
Jump to navigation
Jump to search
| ML12170B104 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 06/18/2012 |
| From: | Office of the Chief Human Capital Officer |
| To: | |
| References | |
| Download: ML12170B104 (1) | |
Text
Updated 6/11/12 WORKSHOP #4, Issue Compilation Davis-Besse Loss of Feedwater Event You have been provided with a description of a loss of feedwater event that occurred at the Davis-Besse plant in 1985. This material was extracted in its entirety from NUREG-1154 (Loss of Main and Auxiliary Feedwater at the Davis-Besse Plant on June 9, 1985).
Your TEAM assignment
- After considering the event, compile a list of issues that, in your judgment, warrant further evaluation (i.e., what piqued your regulatory interest).
- Prepare a presentation of your results and be ready to discuss the technical logic of your selections as directed by the instructor.