ML022460142
| ML022460142 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/29/2002 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| References | |
| FOIA/PA-2002-0229 | |
| Download: ML022460142 (1) | |
Text
/ *./*'f__
/'.
(7 70 60 CCPOF=0.01 CCPOF=O.01 IL 50 0
S 40 30
.,*30
~-,
20 10 0
I I
I III!
I I!1 I
I i1 II II 0
50 100 150 Crack Half Angle I I I, 1
,,1 I f
il 1' 1 1 1'11 lo l l 0.7 0.6 a
0.5 0-0.4 "6
0.3
.0 1. 0.2 0.1
- 0.
0 10 20 30 40 50
- 60.
Time to Failure (months)
Long term results for integrated model. Linear region extends from about 25-50 months.
Integrated model:
Calculation is for some fixed period of operation (say 20 EFPY at 600TF)
- 1.
Determine number of nozzles that have cracked by randomly selecting a value of the Weibull parameter from a lognormal distribution with log mean 5.35 and 0.65
[determined by fitting to available inspection results] and assuming a Weibull slope of 1.5.
The fraction of cracked nozzles is given by IfIOrnIMýJU1 i
i tnin rl-cCd was deleted in accordance with the Freedom of Information Act, exemptions.. 5 I
,:OIA--?**z.2.?*
%Q