Morgan, Lewis & Bockius UIP 1111 Pennsylvania Avenue, NW
-T J\\4vorgari Ie'iV]s Washington, DC 20004 l
C COiUNSELORS AT LA IV Tel: 202.139.3000 C
5 5
Fax: 202.139.3001 L
P
- .u P.
53 www.morganlewis.com Jay M. Gutierrez Partner 202.739.5466 jgutierrez(_morganlewis.com March 16, 2006 VIA FEDEX Sara E. Brock, Esq.
Office of the General Counsel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Re:
Request Under 10 CFR H 2.390 and 9.17 to Withhold Materials from Public Disclosure
Dear Ms. Brock:
As I m ntioned in my letters dated January 31 and February 7, FENOC has asked the owners of documents that may contain proprietary information to review their documents and to supply FENOC with affidavits for any such document that the owners determine should be withheld from public disclosure. Consequently, in this letter I am forwarding to you:
- 1.
Affidavit of Terry Young, Director of Communications for the Institute of Nuclear Power Operations, requesting withholding from public disclosure the documents listed in the table attached to the affidavit; and
- 2.
Affidavit of Warren Bilanin, a Director of the Electric Power Research Institute, requesting withholding from public disclosure the documents listed in the table attached to the affidavit.
These are the last of the vendor affidavits responsive to your request to me dated November 9, 2005, and Christine Lipa's subsequent request to Mark Bezilla dated November 22, 2005. Please feel free to call me if you have any questions or would like to discuss these matters further.
Sincerely,
,Jay M. Gutie z
Attachments cc:
Christine Lipa - Chief, Branch 4, Division of Reactor Projects I -WA/253()762. 1
Institute of Suite 100 iN P O Auclear Power 700 Gafleria Parkway, SE Operations Atlanta, GA 30339-5957 770-644-8000 FAX 770-644-8549 BEFORE THE U.S. NUCLEAR REGULATORY COMMISSION AFFIDAVIT OF THE INSTITUTE OF NUCLEAR POWER OPERATIONS PURSUANT TO 10 C.F.R. § 2.390 PERSONALLY APPEARED BEFORE ME, the undersigned officer duly authorized by law to administer oaths, TERRY YOUNG, who after being sworn stated of his personal knowledge as follows:
- 1.
I am the Director of Communications for the Institute of Nuclear Power Operations ("INPO") in Atlanta, Georgia. I have held this position continuously since May 2002, although during part of this time my title was "Manager of Communications." From January 1997 to April 2002, I served as a country manager and then as the Assistant to the Chair of the World Association of Nuclear Operators
("WANO") in Atlanta, Georgia, and London, England. In all, I have nearly twenty years of personal experience in the commercial nuclear power industry.
- 2.
As Director of Communications for INPO, I have been specifically delegated by the Chief Executive Officer of INPO the function of protecting INPO information and reports from public
disclosure. I have similarly been specifically delegated the responsibility of designing and implementing procedures for ensuring that INPO information and reports are held in confidence by INPO.
Finally, I am authorized by INPO to apply on its behalf for confidential treatment of its information and reports under 10 C.F.R. § 2.390.
- 3.
I have attached to this affidavit an index of 118 documents that I understand have been produced to the Commission by FirstEnergy Nuclear Operating Company ("FENOC"). These documents are all either events analysis reports prepared by INPO, such as Significant Event Notifications ("SENs") or Significant Event Reports ("SERs"),
or e-mail messages that are directly related to INPO's events analysis cornerstone program.
- 4.
Pursuant to a long-standing Memorandum of Understanding between the Commission and INPO, the Commission has full access to INPO events analysis reports, including those produced by FENOC as listed on the attached index.
- 5.
The Commission has consistently for at least the past two decades treated INPO events analysis reports as confidential and proprietary. E.g., Critical Mass v. NRC, 975 F.2d 871 (D.C. Cir.
1992) (en banc) (affirming Commission decision to withhold INPO events analysis reports under FOIA Exemption 4), cert. denied, 507 U.S. 984 (1993). On behalf of INPO, I request that the Commission continue to treat the INPO events analysis reports listed on the attached index as confidential and proprietary.
- 6.
The e-mail messages listed on the attached index are all directly related to the INPO events analysis cornerstone program and are 2
therefore confidential and proprietary to INPO. Any public disclosure of these e-mail messages would undermine the effectiveness of the events analysis program in promoting improvements in the safe operation of nuclear plants. On behalf of INPO, I request that the Commission treat the e-mail messages listed on the attached index as confidential and proprietary to INPO.
Tfrry Youz SUBSCRIBED & SWORN TO BEFORE ME THIS Aj DAY OF FEBRUARY 2006 NOTARY PUBLIC
)
LiNDA OWENBY Notary Public, Paulding County, Georgta
-My Comnmissicl Expires May 19,2006 3
INPO DOCUMENTS FOR WHICH PROPRIETARY TREATMENT IS REQUESTED File No.
Name Document Description
'Documents produced to NRC O-
- 1.
61 E-mail between FENOC employees re: OE12980
- 2.
146 12/01 e-mails from A. Wise to A. Siemaszko re: OE13015, 0E13003, 13056
- 3.
147 SEN 220
- 4.
149 INPO memorandum re: OE 13056
- 5.
152 INPO memorandum re: OE 13480
- 6.
153 OE 13480
- 7.
155 SER 4-01
- 8.
156 OE 13919
- 9.
168 OE 13454
- 10.
169 SEN 220
- 11.
172 OE 12980
- 12.
173 SER 4-01
- 13.
176 OE 13908
- 14.
189 SEN 190
- 15.
242 03/18/02 e-mail from INPO re: Small Accumulation of Boric Acid Found on Rx Vessel Head
- 16.
243 05/18/01 e-mail from INPO re: Cracked Studs from Steam Generator Feedwater Flow Control Valves
- 17.
245 05/18/01 e-mail from INPO re: Cracked studs from Steam Generator Feedwater Flow Control Valves
- 18.
280 10/23/01 e-mail from R. Cook to D. Wuokko re: TMI Event report from NRC through INPO
- 19.
303 OE 13056
- 20.
320 SER 04-01
- 21.
346 E-mail dated 3/27/02 from J. Perez RE: CRDM Crack OE 13480
- 22.
350 04/30/02 e-mail from J. Johnson to FENOC individuals re: attached OE 13681
- 23.
354 Event 38435 report
- 24.
355 Event 38416 report
- 25.
357 OE 38416
- 26.
358 OE 38416
- 27.
359 OE 12980
- 28.
360 OE 38493
- 29.
363 E-mail forwarding OE 38383
- 30.
366 OE 13203
- 31.
368 OE 38416
- 32.
369 OE 38435
- 33.
370 OE 38493
- 34.
384 OE 13056
- 35.
386 OE 12466
- 36.
387 E-mail from R. Slyker dated 7/16/01 forwarding INPO OE 12466
- 37.
389 E-mail forwarding INPO report regarding Oconee 3 head leakage.
- 38.
391 E-mail from R. Slyker dated 11/27/01 forwarding INPO OE12980
.ile No.
Name:
Document Description (Item
)
Documents produced to NRC 01
- 39.
392 OE 12980
- 40.
394 E-mail from R. Slyker dated 11/27/01 forwarding INPO OE 13480
- 41.
396 E-mail from R. Slyker dated 3/20/02 forwarding INPO OE 13447
- 42.
398 E-mail from R. Slyker dated 3/11/02 forwarding INPO QE 13377
- 43.
400 E-mail from R. Slyker dated 3/20/02 forwarding INPO OE 13454
- 44.
404 E-mail from R. Slyker dated 7/16/01 forwarding INPO OE 12466
- 45.
407 SER 2-02
- 46.
442 SER 4-01
- 47.
467 SER 4-01
- 48.
475 SEN 220
- 49.
478 SER 04-01
- 50.
482 SER 04-01
- 51.
483 OE 12466 No.
- , File Name Document
Description:
~,I Documents produced to NRC AIT,
- 52.
- 53.
OE 2919 (1576).pdf E-mail from J. Johnson forwarding OE 2919
- 54.
OE 3464 (1577).pdf E-mail from J. Johnson forwarding OE 3464
- 55.
OE 3.568 (1578).pdf E-mail from J. Johnson forwarding OE 3568
- 56.
OE 4354 (1579).pdf E-mail from J. Johnson fornvarding OE 4354
- 57.
OE 5 403 (1652).pdf E-mail from J. Johnson forwarding OE 5403
- 58.
OE 5996 (1580).pdf E-mail from J. Johnson forvarding OE 5996
- 59.
OE 6:213 (1581).pdf E-mail from J. Johnson forwarding OE 6213
- 60.
OE 6449 (1582).pdf E-mail from J. Johnson forwarding OE 6449
- 61.
OE 6543 (1583).pdf E-mail from J. Johnson forwarding OE 6543
- 62.
OE 6583 (1584).pdf E-mail from J. Johnson forwarding OE 6583
- 63.
OE 6993 (1585).pdf E-mail from J. Johnson forwarding OE 6993
- 64.
OE 7.355 (1586).pdf E-mail from J. Johnson forwarding OE 7355
- 65.
OE 7.541 (1587).pdf E-mail from J. Johnson forwarding OE 7541
- 66.
OE 7,589 (1588).pdf E-mail from J. Johnson forwarding OE 7689
- 67.
OE 7912 (1589).pdf E-mail from J. Johnson forwarding OE 7912
- 68.
OE 8151 (1590).pdf E-mail from J. Johnson forwarding OE 7912
- 69.
_E 8256 (1591).pdf E-mail from J.
Johnson forwarding OE 8256
- 70.
OE 8965 (1592).pdf E-mail from J. Johnson forwarding OE 8965
- 71.
OE 9183 (1593).pdf E-mail from J. Johnson forwarding OE 9183
- 72.
OE 9760 (1596).pdf E-mail from J. Johnson forwarding OE 9760
- 73.
OE 9940 (1597).pdf E-mail from J. Johnson forwarding OE 9940
- 74.
OE 1)050 (1599).pdf E-mail from J. Johnson forwarding OE 10050
- 75.
OE 11)0255 (1606).pdf E-mail from J. Johnson forwarding OE 10255
- 76.
OE 10415 (1607).pdf E-mail from J. Johnson forwarding OE 10415
- 77.
- 78.
OE 10516 (1609).pdf E-mail from J. Johnson forwarding OE 10516
- 79.
OE 11)740 (1610).pdf E-mail from J. Johnson forwarding OE 10740
- 80.
OE 10741 (161 1).pdf E-mail from J. Johnson forwarding OE 10741
- 81.
OE 10992 (1612).pdf E-mail from J. Johnson forwarding OE 10992
- 82.
- 83.
- 84.
- 85.
- 86.
OE 11655 (1617).pdf E-mail from J. Johnson forwarding OE 11655
- 87.
OE 11700 (1618).pdf E-mail from J. Johnson forwarding OE 11700
- 88.
- 89.
- 90.
- 91.
OE21370 (1621).pdf OE12370 Documents produced to NRC AIT r,
I I:
1
- 92.
- 93.
- 94.
- 95.
OE 12940 (1626).pdf E-mail from J. Johnson forwarding OE 12940
- 96.
OE 13118 (1629).pdf E-mail from J. Johnson forwarding OE 13118
- 97.
- 98.
- 99.
SEN 006 (1640).pdf SEN 006 100.
SEN 018 (1641).pdf SEN 018 101.
SEN 216 (1643).pdf SEN 216 102.
SER 4-01 (1639).pdf SER4-01 103.
SER 10-89 (1600).pdf SER 10-89 104.
SER 11-0082 (1564).pdf E-mail from J. Johnson forwarding SER 11-0082 105.
SER 32-84 (1603).pdf E-mail from J. Johnson forwarding SER 32-0084 106.
SER 35-0081 (1563).pdf E-mail from J. Johnson forwarding SER 35-0081 107.
SER.46-0080 (1561).pdf E-mail from J. Johnson forwarding SER 46-0080 108.
SER 57-83 (1604).pdf SER 57-83 109.
SER 72-83 (1605).pdf SER72-83 110.
SOER 81-12 (1559).pdf A. Siemaszko (FENOC) review of SOER 81-012 111.
SOER 81-12 (1562).pdf SOER 81-12 112.
SOER 84-05 (1560).pdf SOER 84-05 113.
OE 12466 (1780).pdf E-mail from J. Johnson forwarding OE 12466 114.
OE 12980 (1783).pdf OE 12980 115.
OE 13056 (1784).pdf OE 13056 116.
SEN 006 (1787).pdf SEN 006 117.
SEN 018 (1785).pdf SEN 018 118.
SOER 81-12 (1795).pdf I SOER 81-12 1
i Il ELECTRIC POWER 1
l RESEARCH INSTITUTE AFFIDAVIT RE:
The Proprietary Information set forth on Attachment A.
][, WARREN J. BILANIN, being duly sworn, depose and state as follows:
I am a Director at the Electric Power Research Institute, Inc. ("EPRI") and I have been specifically delegated responsibility for the Proprietary Information referenced above that is sought under this Affidavit to be withheld from public disclosure (the "Proprietary Information").
I am authorized to apply to the United States Nuclear Regulatory Commission (the "NRC") for the withholding of the Proprietary Information on behalf of EPRI.
Copies of the Proprietary Information were included in documents and information previously submitted by FirstEnergy Nuclear Operating Company ("FENOC") to (i) the NRC'S Office in the matter of NRC Investigation Case No. 3-2002-006, and (ii) the NRC's Augmented Inspection Team as part of the NRC's investigation into the reactor pressure vessel head degradation at the Davis-Besse Nuclear Power Station (the "FENOC Delivered Documents").
1 am informed that the NRC has informed counsel for FENOC that it is in the process of reviewing the FENOC Delivered Documents for public release. This Affidavit is submitted to the NRC pursuant to 10 C.F.R. §2.390.
IiPRI requests that, where indicated, the FENOC Delivered Documents containing Proprietary Information set forth on Attachment A be withheld from the public on one or more of the bases set forth below:
L.
Withholding Based Upon Draft Materials.
- a.
Many of the FENOC Delivered Document constitute documents in draft form. These drafts were prepared by EPRI and/or contain EPRI proprietary information. Draft documents were circulated to the participants of the EPRI Materials Reliability Program (the "MRP"), including FENOC, for review and comment prior to preparation of the final document.
- b.
EPRI requests that the documents identified as "Draft Materials" on Attachment A be withheld from public release. Footnote 1 of 10 C.F.R. §2.390 specifically excludes draft materials from the documents which may be made available to the public.
Furthermore, because of the draft nature of the materials identified as "Draft Materials" and the potential for significant variance from the final version of such materials, it could be confusing, as well as potentially seriously misleading, to the public if this draft material were made publicly available.
~I l ELECTRIC POWER eP Ed U
RESEARCH INSTITUTE 2>.
Material Previously Afforded Confidential Treatment By The NRC.
- a.
A number of the FENOC Delivered Documents were previously submitted to the ENRC by EPRI under an appropriate affidavit requesting that such documents be withheld from public disclosure.
The documents, as well as the date of the affidavit under which the submission to the NRC was made, are identified on Attachment A hereto (the "Prior Submission Documents").
- b.
The NRC previously granted EPRI's requests that the Prior Submission Documents be withheld from the public. Accordingly, EPRI requests that the copies of the Prior Submission Document included in the FENOC Delivered Documents be afforded the treatment previously granted by the NRC and that the Prior Submission Documents be withheld from the public.
- 3.
Withholding Based Upon Privileged and Confidential Trade Secrets or Commercial or Financial Information.
- a.
The Proprietary Information is owned by ERPI and has been held in confidence by EPRI.
EPRI delivered the Proprietary Information contained in the FENOC Delivered Documents to FENOC as a participant in the MRP. As a participant in the MRP, FENOC was subject to written agreements imposing an obligation upon FENOC to maintain the confidentiality of the Proprietary Information in its possession. The Proprietary Information is disclosed only to parties who agree, in writing, to preserve the confidentiality thereof.
- b.
EPRI considers the Proprietary Information to constitute trade secrets of EPRI.
As such, EPRI holds the Proprietary Information in confidence and disclosure of the information is strictly limited to individuals and entities who have agreed, in writing, to maintain the confidentiality of the Proprietary Information. EPRI made a substantial economic investment to develop the Proprietary Information and, by prohibiting public disclosure, EPRI derives an economic benefit in the form of licensing royalties and other additional fees from the confidential nature of the Proprietary Information. If the Proprietary Information were publicly available to consultants and/or other businesses providing services in the electric and/or nuclear power industry, they would be able to use the Proprietary Information for their own commercial benefit and profit and without expending the substantial economic resources required of EPRI to develop the Proprietary Information.
- c.
EPRI's classification of the Propriety Information as trade secrets is justified by the Uniform Trade Secrets Act which California adopted in 1984 and a version of which has been adopted by over forty states.
The California Uniform Trade Secrets Act, California Civil Code §§3426 - 3426.11, defines a "trade secret" as follows:
""Trade secret" means information, including a formula, pattern, compilation, program device, method, technique, or process, that:
j'f zl l ELECTRIC POWER l RESEARCH INSTITUTE (1) Derives independent economic value, actual or potential, from not being generally known to the public or to other persons who can obtain economic value from its disclosure or use; and (2) Is the subject of efforts that are reasonable under the circumstances to maintain its secrecy."
- d.
The Proprietary Information was transmitted to the NRC by FENOC in confidence.
- e.
The Proprietary Information is not generally known or available to the public. EPRI developed the Proprietary Information only after making a determination that the Proprietary Information was not available from public sources. EPRI made a substantial investment of both money and employee hours in the development of the Proprietary Information. EPRI was required to devote these resources and effort over a period of several years to derive the Proprietary Information.
As a result of effort and cost, both in terms of dollars :pent and dedicated employee time, the Proprietary Information is highly valuable to EPRI.
- f.
A public disclosure of the Proprietary Information would be highly likely to cause substantial harm to EPRI's competitive position and the ability of EPRI to license the Proprietary Information both domestically and internationally. The Proprietary Information can only be acquired and/or duplicated by others using an equivalent investment of time and effort.
- g.
EPRI requests that the documents identified as "Proprietary Information" on Attachment A hereto be withheld from the public pursuant to C.F.R. §2.390(a)(4).
- 4.
Information Not Constituting EPRI Information.
- a.
A limited number of the FENOC Delivered Documents are not EPRI documents and do not contain EPRI Proprietary Information.
These documents have been identified as such on Attachment A. No request for withholding these documents from the public is made by EPRI.
No Request For Withholding.
- a.
A limited number of the FENOC Delivered Document are EPRI material for which no request for withholding from public view is requested. Those documents have been identified as "EPRI Document - No Request for Withholding" on the attached Attachment A.
[Remainder ofpage intentionally blank.]
4) l ELECTRIC POWER Co=
el I RESEARCH INSTITUTE
]I have read the foregoing and the matters stated therein are true and correct to the best of my knowledge, information and belief. I make this affidavit under penalty of perjury under the laws of the United States of America and under the laws of the State of California.
Executed this 7 th day of March, 2006 at 3420 Hillview Avenue, Palo Alto, California, being the premises and place of business of the Electric Power Research Institute.
Warren J. Bilanin
Ir State of California County of Santa Clara I SS.
Subscribed and sworn to (or affirmed) before me on March 7, 2006 by Warren J. Bilanin, personally known to me.
WITNESS my hand and official seal.
WT s
WFlM 2OO N155 8041 VOAR PUBcIClCALIFORI fl20oe4
=
Attachment A to Affidavit of Warren 3. Bilanin File Document i;-L -.
¶ f W:t-aoliing Name Bates Label Doc menteDescpion msents.
t--
C Re esed Materials Reliability Program (MRP) Recommended Crack This document constitutes S14A-00744 --
Growth Rates for Evaluating Primary Water Stress Corrosion
. l draft materials and, as such, S14A-00759 Cracking (PWSCC) of Alloy 600 (MRP-055), Draft dated October should not be released to the 19, 2001
_ublic.
Materials Reliability Program (MRP) Recommended Crack This document constitutes S14A-00857 Growth Rates for Evaluating Primary Water Stress Corrosion draft materials and, as such, S14A-008572 --
Cracking (PWSCC) of Alloy 600 CRDM Nozzle Material (MRP-Draft Materials draft beriased to the 055) Part 1: B&W Tubular Products Heats, Draft dated should not be released to the November 4, 2001 public.
S14S-00873 Memorandum of Call Not an EPRI Document. Does not contain EPRI Proprietary Information.
23 S14A-00874 Handwritten Notes Not an EPRI Document. Does not contain EPRI Proprietary Information.
Materials Reliability Program (MRP) Recommended Crack This document constitutes S14A-00875 --
Growth Rates for Evaluating Primary Water Stress Corrosion Draft Materials. Hand written notes are not EPRI draft materials and, as such, S14A-00890 Cracking (PWSCC) of Alloy 600 (MRP-055), Draft dated October information should not be released to the 19, 2001. Marked with handwritten notes.
public.
Email correspondence transmitting U.S. Nudear Regulatory Commission Preliminary Staff Technical Assessment For withholding requested for S14A-00891 --
Pressurized Water Reactor Vessel Head Penetration Nozzles Document Nos. S14A-00892 - S14A-00915 contain EPRI Document Nos. S14A-00892 --
S14A-00915 Associated with NRC Bulletin 2001-01, 'Circumferential Proprietary Information S14A-00915 Cracking of Reactor Pressure Vessel Head Penetration Nozzles",
Idated November 2001 I of 29
Attachment A to Affidavit of Warren 3. Bilanin File JDocument
-c'.:..-t
'Name,.Bates LabelDcmn ecl lnCm et Rte'us I
Ne aWth hld l -
-qDoumen:D lpton
- Comment-ueted f o S14A-02749 --
Email correspondence transmitting NRC Technical Basis Document Nos. S14A-02753 - S14A-02756 contain EPRI Withholding requested for S14A-02756 Equations Proprietary Information S14A-02756 Email dated August 2, 2001 transmitting correspondence dated July 31, 2001 from Nudear Energy Institute to NRC regarding data on U.S. PWR plants, a relative ranking of effective full power years of operation and RPV head temperature S14A-02760 -- S14A-02767 - Document submitted to NRC Document Nos. S14A-02760 --
S14A-02757 --
information and enclosing Table regarding Key Plant pursuant to an Affidavit of Robin L Jones dated July 31, S14A-02767 are subject to a S14A-0277 Parameters for PWR Reactor Vessel Head Nozzle PWSCC pursunti to a t of RobinL oe dated July 31, preAious a
ir subjet Assessments (July 2001). Endosed correspondence dated July 2001 requesting that the document be withheld from the previous withholding request 31, 2001 from EPRI to NRC regarding confidential treatment of public.
which was granted.
Table 1: Key Plant Parameters for PWR Reactor Vessel Head Nozzle PWSCC Assessments (July 2001) endosing Affidavit dated July 31, 2001 S14A-02771 Handwritten Notes Not an EPRI Document. Does not contain EPRI Proprietary 25 Information.
Nudear Energy Institute correspondence to NRC dated June 29, 2001 transmitting Response to NRC Review Comments Transmitted by Letter Dated June 22, 2001 to the Nudear S14A-02775 -- S14A-02825 - Document submitted to NRC Document Nos. S14A-02775 -
S14A-02772 --
Energy Institute Relating to PWR Materials Reliability Program pursuant to an Affidavit of Theodore U. Marston dated S14A-02825 are subject to a S14A-02825 Interim Alloy 600 Safety Assessment for US PWR Plants (MRP-September 27, 2001 requesting that the document be previous withholding request
- 44) Part 2: Reactor Vessel Top Head Penetrations EPRI TP-withheld from the public.
which was granted.
1001491, Part 2, May 2001, MRP 2001-050, dated June 29, 2001 PWR Materials Reliability Project Interim Alloy 600 Safety Document submitted to NRC pursuant to an Affidavit of Document Nos. 514A-02826 --
S14A-02826 --
Assessments for US PWR Plants (MRP-44), Part 2: Reactor do ent Msubmi tedt N an to an Affidavt of 514A-02893 subject to a 514A-02893 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim Theodore U. Marston dated May 7, 2001 requesting that the previous withholding request docmenobewithedafom he0ublcwhich was granted.
Docmen sumited o NC ursantto n Afidvitof Document Nos. S14A-02894 514A-02894 --
Table re Key Plant Parameters for PWR Reactor Vessel Head Document submitted JouNRC pu2001 requesatng that the S14A-02895 subject to a S14A-02895 Nozzle PWSCC Assessments (July 2001) dated July 31, 2001 RobinL Je dated J r
i the previous withholding request document be withheld from the public.
which was granted.
,5//4bZYS7 2 of 29
Attachment A to Affidavit of Wanren J. Bilanin file..Documentr v
z A
^,)<'.
X,>>'-
'-'t' wi-4 E
it W ~~i_ h' i n' Name ; Bates Label' Document De lptIdh i.mmenW i
eguented S14A-00190 -- S14A-00193 -- Handwritten notes are not an 514A-00194 is a draft S14A-00190 --
Notes re: MRP-055; draft version of Figure 5: Comparison of EPRI Document.
document and, as such, 26 S14A-00194 MRP Recommended Crack Growth Curve for Alloy 600 with the should not be released to the Modified Scott Curve [2] at 3250 (6171F)
S14A-00194 -- Draft material containing EPRI proprietary public information.
S14A-00940 --
The B&W Owners Group Materials Committee Long-Range Not an EPRI Document. Does not contain EPRI Proprietary S14A-00974 Planning Document (Revision 2) dated May 1999 Information.
EPRI Proprietary Information. This document contains Withholding requested for the financial Information which constitutes EPRI Proprietary Financial information 514A-01054 MRP Funding Summary 1999-2002 Information.
contained in Document No.
Handwritten notes are not an EPRI product.
514A-01054 Withholding requested for the Document Nos. S14A-01062; 514A-01064 - S14A-01068; financial information S14A-01059 --
Materials Reliability Program, MRP Senior Representatives 514A-01070 - S14A-01074 contain EPRI Proprietary contained in Document Nos.
S14A-01074 Meeting, Naples, Florida, August 10, 2001, Slides Presentation Information. These documents contain financial information 514A-01062; S14A-01064 -
which constitutes EPRI Proprietary Information.
S14A-01074 Document Nos. 514A-01140 - S14A-01143 contain EPRI Withholding requested for the S14A0118 Meoradumtranmiting inues f MR Seiorfinancial information 28 514A-01148 Representatives Meeting h eld on March 9, 2001 Proprietary Information. These documents contain financialontained i DocuentNos 514-0148 eprsetatvesMeeinghed o Mach, 201information which consttutes EPRI Proprietary Information. contained4 in1Doumen1Nos S14A-01793 --
B&W Owners Group Executive Committee Meeting, June 6, Not an EPRI Document. Does not contain EPRI Proprietary S14A-01876 2001, Lynchberg, VA Materials Information.
S1IA-01878 B&WOG Successes Not an EPRI Document. Does not contain EPRI Proprietary Information.
S14A-01880 --
Framatome ANP CRDM Nozzle ID Temper Bead Repair Not an EPRI Document. Does not contain EPRI Proprietary 514A-01925 Presentation Information.
514A-01927 --
Framatome ANP Update on OTSG Technical Concems Not an EPRI Document. Does not contain EPRI Proprietary S14A-01943 Information.
514A-01946 B&W Plant Outage Performance Improvements Notan EP.RI Document. Does not contain EPRI Proprietary S14A-01954
&WPatOtgPefracImovensInformation.____________
S14A-01955 --
Email dated June 22, 2001 transmitting memorandum to B&W Not an EPRI Document. Does not contain EPRI Proprietary S14A-01966 -- Owners Group Executive Committee with Meeting Minutes of Not an D
514A-01966 the June 6, 2001 Executive Committee Meeting Informaton.
30 f29
Attachment A to Affidavit of Warren J. Bilanin File Document:.
-A9t-On.W-U)-.Old Name Bates Label Doc.-e*
D e n t o
con N
met
-ited EPRI Proprietary Information. This document contains Withholding requested for the 514A-02033 SGMP 2002 Budget information financial information which constitutes EPRI Proprietary finanaal informabton Inforabon.contained in Doc~ument N~o.
Information.
S14A-02033 Withholding requested for the Document Nos. S14A-02037 -S14A-02038, S14A-02043 -
financial information S14A-02034 --
Materials Reliability Program, MRP PMMPSC Meeng, 514A-02044, S14A-02047, S14A-02050 - 514A-02051 contained in Document Nos.
514A-02051 Albuquerque, NM, Maroh 6, 2002 materials contain EPRI Proprietary Information. These documents S14A-02037 - S14A-02038, contain financial information which constitutes EPRI S14A-02043 - S14A-02044, Proprietary Information.
S14A-02051 514A-02258 --
MRP Alloy 600/82/182/ITG Status Report, PMMP Steering Document No. S14A-02259 contains EPRI Proprietary Withholding requested for the S14A0228 MP Aloy60082/82/TG tats Rpor, PMP teeing Information. This document contains financial information financial information S14A-02269 Committee Meeting, March 6, 2002 materials whih constitutes EPRI Proprietary Informaon.ontained in Document No.
whic costittesEPR ProriearyInfomaton.S14A-02259 514A-02270 --
Materials Reliability Program (MRP), Senior Representatives Does not contain proprietary information. No withholding S14A-02287 Meeting, August 10, 2001, Naples, Florida materials requested.
Document Nos. S14A-02291, 514A-02293 -- S14A-02303 Withholding requested for the S14A-00288 --
Materials Reliability Program, MRP Senior Representatives contain EPRI Proprietary Information. These documents financial information 28 S14A-02303 Meeting, Naples, FL, August 10, 2001 materials contain financial information which constitutes EPRI 514A-02291, S14A-02293 Ns Proprietary Information.
S14A-02303 Document No. S14A-02319 contains EPRI Proprietary Withholding requested for the S14A-02304 --
MRP Fatigue ITG Status Report, MRP Senior Reps Meeting, IfrainThsdcm tcoansiacalnomton financial information 514A-02319 August 10, 2001, Naples, FL materials which coonstittes EPRIdont cotains finanPral rnformatoon contained in Document No.
514Ai02330 constit Augut 10,2les FL Pprietary I rman S 14A-02319 Document No. S14A-02330 contains EPRI Proprietary Withholding requested for the S14A-032346 --
MRP TedhnicalSupport SubcPogammitatu, MS Information. This document contains financial information financial information S14A-02330 Reps Meeting, August 10, 2001, Naples, FL materials which constitutes EPRI Proprietary Information, contained in Document No.
S14A-02330 DocuentNo.S14-0245 ontans PRIProrieary Withholding requested for the S14A-02331 -
Reactor InternalsIJOBB Issue Task Group, PWR MRP Senior Dnomto.Ti ocument N.54-24 contains EPinaca Pr foprietary financial information S14A-02345 Representatives Meeting, August 10, 2001, Naples, Florida IfrainThsdcm tcoansiacalnomton contained in Document No.
which constitutes EPRI Proprietary Information.
S14A-02345 Document Nos. S14A-02355, S14A-02359 -- S14A-02360 Withholding requested for the S14A-02346 --
MRP Technical Support Subcommittee, MRP Senior contain EPRI Proprietary Information. These documents financial information S14A-02361 Representatives Meeting, Naples, Florida, August 10, 2001 contain financial information which constitutes EPRI contained in Document Nos.
Proprietary Information.
S14-035 14-035 ii e4-A 4 of 29
Attachment A to Affidavit of Warren J. Bilanin
.ite i-vocument T89.uunI in9 Name Bates Label Document Desci ption
^
- omment&
-1' lReqbesd**
S14A-02362 --
q1 4A-nlT177 ANO-1 CRDM Nozzle 56 Inspection and Repair, August 10, 2001 meetinn materials Not an EPRI Document. Does not contain EPRI Proprietary Tnfnrmatinn.
S14A-023787-MRP Products/Deliverables materials Does not contain proprietary information. No withholding S14A-02387 requested.
Not an EPRI Document. Does not contain EPRI Proprietary S14A-02388 Meeting Notice Ifrain Information.
S14A-02389 --
Memorandum transmitting minutes of MRP Senior EPRI Document - No withholding requested.
S14A-02392 Representatives Meeting held on March 11, 1999
.Withholding requested for the S14A-02393 --
Memorandum dated January 12, 1999 regarding summary of Document No.Ths4A-02393 contains EPRI P roprietary financial information S14A-02396 1998 MRP activities Information. This document contains financial information contained in Document No.
which constitutes EPRI Proprietary Information.
S14A-02393 Withholding requested for the
.0 Correspondence dated September 29, 1998 from First Energy EPRI Proprietary Information. These documents contain commercial and financial S14A-02397 --
trandeng Septeme 29, Agroment commercial and financial information that constitute EPRI information contained in 514A-02399 to EPRI transmitting Collaborative Funding Agreement PoreayIfrain ouetNs 1A039-Proprietary Informabion.
Document Nos. S14A-02399 --
S14A-02399 Withholding requested for the EPRI Proprietary Information. These documents contain commercial and financial S14A-02400 --
Correspondence dated October 22, 1998 from EPRI to First commercial and financial information that constitutes EPRI information contained in S14A-02463 Energy transmitting executed Collaborative Funding Agreement Proprietary Information.
Document Nos. S14A-02401 Propietry nfomatonand S14A-02403 -- S14A-02463 Withholding requested for the EPRI Proprietary Information. These documents contain commercial and financial S14A-02528 --
Muteile ResPonenc FrmPin tomirtmene commercial and financial information that constitutes EPRI information contained in 514A-02528 Materials Reliability Project Funding CommitmentProprietary Information.
Document Nos. S14A-02465 --
5S14A-02528 28 S14A-02573 --
S14A-02745 Memorandum dated October 5, 2001 transmitting minutes of MRP Senior Representative meeting held on August 10, 2001 in Naples, Florida induding presentation materials Document Nos. S14A-02590, S14A-02592 - S14A-02603, S14A-02619, S14A-02665, S14A-02680, S14A-02682 - S14A-02683, S14A-02700 - S14A-02701, S14A-02704, S14A-02707, S14A-02714, S14A-02731, S14A-02734 contain EPRI Proprietary Information. These documents contain financial information which constitutes EPRI Proprietary Information.
Withholding requested for the financial information contained in Document Nos.
S14A-02603, S14A-02619, S14A-02665, S14A-02680, S14A-02682 - S14A-02683, S14A-02700 - S14A-02701, S14A-02704, S14A-02707, S14A-02714, S14A-02731, S14A-02734 5 of 29
Attachment A to Affidavit of Waffen 3. Bilanin File
-Document*^
Vf
.. oI
- thbblding r Name Bates Label Document pDon
___A:___Morgue________A Document Nos. S14A-03555 -
S14A-03551 --
Multiple emails regarding Position Paper, RPV Penetration Head Document Nos. S14A-03555 -S14A-03557; S14A-03560-S14A-03557; S14A-03560-S14A-03562 Cracking, September 2001 S14A-03562 - Draft Materials.
S14A-03562 are draft not be released to the public S14A-03563 - S14A-03564 - Not an EPRI document.
Document Nos. S14A-03565 -
S14A-03563 Penetration Craming tssuegrdingRRePa tor Vessel Head S14A-03565 - S14A-03567 - Draft Materials. Handwritten S14A-03567 are draft S14A-03582 Spebr-Otbr20noenoanERpodc.materials and, as such, should 30September
- October 2001 S14A-03568 - S14A-03582 - Not an EPRI document.
not be released to the public Correspondence dated July 31, 2001 from Nuclear Energy S14A-03630 -- S14A-03633 - Document submitted to NRC Document Nos. S14A-03630 --
S14A-03629 --
Institute to NRC transmitting table entitled "Key Plant pursuant to an Affidavit of Robin L Jones dated July 31, 514A-03633 subject to a S14A-03633 Parametler for PWR Reactor Vessel ilead Nozzle PWVSCC 2001 requesting that the document be withheld from the previous withholding request Assessments (July 2001)" dated July 31, 2001 public.
which was granted.
Document Nos. S14A-03639 -
S14A-03637 --
Email transmitting draft Position Paper, RPV Penetration Head Nos. S14A-03639 - S14A-03641 - Draft Materials S14A-03641 are draft S14A-03641 Cracking, September 2001 D~etmaterials and, as such, should not be released to the public.
Email dated November 13, 2001 EPRI to distribution re: MRP's 514G-00895 -
proposed section of Staff's Technical Assessment of VHP Nozzle S14G-008971 Cracking and transmitting U. S. Nuclear Regulatory Commission S4089--S14G-00923 Preliminary Staff Technical Withholding requested for 37 141-00899-Preliminary Staff Technical Assessment for Pressurized Water Assess00899 cotiigEIPoreay nomto Document Nos. S1463-00899 -.
S14G-0092 Reactor Vessel Head Penetration Nozzles Associated with NRC ining EPR ptr Inforaon S14-00923 Bulletin 2001-01, "Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles" dated November 2001 6 of 29
Attachment A to Affidavit of Warren 3. Bilanin File
.*Doumet 7
X 7V W
.7
(
SA onJWIthh'oldin9 Name Batesibel A d 7 Dowielthiff p n toA'men-
- eque id Correspondence dated August 21, 2001 from the Nudear S14G-00925 Energy Institute to the NRC transmitting PWR Materials Not an EPRI document. Does not contain EPRI Proprietary Reliability Program Response to NRC Bulletin 2001-01 (MRP-Information.
___ 48), EPRI Report No. 1006284, Final Report dated August 2001 4,'
S14G-00926 -- S14G-00965 EPRI Report Submitted to Document Nos. S14G-00926 -
S14G-00926 --
PWR Materials Reliability Program Response to NRC Bulletin Submitted to NRC pursuant to an Affidavit of Theodore U. S146-00965 subject to a S14G-00965 2001-01 (MRP-48), EPRI Report No. 1006284, Final Report Marston dated August 17, 2001 requesting that the previous withholding request document be withheld from the public.
which was granted.
PWR Materials Reliability Program Response to NRC Bulletin Document Nos. S14H-09428 -
S14H-09428 --
2001-01 (MRP-48), TP-1006284, marked Final Draft Before Draft Materials S14H-09464 are draft S14H-09464 Submittal to NRC on Tuesday, August 21, 2001, dated August materials and, as such, should 19, 2001 not be released to the public.
Correspondence dated July 31, 2001 from Nudear Energy 38 Institute to NRC transmitting table entitled "Key Plant Parameters for PWR Reactor Vessel Head Nozzle PWSCC S14H-09467 -- S14H-09474 EPRI Report Submitted to Document Nos. S14H-09467 -
S14H-09466 -- Assessments (Juiy 2001)" dated July 31, 2001; correspondence Submitted to NRC pursuant to an Affidavit of Robin L. Jones 14H--09474 subject to a S14H-09477 dated July 31, 2001 from EPRI to the NRC and Affidavit of dated July 31, 2001 requesting that the document be previous withholding request Robin L. Jones dated July 31, 2001 seeking withholding of table withheld from the public.
which was granted.
entitied "Key Plant Parameters for PWR Reactor Vessel Head Nozzle PWSCC Assessments (July 2001)" dated July 31, 2001 Correspondence dated August 21, 2001 from the Nudear S14H-09535 -- 514H-09573 EPRI Report Submitted to Document Nos. 514H-09535 -
514H-09534 --
Energy Institute to the NRC transmitting PWR Materials Submitted to NRC pursuant to an Affidavit of Theodore U.
514H-09573 subject to a S14H09573 Reliability Program Response to NRC Bulletin 2001-01 (MRP-Marsten dated August 17, 2001 requesting that the previous withholding request 48), EPRI Report No. 1006284, Final Report dated August 2001 document be withheld from the public.
which was granted.
PWR Materials Reliability Program Response to NRC Bulletin Document Nos. 514H-11215 -
S14H-11215 --
2001-01 (MRP-48), TP-1006284, marked Final Draft Before Draft Materials S14H-11251 are draft S14H-11251 Submittal to NRC on Tuesday, August 21, 2001, dated August materials and as such, should 19, 2001 not be released to the public.
S14G-00419 -- S14G0020 and S14G-00424 - S14G-0056 Withholding requested for the 48 S146-00416 --
Email dated November 17, 2001 from EPRI to Distribution with contain EPRI proprietary financial Information. These conanea informati N
S1413-00456 Alloy 600 Level II Task Descripbions documents contain financial informaffon which constitutes S14Gtained -- S14Gmet0020 EPRI Proprietary Information.
and S14G-00424-S14G-0056 7 of 29
Attachment A to Affidavit of Warren J. Bilanin
^Filei
- Document,
.r-egi X
iName B-iates Lab~el D~ocum~entDiizjt6
_______________air,___
5S14G-00708 --
Multiple emails re Crack Growth Rates with attached EPRI email correspondence. Attachment is not an LPRI 514G00719 assessment of PWSCC Crack Growth Rates document and does not contain Proprietary Information.
This document constitutes S14H-00626 --
Position Paper, RPV Penetration Head Cracking, September Draft Materials draft materials and as such, S14H-00628 2001 should not be released to the public.
57 S14H-00629 --
Materials Reliability Program (MRP) Recommended Crack This document constitutes S1411-00639; Growth Rates For Evaluating Primary Water Stress Corrosion draft materials and as such, S14H-0062940; Cracking (PWSCC) of Alloy 600 CRDM Nozzle Material (MRP-Draft Materials should not be released to the S14H-00641 --
055), Part 1: B&W Tubular Product Heats, marked Draft, dated pulc.
S14H-00644 November 4, 2001 public.
Correspondence dated August 21, 2001 from the Nuclear Energy Institute to the NRC regarding PWR Materials Reliability S1411-00714 Program Response to NRC Bulletin 2001-01 (MRP-48), EPRI Not an EPRI document. No withholding requested.
Report No. 1006284, Final Report dated August 2001 - no enclosures PWR Materials Reliability Program Response to NRC Bulletin This document constitutes S141-1-00715 2001-01 (MRP-48), TP-1006284, marked Final Draft Before Draft Materials draft materials and as such, S14H-00754 Submittal to NRC on Tuesday, August 21, 2001, dated August should not be released to the 59 19, 2001 public.
Correspondence dated June 29, 2001 from Nuclear Energy Institute to NRC transmitting Response to NRC Review Comments Transmitted by Letter dated June 22, 2001 to the S14H-00757 - S141-1-00803 EPRI Report submitted to NRC Document Nos. S1411-00757 -
S14H-00755 --
Nuclear Energy Institute Relating to PWR Materials Reliability pursuant to an Affidavit of Theodore U. Marston dated S14H-00803 are subject to a S1411-00803 Program Interim Alloy 600 Safety Assessment for US PWR September 27, 2001 requesting that the document be previous withholding request Plants (MRP-44), Part 2: Reactor Vessel Top Heads withheld from the public which was granted Penetrations EPRI TP-100149 (Part 2, May 2001) MRP 2001-050, Dated June 29, 2001 8 of 29
Attachment A to Affidavit of Wan-en J. Bilanin File
-Document.
.A.
AC 1 Withholding Name Bate Abel
-: DocumentDesc ption:
omment
- i.
iqusted Memorandum dated July 6, 2001 from Nudear Energy Institute S14H-00804 -- to NEI Administrative Points of Contract regarding NRC Not an EPRI document. Does not contain EPRI Proprietary 514H-00805 Proposed Generic Communications on Alloy 600 Reactor Head Information.
Penetrators 59 Nudear Regulatory Commission Memorandum dated July 20, Not an EPRI document. Does not contain Proprietary S14H-00806 1001 regarding Forthcoming Meeting with Nudear Energy Informabon.
Institute and Operating Pressurized Water Reactor Ucensee n
514H-00807 --
MRP - Alloy 600 ITG RPV Penetrations Presentation to ACRS Does not contain Proprietary Information.
S14H-00845 Subcommittees dated July 10. 2001 PWR Materials Reliability Program Interim Alloy 600 Safety EPRI Report submitted to N Document Nos. 514H-09575 -
514H-09575 --
Assessments for US PWR Plants (MRP-44), Part 2: Reactor Theodore U. Marston dated RC pu7rsant to an Affidavit of S14H-09634 subject to a 514H-09634 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim document be withheld from the public.
previous withholding request
[Report, May 2001 1 dcmnlewihedfotepui.jwhich was granted.
PWR Materials Reliability Program Interim Alloy 600 Safety EPRI Report Submitted to Submitted to NRC pursuant to an Document Nos. 514P-02103 --
S14P-02103 --
Assessments for US PWR Plants (MRP-44), Part 2: Reactor EPRi Rep ort Sbmited ton Sm ted to NR p uto 514P-02168 subject to a 514P-02168 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim Affidavit of Theodore U. Marston dated May 7 h
2001 previous withholding request Reor, ay201requesting that the document be withheld from the public, preiou ws wiathhodin.eus Correspondence dated May 18, 2001 from Nudear Energy Institute to the NRC transmitting (i) correspondence dated May 63 7, 2001 from EPRI to the NRC with an Affidavit of even date requesting withholding of PWR Materials Reliability Program Interim Alloy 600 Safety Assessments for US PWR Plants (MRP-514P-02303 -- 514P-02515 -- EPRI Report submitted to NRC Document Nos. 514P-02303 --
514P-02294 --
44), Part 2: Reactor Vessel Top Head Penetrations, TP-pursuant to an Affidavit of Theodore U. Marston dated May 514P-02515 subject to a 514P-02515 1001491, Part 2, Interim Report, May 2001, (ii) Response to 7, 2001 requesting that the document be withheld from the previous withholding request NRC Question 2, (iii) Preliminary Agenda - Industry Workshop public.
which was granted.
on MRP Ally 600 Issue Task Group, June 3-14, 2001, (iv)
Electronic Registration Form, (v) PWR Materials Reliability Program Interim Alloy 600 Safety Assessments for US PWR Plants (MRP-44), Part 2: Reactor Vessel Top Head Penetrations, tp-1001491, Interim Report, May 2001 9 of 29
Attachment A to Affidavit of Wan-en 3. Bilanin File Document
-- in*-
A-i;;
ig Name Bates Label Doc ent Des t on -
omme tn.
< i g
d Email dated July 3, 2001 from G. White (Dominion Engineering) re: MRP Response to NRC Comments on Interim Safety Assessment for RPV Head Nozzles transmitting copy of correspondence dated June 29, 2001 from Nuclear Energy S4-96 1H067-PIRpr umte oNCDcmn o.S4-96 S14H-09657 -- Institute to the NRC with enclosure entitled Response to NRC pursuant to an Affidavit of7 ThEPR Repot su bmit ed o NRC S1H-0 6 subjec to S14H-09697 to the NuCear Energy Institute Relating to PWR Materials September 27, 2001 requesting that the documents be previous withholding request Reliability Program, Interim Alloy 600 Safety Assessment for UR withheld from the public, which was granted.
PWR Plants (MRP-44), Part 2: Reactor Vessel Top Head Penetrations, EPRI TP-1001491, Part 2, May 2001, MRP 2001-050, June 29, 2001 66 Materials Reliability Program (MRP) Recommended Crack This document constitutes S14H-09699 --
Growth Rates for Evaluating Primary Water Stress Corrosion draft materials and as such, S14H 09714 -- Cracking (PWSCC) of Alloy 600 CRDM Nozzle Material (MRP-Draft Materials shul noterased to the 055), Part 1: B&W Tubular Products Heats, marked Draft, should not be released to the dated November 4, 2001 pubic.
PWR Materials Reliability Program Interim Alloy 600 Safety S14H-09716 -- 51411-09775 - EPRI Report submitted to Document Nos. 514H-09716 --
S14H-09716 -- Assessments for US PWR Plants (MRP-44), Part 2: Reactor NRC pursuant to an Affidavit of Theodore U. Marston dated S1411-09775 subject to a S14H-09775 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim May 7, 2001 requesting that the documents be withheld previous withholding request Report, May 2001 from the public.
which was granted Materials Reliability Program (MRP) Recommended Crack This document constitutes 514H-09777 -- Growth Rates for Evaluating Primary Water Stress Corrosion D ft M draft materials and as such, 514H-09792 Cracking (PWSCC) of Alloy 600 (MRP-055), marked Draft, dated should not be released to the October 19. 2001 public.
10 of 29
Attachment A to Affidavit of Wan-en 3. B1lanin
- Filet N.ea
-Document
+ng..
I Aha
.'.^."-'.'Document Descripton Cmment ZjAtofihodn I -
I^
i:-
arm::
'I I 6 t f > :-*4 e
-t I
w Y
S14H--09953 --
S14H-10022 Correspondence dated May 18, 2001 from Nudear Energy Institute to the NRC transmitting (i) correspondence dated May 7, 2001 from EPRI to the NRC with an Affidavit of even date requesting withholding of PWR Materials Reliability Program Interim Alloy 600 Safety Assessments for US PWR Plants (MRP-44), Part 2: Reactor Vessel Top Head Penetrations, TP-1001491, Part 2, Interim Report, May 2001, (ii) Response to NRC Question 2, (iii) Preliminary Agenda - Industry Workshop on MRP Ally 600 Issue Task Group, June 3-14, 2001, (iv)
Electronic Registration Form, (v) PWR Materials Reliability Program Interim Alloy 600 Safety Assessments for US PWR Plants (MRP-44), Part 2: Reactor Vessel Top Head Penetrations, tp-1001491, Interim Report, May 2001 S14H-09962 -- S14H-10022 -- EPRI Report submitted to NRC pursuant to an Affidavit of Theodore U. Marston dated May 7, 2001 requesting that the document be withheld from the public.
Document Nos. S14H-009962
-S14H-10022 subject to a previous withholding request which was granted 71 PWR Materials Reliability Program Response to NRC Bulletin 2001-01 (MRP-48), August 2001, marked Draft, with addendum This document constitutes S14H 10024 --
entitled Alternate Inspection Proposal for Moderately Draft Materials d matereleand as th, S14H-10094 Susceptible Plants With Restrictive Insulation Configurations to should not be released to the Submit in RPesponse to NRC Bulletin 2001-01, marked DRAFT public.
This document constitutes S14H-10095 --
Visual Examination For Leakage of Reactor Head Penetrations Draft Materials draft materials and as such, S14H-10098 on Top of Head, Version: 8/10/2001, marked Draft should not be released to the
_p public.
PWR Materials Reliability Program Response to NRC Bulletin This document constitutes S14H-10100 --
2001-01 (MRP-48), TP-1006284, marked Final Draft Before Draft Materials draft materials and as such, S14H-10136 Submittal to NRC on Tuesday, August 21, 2001, dated August should not be released to the 19, 2001 public.
PWR Materials Reliability Program Response to NRC Bulletin This document constitutes S14H-10139 --
2001-01 (MRP-48), August 2001, marked Draft, with addendum draft materials and as such, S14H-10233 --
entitled Alternate Inspection Proposal for Moderately Draft Materials draft beriased to the S14H-10233 Susceptible Plants With Restrictive Insulation Configurations to should not be released to the Submit in Response to NRC Bulletin 2001-01, marked DRAFT This document constitutes S14H-10224 --
Visual Examination For Leakage of Reactor Head Penetrations draft materials and as such, S14H-10227 on Top of Head, Version: 8/10/2001, marked Draft Draft Materials should not be released to the public.
S14H--10229 S141--10265 PWR Materials Reliability Program Response to NRC Bulletin 2001-01 (MRP-48), TP-1006284, marked Final Draft Before Submittal to NRC on Tuesday, August 21, 2001, dated August 119. 2001 Draft Materials This document constitutes draft materials and as such, should not be released to the I pDulIC.
11 of 29
Attachment A to Affidavit of Warren 3. Bilanin File EDocument l
.2 7:>>
, iiyt l
I;5-*i;..$
~ lflJ nWlthtoldlng
.Name Bate. Labei Document e
Comment
-I <Re ueste -
Correspondence dated May 18, 2001 from Nudear Energy Institute to the NRC transmitting (i) correspondence dated May 7, 2001 from EPRI to the NRC with an Affidavit of even date requesting withholding of PWR Materials Reliability Program Interim Alloy 600 Safety Assessments for US PWR Plants (MRP-S14H-10276-- S14H-10343 -- EPRI Report submitted to Document Nos. S14H-10276 -
S14H1-10267 --
44), Part 2: Reactor Vessel Top H-ead Penetrations, TP NRC pursuant to an Affidavit of Theodore U. Marston dated S14H1-10343 subject to a 72 S14H10343 1001491, Part 2, Interim Report, May 2001, (ii) Response to May 7, 2001 requesting that the document be withheld from previous withholding request NRC Question 2, (iii) Preliminary Agenda - Industry Workshop the public, which was granted on MRP Ally 600 Issue Task Group, June 3-14, 2001, (iv)
Electronic Registration Form, (v) PWR Materials Reliability Program Interim Alloy 600 Safety Assessments for US PWR Plants (MRP-44), Part 2: Reactor Vessel Top Head Penetrations, tp-1001491, Interim Report May 2001 S14H-10365 -- S14H-10385 - EPRI Report submitted to Document Nos. S14H-10365--
Exhibits to PWR Materials Reliability Program Interim Ailoy 600 NRC pursuant to an Affidavit of Theodore U. M3.0n da".'
S14H-10385 subject to a S14H-10365 --
Safety Assessments for US PWR Plants (MRP-44)
May 7, 2001 requesting that the document be withheld from previous withholding request S14H-10385 the public.
which was granted Email dated November 5, 2001 transmitting Materials Reliability Document Nos.S14H - 10389 -
S14H-10387 --
Program (MRP) Recommended Crack Growth Rates for
-S14H-lD404 constitute draft S14H-10404 Evaluating Primary Water Stress Corrosion Cracking (PWSCC)
S14H - 10389 -- S14H-10404 - Draft Materials materials and as such, should of Alloy 600 CRDM Nozzle Material (MRP-55), Part 1: Tubular not be released to the public.
Products Heats, marked Draft, dated November 4, 2001 PWR Materials Reliability Program Interim Alloy 600 Safety EPIRpr umte oNCprun oa fiai f Document Nos. S14H1-10406--
73 Assessments for US PWR Plants (MRP-44), Part 2: Reactor fedEPRI Report submitted t Mo NCy 7p 200a reqt a
n that ohe S14H-10471 subject to a S14H-10406 --
Vessel Top Head Penetrations, TP-1001491, Part 2, Interim document be withheld from 7he public.
previous withholding request S141-1-10471 Report, May 2001 dcmnbewthlfrmhepli.which was granted Correspondence dated August 21, 2001 from the Nudear S14H-10474 -- S14H-10513 EPRI Report submitted to NRC Document Nos. S14H-10474--
Energy Institute to the NRC transmitting PWR Materials pursuant to an Affidavit of Theodore U. Marston dated S14H-10513 subject to a 514H-10473 --
Reliability Program Response to NRC Bulletin 2001-01 (MRP-August 17, 2001 requesting that the document be withheld previous withholding request S1411-10513 48), 1006284, Final Report, August 2001 from the public.
which was granted Correspondence dated August 21, 2001 from the Nuclear S14H-10557 -- S14H-10597 EPRI Report submitted to NRC Document Nos. S14H-10557--
Energy Institute to the NRC transmitting PWR Materials pursuant to an Affidavit of Theodore U. Marston dated S14H-10597 subject to 514H-10556 --
Reliability Program Response to NRC Bulletin 2001-01 (MRP-August 17, 2001 requesting that the document be withheld previous withholding request S14H-10597 48), 1006284. Final Reoort, August 2001 from the public.
which was granted 12 of 29
Attachment A to Affidavit of Wanen 3. Blanin File
-,Document.*
.equs°eDl "Name. Bate's Label Do u e t es rP otoiv<_
Correspondence dated July 31, 2001 from Nudear Energy Institute to NRC transmitting table entitled "Key Plant S14H-10689 - S14H-10696 EPRI Report submitted to NRC Document Nos. 514H-10689 -
S14H-10688 --
Parameters for PWR Reactor Vessel Head Nozzle PWSCC pursuant to an Affidavit of Robin L Jones dated July 31, S14H-10696 subject to a S14H-10699 Assessments (July 2001)" dated July 31, 2001; Correspondence 2001 requesting that the documents be withheld from the previous withholding request dated July 31, 2001 from EPRI to the NRC transmitting an public which was granted Affidavit of even date requesting withholding of the Table Document Nos. S14H-10701 -
PWR Materials Reliability Program Response to NRC Bulletin TeR Rort s
ubmitted to NRC purst to an Aqeidavit o
14H10740 subject to a 514H-10701 V2001-01 (MRP-48), 1006284, Final Report, August 2001 theodr documents be withheld from the public previous withholding request S14Hro-10740 tdwhich was granted PWR Materials Reliability Program Interim Alloy 600 Safety EPRI Report submitted to NRC Document Nos. S14H-110742 -
Assessments for US PWR Plants (MRP-44), Part 2: Reactor Eprs pt submittdato RCpsn t an affd of S14H110807 subject to a S14H-10742 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim Correspondence 2001 requesting that the previous withholding request 78 S14H-10807 Report, May 2001 document be withheld from the public.
which was granted Correspondence dated July 31, 2001 from Nudear Energy Institute to NRC transmitting table entitled "Key Plant S14H1-11950 - S14H-11957 - EPRI Report submitted to NRC Document Nos. S14H-11950 -
S14H-11949 --
Parameters for PWR Reactor Vessel Head Nozzle PWSCC pursuant to an Affidavit of Robin L Jones dated July 31, 514H-11957 subject to a 514H-11960 Assessments (July 2001)" dated July 31, 2001; Correspondence 2001 requesting that the documents be withheld from the previous withholding request dated July 31, 2001 from EPRI to the NRC transmitting an public which was granted Affidavit of even date requesting withholding of the Table Correspondence dated July 31, 2001 from Nudlear Energy Institute to NRC transmitting table entitled "Key Plant S14P-02019 - S14P-02026 - EPRI Report submitted to NRC Document Nos. S14P-02019 -
S14P-02018 --
Parameters for PWR Reactor Vessel Head Nozzle PWSCC pursuant to an Affidavit of Robin L Jones dated July 31, S14P-02026 subject to a 514P-02029 Assessments (July 2001)" dated July 31, 2001; Correspondence 2001 requesting that the documents be withheld from the previous withholding request dated July 31, 2001 from EPRI to the NRC transmitting an public which was granted.
Affidavit of even date requesting withholding of the Table 13 of 29
Attachment A to Affidavit of Warren 3. Bilanin File.
Docum ent
^
A WithhoIding
-Name Batesbabel
- DoLumentesltion i..-
-"-,Comments;
-PWR Materials Reliability Proamnte 600 Safety EPRI Re port submitted to NRC pursuant to an Affidavit of Document Nos. 514H-10827 -
S141--10827 Ve sselsmetsop USlead Pentantios, TP-10441, Part 2, Renteri Theodore U. Marston dated May 7, 2001 requesting thiat the S1H-10892 subject to a S141-1-10892 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim document be withheld from the public previous withholding request Report, May 2001 which was granted.
Correspondence dated May 18, 2001 from Nudear Energy Institute to the NRC transmitting (i) correspondence dated May 7, 2001 from EPRI to the NRC with an Affidavit of even date requesting withholding of PWR Materials Reliability Program 80 S14H-10894 -- Interim Alloy 600 Safety Assessments for US PWR Plants (MRP-S14P-02033 -- 514P-02098 - EPRI Report submitted to NRC Document Nos. S14P-02033 --
514H-109020 44), Part 2: Reactor Vessel Top Head Penetrations, pursuant to an Affidavit of Theodore U. Marston dated May S14P-02098 subject to S14P-02033 -
1001491, Part 2, Interim Report, May 2001, (ii) Response to 7, 2001 requesting that the document be withheld from the previous withholding request S14P-02098 NRC Question 2, (iii) Preliminary Agenda - Industry Workshop public.whcwagrne on MRP Ally 600 Issue Task Group, June 3-14, 2001, (iv)
Electronic Registration Form, (v) PWR Materials Reliability Program Interim Alloy 600 Safety Assessments for US PWR Plants (MRP-44), Part 2: Reactor Vessel Top Head Penetrations, tp-1001491, Interim Report, May 2001 Memorandum dated October 22, 2001 from EPRI to the MRP CRDM Alloy 600, 82/182 lTG, MRP Senior Representatives, MRP Document Nos. 514H-11098 -
514H-11095 --
Crack Growth Rate Review Team transmitting draft Materials
.1 514H-11113 constitutes draft 81 514H-11114 Reliability Program (MRP) Recommended Crack Growth Rates 514H-11098 - S14H-11113 - Draf Materals materials and, as such, shoulc for Evaluating Primary Water Stress Corrosion Cracking not be released to the public.
(PWSCC) of Alloy 600, (MRP-055), dated October 19, 2001 I 1 Materials Reliability Program (MRP) Recommended Crack This document constitutes 514H-11373 --
Growth Rates for Evaluating Primary Water Stress Corrosion Draft Materials draft materials and, as such, 51411-11388 Cracking (PWSCC) of Alloy 600, (MRP-055), marked Draft, should not be released to the 83 dated October 19, 2001 public.
PWR Materials Reliability Program Interim Alloy 600 Safety EPIRpr umte oNCprun oa fiai f Document Nos. S14H1-11390 -.
514H-11390 --
Assessments for US PWR Plants (MRP-44), Part 2: Reactor EPRI Report submitted to NRC pursuant to an Affidavit of 514H-11455 subject to a S14H-11455 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim Tedocument be withheld from the public previous withholding request Report, May 2001whcwa ane 14 of 29
Attachment A to Affidavit of Warren J. Bilanin FIOe AdmDocument.
i;i i..
Name BateLabel Docum nt Desrpton'
.omme^-
Reque dL Correspondence dated August 21, 2001 from the Nudear S14H-11458 - 514H-11498 EPRI Report submitted to NRC Document Nos. 514H-11458 -
S14H-11457 --
Energy Institute to the NRC transmitting PWR Materials pursuant to an Affidavit of Theodore U. Marston dated 514H-11498 subject to a S14H-11498 Reliability Program Response to NRC Bulletin 2001-01(MRP-48),
August 17, 2001 requesting that the document be withheld previous withholding request 1006284, Final Report, August 2001 from the public which was granted PWR Materials Reliability Program Interim Alloy 600 Safety EPRI Report submitted to NRC pursuant to an Affidavit of Document Nos. 514H-11500 -
84 14H1-11500 --
Assessments for US PWR Plants (MRP-44), Part 2: Reactor RhepdortU Masubmitated toaNR pusun to0 aeueng Af havt th 14H--11565 subject to a 514H-11565 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim Theodore U. Marston dated May 7, 2001 requesting that the previous withholding request
_______Report, May 2001 douetb ihedfo h ulcwhich wsrated 514-12341 --
PWR Materials Reliability Program Response to NRC Bulletin EPRI Report submitted to NRC pursuant to an Affidavit of Document Nos. S4H-12341 514H-12381 2001-01(MRP-48), 1006284, Final Report, August 2001 the document be withheld from the public previous withholding request the ocumnt e wihhed frm te pulicwhich was granted Correspondence dated August 21, 2001 from the Nuclear 514H-11687 -514H-11276 EPRI Report submitted to NRC Document Nos. S14H-11687 -
S14H-11686 -- Energy Institute enclosing PWR Materials Reliability Program pursuant to an Affidavit of Theodore U. Marston dated 514H-11726 subject to a S14H-11726 Response to NRC Bulletin 2001-01(MRP-48) with EPRI Report August 17, 2001 requesting that the document be withheld previous withholding request No. 1006284.
from the public which was granted Correspondence dated August 21, 2001 from the Nuclear S14H-11756 - 514H-11795 EPRI Report submitted to NRC Document Nos. 514H-11756 -
87 S14H-11755 -
Energy Institute enclosing PWR Materials Reliability Program pursuant to an Affidavit of Theodore U. Marston dated S14H-11795 subject to a 514H-11795 Response to NRC Bulletin 2001-01(MRP-48) with EPRI Report August 17, 2001 requesting that the document be withheld previous withholding request No. 1006284.
from the public which was granted EPR Reortsubited o NC prsuntto n Afidvitof Document Nos. S14H1-11908 -
S14H-11908 --
PWR Materials Reliability Program Response to NRC Bulletin EPRI Report submitted to NRC pursuant to an Affidavit of S14H-11947 subject to a S14H-11947 2001-01(MRP-48) with EPRI Report No. 1006284.
Theodore U. Marston dated August 17 2001 requesting that previous withholding request PWR Materials Reliability Program Interim Alloy 600 Safety This document constitutes S14H-11728 --
Assessments for US PWR Plants (MRP-44), Part 2: Reactor Draft Materials draft materials and, as such, S14H-11753 Vessel Top Head Penetrations, Report TP-01001491, Part 2, should not be released to the Interim Report, May 2001, Marked DRAFT public.
PWR Materials Reliability Program Interim Alloy 600 Safety Document Nos. S14H-11965 -
514H-11965 --
Assessments for US PWR Plants (MRP-44), Part 2: Reactor EPRI Report submitted to NRC pursuant to an Aru idavit of S14H-12030 subject to a S14H-12030 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim Theodore U. Marston dated May 7, 2001 requesting that the previous withholding request 92
______Report, May 2001 douetb ihedfo h ulcwhich was granted PWR Materials Reliability Program Interim Alloy 600 Safety Document Nos. S14H-12259 -
S14H-12259 Assessments for US PWR Plants (MRP-44), Part 2: Reactor EPRI Report submitted to NRC pursuant to an Affidavit of S14H-12324 subject to S1411-12324 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim Theodore U. Marston dated May 7, 2001 requesting that the previous withholding request Keport, May IUU1 whih.......
1 was granted 15 Of 29
Attachment A to Affidavit of Warren J. Bilanin i-Na l
Batg e I her i
=
f 4
l If Correspondence dated June 29, 2001from Nudear Energy Institute to NRC transmitting Response to NRC Review Comments Transmitted by Letter dated June 22, 2001 to the S14H-12190 -- S14H-12240 EPRI Report submitted to NRC Document Nos. S14H-12190 97 S14H-12188 --
Nudear Energy Institute Relating to PWR Materials Reliability pursuant to an Affidavit of Theodore U. Marston dated S14H-12240 subject to a 514H-12240 Program Interim Alloy 600 Safety Assessment for US PWR September 27, 2001 requesting that the document be previous withholding request Plants (MRP-44), Part 2: Reactor Vessel Top Heads withheld from the public which was granted Penetrations EPRI TP-100149 (Part 2, May 2001) MRP 2001-050, Dated June 29, 2001 Material Reliability Program (MRP) Recommended Crack Growth This document constitutes 98 514H-12242 --
Rates for Evaluating Primary Water Stress Corrosion Cracking Drft MaterI draft materials and as such, S14H-12257 (PWSCC) of Alloy 600 CRDM Nozzle Material (MRP-55) Part 1:
ra atrals should not be released to the B&W Tubular Products Heats, November 4, 2001 (DRAFQ) public.
Correspondence dated July 31, 2001 from Nudear energy S14H-01825 - 514H-01832 EPRI Report submitted to NRC Document Nos. 514H-01825 -
S14H-01824 --
Institute to the NRCC regarding information requested by the pursuant to an Affidavit of Robin L. Jones dated July 31, S14H-01832 subject to a S14H-01832 NRC for data on US PWR Plants, rankings regarding years of 2001 requesting that the documents be withheld from the previous withholding request 120 operation and RPV head temperatures ublic which was granted Correspondence dated July 31, 2001 from Nudear energy S14H-01983 -514H-01990 EPRI Report submitted to NRC Document Nos. 514H-01983 -
514H-01982 --
Institute to the NRCC regarding Information requested by the pursuant to an Affidavit of Robin L Jones dated July 31, S14H-01990 subject to a 514H-01990 NRC for data on US PWR Plants, rankings regarding years of 2001 requesting that the documents be withheld from the previous withholding request operation and RPV head temperatures public which was granted l14H-02165--
N ot an EPRI document. Does not contain Proprietary l
124 02174 IExcerpt from PWSCC Crack Growth Rates Report Information.
IS14H-02174 1
i I JS14H-02510--
Response-to NRC Review Comments Transmitted by Letter l_
dated June 22, 2001 to the Nudear Energy Institute Relating to PWR Materials Reliability Program Interim Alloy 600 Safety t l EPRI Report submitted to NRC pursuant to an Affidavit of Document Nos. S14H-02510 -
lS14H n2r560 suiihipt to ak l _ wU s vvv svv l__b v v
Attachment A to Affidavit of Warren J. Bilanin File lDocument -
ungvw;4Rwi-qlll f
l.;g Name Bates Label Dociments ommenb
-isted PWR Materials Reliability Program Intenm Alloy 600 Safety i
Document Nos. S14H-02766 S14H-02766 --
Assessments for US PWR Plants (MRP-44), Part 2: Reactor EPRI Report submitted to NRC pursuant to an Affidavit of D14H-02835 subject to a 32 S14H-02835 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim document beUWiMarstonFd dMay 7,21 requesting fm t
previous withholding request docuentbeitheld romt0epubicich was granted Figure 8.6 Effect of Flange Clearances in Reducng Oxygen S14P-02807; Levels at Bolts; Figure 8.7 effect of Boric Acid Deposits in 161 S14P-03253 --
Protecting Surface from Corrosion; Each from the Boric Add EPRI Document - No Request for Withholding.
S14P--03254 Corrosion Guidebook
=_
170 S14P-00562 Figure 8-6: Effect of Flange Clearances in Reduang Oxygen EPRI Document - No Request for Withholding.
170 lS14P-02755 I Levels at Bolts from the Boric Add Corrosion Guidebook
_1 Withholding requested for 179 S14P-01833 Excerpts from EPRI Handbook of Nuclear Materials (Dec. 1997)
EPRI Proprietary Information Document Nos. S14P-01831 --
I.I I
IS14P-01833 Multiple emails regarding comments on the NRC Staffs Technical Assessments of VHP Nozzle Cracking and 200 2S2-01044 --
transmitting U.S. Nuclear Regulatory Commission Preliminary 2S2-01052 -- 2S2-01075 -- Contains EPRI Proprietary Document Nos. 2S2-uste 2 --
2S2-01075 Vessel Head Penetration Nozzles Associated with NRC Bulletin Information 252-01075 2001-01 'Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles" dated November 2001 2 2S2-01706 --
Email correspondence related to attached NRC Technical Basis S2S-01080 -- S25-01083 -- Contains EPRI Proprietary DWithholding requested for 201 2S 008 eqainInfrainDocument Nos. S2S-01080 --
252-01083 equations Informaion S25-01083 2S2-01286--
Crack Growth Rate Correlations for CRDMs Report No. SIR 207 S2S2-01307 --
Integrity Associates, Inc. for First Energy and EPRI. Contains EPRI Proprietary Informaton Document No. 2S2-01301 252-01320 EPRI Proprietary Information. Contains handwritten notes.
17 of 29
Attachment A to Affidavit of Warren J. Bilanin rt,}'-@@,tg'i _
l
.x-7 low_
_is _ i
_~-~
'Name
- , Bates Label ocmentbDescriptlon~,-
~..
Comments
-RM~emo dated 6/11/01 transmittal tor approval Materials cument Nos. 2S2-01693 --
210 252-01689 --
Reliability Program (MRP) Crack Growth Rates for Evaluating
. l 2S2-01726 consttutes draft 2S2-01726 Primary Water Stress Corrosion Cracking (PWSCC) of This Wall 252-01693 -- 252-01726-- Draft Mateals aterials and as such, should
_Alloy 600 Material (MRP-55) not be released to the public.
Correspondence dated 7/1/02 from EPRI transmitting report for Document Nos. 2S2-01467 --
2S2-01473 --
comment and approval: Inspection Plan PWR Reactor Pressure 2S2-01484 constitutes draft 2S2-01484 Vessel (RPV) Upper Head Penetrations, Revision 0, dated 2S2-01467 -- 2S2-01484 - Draft Materials materials and as such, should 6/27/02; Forwarded internally by First Energy on 7/2/02 not be released to the public.
First Energy internal correspondence dated 7/10/02 2S2-01485 --
transmitting (i) Calculation Package - Finite Element Gap Not an EPRI document. Does not contain EPRI Proprietary 2S2-01571 Analysis of CRDM Penetrations (Davis-Besse) and (ii)
Information.
Calculation Package -- Gap Opening Result from Finite Element Analysis (Davis-Besse) 228 Email dated 8/20/02 from EPRI (and forwarded internally by First Energy) transmitting correspondence dated 8/15/02 from Withholding requested for Dominion; Inspection Plan, PWR Reactor Pressure Vessel (RPV)
Document Nos. 2S2-01581fo Upper Head Penetrations, Revision 1, dated 8/6/02; Probability 252-01581 -- 2S2-01616 -- Contains EPRI Proprietary 252-01616 2S2-01576 of Detecting Leaks in PRV Upper Head Nozzles by Visual Information which has been superseded by subsequent 252-01639 Inspections, Revision 1, dated 6/17/02; Technical Basis for PRV information Document Nos. 2S2-01617 -s Upper Head Penetration Inspection Plan, Revision 0, dated 2S2-01617 -- 252-01639 - Draft Material 2S2-01639 constitute draft June 20, 2002; Supplemental Visual Inspection Intervals to Material as c
ould Ensure RPV Closure Head Structural Integrity, DRAFT, dated materials and, as such, shoul 8/18/02 with Attachment 1 - Description of the Probabilistic not be released to the public Wastage Model S14Q-02874 No Document Provided Correspondence dated July 31, 2001 from Nudear Energy S14Q-02875 -- S14Q-02883 EPRI Report submitted to NRC Document Nos. S14Q-02875 -
247 S14Q-02874 -- Institute to the NRCC regarding information requested by the pursuant to an Affidavit of Robin L Jones dated July 31, 514Q-02883 subject to a S14Q-02885 NRC for data on US PWR Plants, rankings regarding years of 2001 requesting that the documents be withheld from the previous withholding request operation and RPV head temperatures public lwhich was granted 514Q-02888 No Document Provided S 14Q -02889 I _
T PWR Materials Reliability Program Response to NRC Bulletin This document constitutes 248 S14Q-02890 --
2001-01 (MRP-48), Report No. TP-1006284, dated August 19, draft materials and as such, S14Q-02925 2001, marked "Final Draft Before Submittal to NRC on Tuesday, Draf Materials should not be released to the
_August 21, 2001" public.
18 of 29
Attachment A to Affidavit of Warren J. Bilanin Name lBates LabelntD pion Requeed41 Material Reliability Program (MRP) Recommended Crack Growth This document constitutes 251 S14Q-06787 -- Rates for Evaluating Primary Water Stress Corrosion Cracking Draft Materials draft materials and as such, S14Q-06802 (PWSCC) of Alloy 600 CRDM Nozzle Material (MRP-55) Part 1:
should not be released to the B&W Tubular Products Heats, November 4, 2001 (DRAFT) public.
PWR Materials Reliability Program Response to NRC Bulletin This document constitutes S14Q-06803 --
2001-01 (MRP-48), Report No. TP-1006284, dated August 19, draft materials and as such, S14Q-06839 2001, marked "Final Draft Before Submittal to NRC on Tuesday, Draft Materals should not be released to the 252 August 21, 2001" public.
PWR Materials Reliability Program Response to NRC Bulletin This document constitutes S14Q-07071 --
2001-01 (MRP-48), Report No. TP-1006284, dated August 19, ft Md*al raft materials and as such, S14Q-07107 2001, marked 'Final Draft Before Submittal to NRC on Tuesday, should not be released to the August 21, 2001" p public.
I PWR Materials Reliability Program Interim Alloy 600 Safety EPRI Report submitted to NRC pursuant to an Affidavit of Document Nos. 514Q-06840 -
S14Q-06840 --
Assessments for US PWR Plants (MRP-44), Part 2: Reactor Teor dadMy7201ecunththeS14Q-06905 subject to a 253 Report, May 2001 Udocumens be withneld frm the public which was granted 25 514Q-06905 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim d
ouets be
'tne d fro tepbiprevious withhtolding request 514Q-06950 --
No Documents Provided
__ __ S140-07017 UI_
255 lTable Entitled Key Plant Parameters for PWR Reactor Vessel EPRI Report submitted to NRC pursuant to an Affidavit of Dt Nos S14Q0694 255 14Q0694--Tabe Etited KeyPlat Pramter fo PW Recto Vesel Robin L. Jones dated July 31, 2001 requesting that the 514Q-06949 subject toa S14Q-06949 Head Nozzle PWSCC Assessments (July 2001) dcmnsbwihedfotepulcprevious withholding request docuent bewitheldfro th pulicwhich was granted Material Reliability Program (MRP) Recommended Crack Growth This document constitutes 256 S14Q-07018 --
Rates for Evaluating Primary Water Stress Corrosion Cracking Draft Materials draft materials and as such, 514Q-07033 (PWSCC) of Alloy 600 CRDM Nozzle Material (MRP-55) Part 1:
should not be released to the B&W Tubular Products Heats, November 4, 2001 (DRAFT) public.
Meeting Minutes re MRP Alloy 82/182 Weld Integrity Issue, Document Nos. 514Q-07058 --
259 S14Q-07055 --
Special Committee to Assess Inspection Sampling and 514Q-07058 -- 514Q-07059 -- Draft Materials Smaterals and, as such, should
=
Inspection dated 7-11-01 with draft plan as attachment mnot be released to the public 19 of 29
Attachment A to Affidavit of Warren 1 Bilanin riler Du...mii.
+.
=r
-- ";:y...................A*.nv i-Name Bates Label DocumentDesaiptionK aComments-'
Requeted PWR Materials Reliability Program Interim Alloy 600 Safety EPRI Report submitted to NRC pursuant to an Affidavit of Document Nos. S14D-00001 28 S14D-00001 --
Assessments for US PWR Plants (MRP-44), Part 2: Reactor Thoor14Dasondte a 70000euetngta6teprvo suwihhodin reques 283 TlD006 Vsee Tp~fo pe~tr~Pnnsp1Oo44;Par
~ntenm heodore U. Marston dated Ma 7, 2001 requesting that the S14D-00066 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim documents be withheld from the public prvoswthodnfeus
,oReport, May 2001 which was granted PWR Materials Reliability Program Response to NRC Bulletin EPRI Report submitted to NRC pursuant to an Affidavit of Document Nos. S14D-00067 -
284 14D-00067 2001-01 (MRP-48), Final Report, August 2001, Report No.
Theodore U. Marston dated August 17, 2001 requesting that previous withholding request S14D-00105 11006284 the documents be withheld from the public peiou ihodn eus II with was granted S14D-00177 No Document Provided This document constitutes 514D-00178 --
PWR Materials Reliability Program Response to NRC Bulletin draft materials and as such, 514D-00261 2001-01 (MRP-48) (DRAFT)
Draft Materals should not be released to the 285 public.
This document constitutes 514D-00262 --
Visual Examination for Leakage of Reactor Head Penetrations Draft Materials draft materials and as such, 514D-00265 on Top of Head, Version: 8/10/01 (DRAFT) shou!d not be released to the p__
oublic.
S14D-00268 No Document Provided PWR Materials Reliability Program Response to NRC Bulletin EPRI Report submitted to NRC pursuant to an Affidavit of Document Nos. 514D-00268 -
287 S14D-00269 2001-01 (MRP 48), Report No. 1006284, Fnal Report, August Theodore U. Marston dated August 17, 2001 requesting that S14D-00284 subject to 4
2001 the documents be withheld from the public previous withd
____________________________with___waswihgwsanrnte S14D-00306 No Document Provided Material Reliability Program (MRP) Recommended Crack Growth This document constitutes S14D-00307 --
Rates for Evaluating Primary Water Stress Corrosion Cracking
. l draft materials and as such, S14D-00322 (PWSCC) of Alloy 600 CRDM Nozzle Material (MRP-55) Part 1:
should not be released to the B&W Tubular Products Heats, November 4, 2001 (DRAFT) public.
288 Not an EPRI document. Does not contain EPRI Proprietary 14D-00323 Job Identifier Page Information.
S14D-00324 --
Draft letter to NRC Regarding Supplemental Information in Not an EPRI document Does not contain EPRI Proprietary S14D-00339 --
Response to the November 28, 2001 Regarding the Davis-Bess not anP S14D-00339 Nuclear Power Station Response to NRC Bulletin 2001-01 Informaton.
^
^>^^-
Not an EPRI document. Does not contain EPRI Proprietary I AIT5V U-J VUJIu AuCIOuu raye Ilnformation.
I I
20 of 29
Attachment A to Affidavit of Wan-en 3. 8l1anin
-File: Document 7"
- ActionWiWthholdIng Name Bates Label Doum entDecription<'
Comment Requested~-.
Correspondence dated November 19, 2001 from the NRC to S14D-00341 --
First Energy Nuclear Operating Company Regarding Davis-Not an EPRI document. Does not contain EPRI Proprietary S14D-00343 Besse Nuclear Power Station, Unit 1, Documentation of notianE S14D-00343 Conference Call of November 15, 2001, Re: Response to Informaton.
Bulletin 2001-01 (TAC No. MB2626)
S14D-00344 Job Identifier Page Not an EPRI document. Does not contain EPRI Proprietary
____________Job___________Page_
Information.
288 Not an EPRI document. Does not contain EPRI Proprietary S14D-00345 Inte__al First Energy Nu__ear Operating Company e-mall Information.
S14D-00346 Job Identifier Page Not an EPRI document. Does not contain EPRI Proprietary
_________________________Page_
Information.
Correspondence dated November 30, 2001 Regarding S14D-00347 --
Supplemental Information in Response to the November 28, Not an EPRI document. Does not contain EPRI Proprietary S14D-00366 2001 Regarding the Davis-Besse Nuclear Power Station Information.
Response to NRC Bulletin 2001-01 21 of 29
Attachment A to Affidavit of Wan-en 3. Bilanin
't File Document W.^l Name IBates Label' Document DeAdzpto.n iomments
' i-bReq
'e ted This document constitutes S14D-00540 --
PWR Materials Reliability Program Response to NRC Bulletin Draf Materials draft materials and as such, S14D-00624 2001-01 (MRP-48) (DRAFT) should not be released to the 292 public.
This document constitutes S14D-00625 --
Visual Examination for Leakage of Reactor Head Penetrations draft materials and as such, S14D-00628 on Top of Head, Version: 8/10/01 (DRAFT) should not be released to the
.p public.
This document constitutes S14D-00630 --
PWR Materials Reliability Program Response to NRC Bulletin Dr Ma'il draft materials and as such, S14D-00714 2001-01 (MRP-48), August 2001 (DRAFT) ra aterals should not be released to the
_ _ _ p u b lic.
This document constitutes S14D-00715 --
Visual Examination for Leakage of Reactor Head Penetrations Draft Materials draft materials and as such, S14D-00718 on Top of Head, Version: 8/10/01 (DRAFT) should not be released to the p u b lic.
Correspondence dated November 30, 2001 Regarding S14D-00719 --
Supplemental Information in Response to the November 28, Not an EPRI document. Does not contain EPRI Proprietary S14D-00738 2001 Regarding the Davis-Besse Nudear Power Station Information.
293 Response to NRC Bulletin 2001-01 Correspondence dated November 30, 2001 Regarding S14D-00739 --
Supplemental Information in Response to the November 28, Not an EPRI document. Does not contain EPRI Proprietary S14D-00755 2001 Regarding the Davis-Besse Nuclear Power Station Information.
Response to NRC Bulletin 2001-01 Correspondence dated November 30, 2001 Regarding S14D-00756 --
Supplemental Information in Response to the November 28, Not an EPRI document. Does not contain EPRI Proprietary S14D-00774 2001 Regarding the Davis-Besse Nuclear Power Station Information.
Response to NRC Bulletin 2001-01 Correspondence dated November 30, 2001 Regarding S14D-00775 --
Supplemental Information in Response to the November 28, Not an EPRI document. Does not contain EPRI Proprietary S14D-00794 2001 Regarding the Davis-Besse Nuclear Power Station Information.
Response to NRC Bulletin 2001-01 514D-00975 No Document Provided PWR Materials Reliability Program Response to NRC Bulletin This document constitutes 295 S14D-00976 --
2001-01 (MRP-48), Report No. TP-1006284, dated August 19, M
draft materials and as such, 514D-01012 2001, marked "Final Draft Before Submittal to NRC on Tuesdshould not be released to the AuyusL 2, 2uu+/-
Ipunlic.
22 of 29
Attachment A to Affidavit of Warren J. Bilanin Name ReaBtesLabe Fd onc 514D-001038 No Document Provided Correspondence dated July 31, 2001 from Nuclear energy S14D-01040 -- S14D-01047 EPRI Report submitted to NRC Document Nos. S14D-01040 -
297 S14D-01037 --
Institute to the NRCC regarding information requested by the pursuant to an Affidavit of Robin L Jones dated July 31, S14D-01047 subject to a S14D-01050 NRC for data on US PWR Plants, rankings regarding years of 2001 requesting that the documents be withheld from the previous withholding request operation and RPV head temperatures public which was granted Doumn Nos
_1D015 S14D-01052 --
PWR Materials Reliability Program Response to NRC Bulletin EPRI Report submitted to NRC pursuant to an Affidavit of Document Nos. 14D-01052 514D-01090 2001-01 (MRP-48), Report No. 1006284, Final Report, August Theodore U. Marston dated August 17, 2001 requesting that previous withholding request S1D000 2001 the documents be withheld from the public peiu ihodn eus 298which was granted Correspondence to NRC re Supplemental Information in S14D-01091 -
Response to the November 28, 2001 Meeting Regarding the Not an EPRI document. Does not contain EPRI Proprietary 514D-01111 Davis-Besse Nuclear Power Station Response to NRC Bulletin Information.
_2001-01 S14D-01521 No Document Provided PWR Materials Reliability Program Interim Alloy 600 Safety Document Nos. S14D-0152 -2 514D-01522 --
Assessments for US PWR Plants (MRP-44), Part 2: Reactor EPRI Report submitted to NRC pursuant to an Affidavit of 514D-01588 subject to a 299 514D-01588 Vessel Top Head Penetrations, Report TP-01001491, Part 2, Theodore U. Marston dated May 7, 2001 requesting that the previous withholding request
____Interim Report, May 2001 documents be withheld from the public which was granted PWR Materials Reliability Program Response to NRC Bulletin EPRI Report submitted to NRC pursuant to an Affidavit of Document Nos. 14D-01631 301 514D-01631 --
2001-01 (MRP-48), Report No. 1006284, Final Report, August Theodore U. Marston dated August 17, 2001 requesting that revious thholdg request S141D-01670 2001 the documents be withheld from the public wheichs washholant ed us S14D-01824 No Document Provided Material Reliability Program (MRP) Recommended Crack Growth This document constitutes S14D-01825 --
Rates for Evaluating Primary Water Stress Corrosion Cracking draft materials and as such, S14D-01840 --
(PWSCC) of Alloy 600 CRDM Nozzle Material (MRP-055), Part 1: Draft Materials draft breeased to the B&W Tubular Products Heats, November 4, 2001, marked public.
306 DRAFT S14D-01841 Job Identifier Page Not an EPRI document. Does not contain EPRI Proprietary
_ Job__Identifier__PageInformation.
PWR Materials Reliability Program Response to NRC Bulletin This document constitutes 514D-019842 -- 2001-01 (MRP-48), Report No. TP-1006284, dated August 19, draft materials and as such, 514D-01877 2001, marked 'Final Draft Before Submittal to NRC on Tuesday, Draft Materials should not be released to the l lAugust 21, 2001" l l lublic.
l 23 of 29
Attachment A to Affidavit of Warren 1 Bilanin File Doment V'
r me lBates Lbel t DesDii kjmm nti;ifts' e uest-e 514D-01962 --
PWR Materials Reliability Program Response to NRC Bulletin EPRI Report submitted to NRC pursuant to an Affidavit of Document Nos. S14D-01962 -
309 S14D 0 2
2001-01 (MRP-48), Report No. 1006284), Final Report, August Theodore U. Marston dated August 17, 2001 requesting that previous withholding request S14D-02001 2001 the documents be withheld from the public was gran ted which was granted 312 514D 03637 Excepts from EPRI 'NMAC Boric Add Corrosion Guidebook" EPRI Document. No withholding requested.
__ _ _ S14D-03639 I_
Duke Energy - Excerpts from EPRI Report TR-103354, Withholding requested for 313 S14D-03640 --
"Temperbead Welding Repair of Low Alloy Pressure Vessel EPRI Proprietary Information Document Nos.514D-03643 --
S14D-03645 Steels: Guidelines" IS14D-03645 S143-02021 No Document Provided Materials Reliability Program (MRP) Recommended Crack This document constitutes 344 S402Y)-
Growth Rates for Evaluating Primary Water Stress Corrosion Thist dcmaeri nt a co stiutes 34 S4J-02022 Cracking (PWSCC) OF Alloy 600 CRDM Nozzle Material (MRP-Draft Materials draft materials and as such, S143-2037 055), Part 1: B&W Tubular Products Heats November 4, 2001, should not be released to the marked DRAFT public.
Materials Reliability Program (MRP) Recommended Crack Growth Rates for Evaluating Primary Water Stress Corrosion This document constitutes 374 514M06269 --
Cracking (PWSCC) OF Alloy 600 CRDM Nozzle Material (MRP-Drft draft materials and as such, S14M-06284 055), Part 1: B&W Tubular Products Heats November 4, 2001, pulc.
Marked DRAFT public.
Matenal Reliability Program (MRP) Recommended Crack Growth This document constitutes 376 514M-06333 -
Rates For Evaluating Primary Water Stress Corrosion Cracking Draf Materials draft materials and as such, 514M-06348 (PWSCC of Alloy 600 (MRP-055) (dated October 19, 2001),
should not be released to the
_Marked DRAFT public.
514M-06350 -PWR Materials Reliability Program Response to NRC Bulletin EPRI Report submitted to NRC pursuant to an Affidavit of Document Nos. S14M-06350t 377 S14M-0630 -
2001-01 (MRP-48), Final Report, August 2001, Report No.
Theodore U. Marston dated August 17, 2001 requesting that previous withholding request 14M-06389 1006284 the documents be withheld from the public preiou wited
_______which was granted Z
24 of 29
Attachment A to Amdavit of Warren J. 8ilanin Dicument
- i"t' A-.r C--UJ.AthoIdl S14-R69MatAs essmens oRelUSbiPWR Planram InMrim PArto 2:0 Raeator EPRI Report submitted to NRC pursuant to an Affidavit of Document Nos. S14M-06391-378 l:
Theodore U. Marston dated May 7, 2001 requesting that the S14M-06456 subject to a S14M-06456 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim docthhld f
t public previous withholding request
_______Report, May 2001 ometbe ie rm ewhich was granted S14M -06457 -
Figures 1 through 12 Not an EPRI document. Does not contain EPRI Proprietary S14M-06466 Fiue hog 2Information.
Docket No. 50-346, Ucense No. NPF-3, Serial Number 2750, S14M-06467 - - DBNPS 11 Program Third Ten Year Interval Not an EPRI document. Does not contain EPRI Proprietary S14M-06475 Relief Request RR-A21 followed by First Energy Nudlear Ifrain Operating Company, Davis Besse Unit 1, Third 1--Year Interval Informaton.
Relief Request RR-A21 378 S14M-06476 -
Not an EPRI document. Does not contain EPRI Proprietary S14M-06477 Figures 1 and 2 Information.
S14M-06478 --
Ten Year Interval Relief Request RR-A20 - Non-Proprietary Not an EPRI document. Does not contain EPRI Proprietary i -lI Version followed by First Energy Nudear Operating Company, Informat'on S14M-_G479_
Davis-Besse Unit 1, Third 10-Year Initial Relief Request RR-420 Inor mon.
Ten Year Interval Relief Request RR-A20 - Non-Proprietary Not an EPRI document. Does not contain EPRI Proprietary S14M-06494 Version followed by First Energy Nudear Operating Company, Information.
Davis-Besse Unit 1, Third 10-Year Initial Relief Request RR-420 Matenals Reliability Program (MRP) Recommended Crack This document constitutes S14M-06495 -
Growth Rate for Evaluating Primary Water Stress Corrosion draf materials and as such, S14M-06510 Cracking (PWSCC) of Alloy 600 (MRP-055); October 19, 2001, Materals should not be released to the Marked DRAFT`
public.
PWR Materials Reliability Program Response to NRC Bulletin EPRI Report submitted to NRC pursuant to an Affidavit of Document Nos. S14M-06552 -
381 S14M06522 -
2001-01 (MRP-48), Report No. 1006284, Final Report, August, Theodore U. Marston dated August 17, 2001 requesting that S14M-06561 subject to a S14M-06561 2001 the documents be withheld from the public previous withholding request 381 Mwhich was granted 31 -Not an EPRI document. Does not contain EPRI Proprietary S14M-06562 Misc 'Job Name" document Information.
514M0653
-Not an EPRI document. Does not contain EPRI Proprietar 5S14M-06566 JSmall Accumulation of Boric Acid Found on RX Vessel Head Information.
25 of 29
Attachment A to Affidavit of Warren J. Bilanin F
.le Document l.
- L.Withh
- ll;2*
Name Bates abell Docment Des pton.
11
- Comment,
-i,.
Re ete d Document No. S14M-04021 Table Entitled "Key Plant Parameters for PWR Reactor Vessel EPRI Report submitted to NRC pursuant to an Affidavit of subject to a previous 03Head Nozzle PWSCC Assessments (July 2001)
Robin L. Jones dated July 31, 2001 requesting that the withholding request which documents be withheld from the public was granted S14R-01632 -
PWR Materials Reliability Program Response to NRC Bulletin EPRI Report submitted to NRC pursuant to an Affidavit of S14R-01671 subject to a 420 2001-01 (MRP-48), Report No. 1006284, Final Report, August, Theodore U. Marston dated August 17, 2001 requesting that previous withholding request S141-01671 2001 the documents be withheld from the publicp iou wa s
ran t
ed
____which was granted Materials Reliability Program (MRP) Recommended Crack This document constitutes S14R-01786 --
Growth Rate for Evaluating Primary Water Stress Corrosion draft materials and as such, 424 S14R-01801 Cracking (PWSCC) of Alloy 600 (MRP-055); October 19, 2001, Matenals should not be released to the Marked DRAFT public.
Correspondence dated May 18, 2001 from Nuclear Energy Institute transmitting EPRI Report No. 1001491, Part 2 to the S14R-01815 --
NRC with enclosures: 1) Enclosure 1 - Affidavit of Theodore S141-01823 Marston; 2) Enclosure 2 - Response to NRC Question 2; 3)
Does not contain EPRI Proprietary Information. - Industry workshop on MRP Alloy 600 Issue Task 426 Group June 13 - 14, 2001Preliinary Agenda; and 4) Enclosure 4 Electronic Registration Form PWR Materials Reliability Project Interim Alloy 600 Safety Document Nos. S14R1-01824 --
S14R-01824 --
Assessments for US PWR Plants (MRP-44), Part 2: Reactor EPRI Report submitted to NRC pursuant to an Affidavitt of S14R-01890 subject to a S14R-01890 Vessel Top Head Penetrations, Report No. 1001491, Part 2, Theodore U. Marston dated May 7, 2001 requesting that the previous withholding request Interim Report, May 2001 documents be withheld from the public which was granted 26 of 29
Attachment A to Affidavit of Warren 3. Bilanin File Document
- Act;on;Withho.ding.
Name BatesLabel. ;-
Document DescriptionnL
- Com t
Requested This document constitutes S14R-02935 --
Position Paper, RPV Head Penetration Cracding, September Drft Mt*rilI draft materials and as such, S14R-02936 2001 ra aeas should not be released to the public.
Materials Reliability Program (MRP) Recommended Crack This document constitutes S14R-02937 Growth Rates for Evaluating Primary Water Stress Corrosion draft materials and as such, S14R-02953 Cracking (PWSCC) OF Alloy 600 CRDM Nozzle Material (MRP-Draft Materials should not be released to the 055), Part 1: B&W Tubular Products Heats November 4, 2001, public.
marked DRAFT Correspondence dated August 21, 2001 from the Nuclear S14R-02955 - S14R-02994 EPRI Report submitted to NRC Document Nos. S14R-02955 -
S14R-02954 --
Energy Institute enclosing EPRI Report TP-1006284 PWR pursuant to an Affidavit of Theodore U. Marston dated S14R-02994 subject to a S14R-02994 Materials Reliability Program Response to NRC Bulletin 2001-August 17, 2001 requesting that the documents be withheld previous withholding request 01(MRP-48) with EPRI Report No. 1006284.
from the public which was granted EPRI Memo dated October 22, 2001 transmitting draft Report (MRP-55) to MRP CRDM Alloy 600, 82/182 11G, MRP Senior 432 Representatives, MRP Crack Growth Review Team with Document Nos. S14R-02997 -
S14R-02995 --
enclosures (i) MRP Response Form, (ii) Materials Reliability S14R-03012 constitute draft S14R-03028 Program (MRP) Recommended Crack Growth Rates for S14R-02997 -14R-03012
- Draft Materals materials and as such, should Evaluating Primary Water Stress Corrosion Cracking (PWSCC) not be released to the public.
of Alloy 600 (MRP-055) October 19, 2001, marked draft, and (iii) second copy of report, marked draft.
Correspondence dated May 18, 2001 from Nudear Energy Institute transmitting EPRI Report No. 1001491, Part 2 to the S141-03029 --
NRC with enclosures: 1) Enclosure 1 -Affidavit of Theodore S14R-03037 Marston; 2) Enclosure 2 - Response to NRC Question 2; 3)
Does not contain EPRI Proprietary Information. - Industry workshop on MRP Alloy 600 Issue Task Group June 13 - 14, 200lPreliinary Agenda; and 4) Enclosure 4 Electronic Registration Form PWR Materials Reliability Project Interim Alloy 600 Safety EPRI Report submitted to NRC pursuant to an Affdavit of Document Nos. S14R-03038 -
S14R-03038 --
Assessments for US PWR Plants (MRP-44), Part 2: Reactor TEeodore U. Marston dated MtN 7R 2put angAfiat S14R-03104 subject to a S14R-03104 Vessel Top Head Penetrations, Report No. 1001491, Part 2, edocuments be withheld from t7h, 0bl01 requesting that the vious withholding request
___ _______Interim Report, May 2001 dcmnsbwihedfotepulcwhich was granted 27 of 29
Attachment A to Affidavit of Warren 3. Bilanin File:-
Docuwent:
77 7T A-tlonl'it'ii ng Name BaeLbel Doument Desa pton
- -Cmmen
>a____._-.__
d_______
EPRI Memo dated October 22, 2001 transmitting draft Report (MRP-55) to MRP CRDM Alloy 600, 82/182 ITG, MRP Senior Document Nos. S14R-03107 -
S14R1-03105 --
Representatives, MRP Crack Growth Review Team with S14R-03122 constitute draft 432 S14R-03122 enclosures (i) MRP Response Form, and (ii) Materials Reliability S14R-03107 -- S14R-03122 Draft Materials materials and as such, should Program (MRP) Recommended Crack Growth Rates for not be released to the public.
Evaluating Primary Water Stress Corrosion Cracking (PWSCC)
_of Alloy 600 (MRP-055) October 19, 2001, marked Draft PWR Materials Reliability Program Interim Alloy 600 Safety EPIRpr umte oNCprun oa fiai f Document Nos. S14R1-03126 --
S14R-03126 -- Assessments for U.S. PWR Plants (MRP-44) Part 2: Reactor EPRI Report submitted to NRC pursuant to an Affidavit of S14R-03191 subject to a S14R-03191 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim Theodore U. Marston dated May 7, 2001 requesting that the previous withholding request Report, May 2001 which was granted 434 Correspondence dated June 14, 2001 from Brian Sheron, Office of Nuclear Reactor Regulation to Alex Marion of Nuclear Energy S14R-03192 --
Institute with enclosure entitled NRC Staff Review of MRP-44 Not an EPRI document. Does not contain EPRI Proprietary S14R-03202 "PWR Materials Reliability Project Interim Alloy 600 Safety Information.
Assessment for US PWR Plants (MRP-44), Part 1; Alloy 82/182 Pipe Butt Welds", TP-100491, Part 1, Interim Report, April 2001 IWR Materials Reliability Program Interim Alloy 600 Safety 1
Document Nos. 514Q-00603 -
463 S14Q-00603 --
Assessments for U.S. PWR Plants (MRP-44) Part 2: Reactor EPRI Report submitted to NRC pursuant to an Affidavit of S14Q-00667 subject to a S14Q-00667 Vessel Top Head Penetrations, TP-1001491, Part 2, Interim TeorU.Mrtndeday7201eqsigththeprevious withholding request 463
- _Report, May 2001 documents be withheld from the public which was granted Materials Reliability Program (MRP) Recommended Crack This document constitutes S14Q-01352 --
Growth Rate for Evaluating Primary Water Stress Corrosion Draft 464 S14Q 01367 Cracking (PWSCC) of Alloy 600 CRDM Nozzle Material (MRP-Draft Materials should not be released to the 055), Part 1: B&W Tubular Products Heats, November 4, 2001, public.
marked DRAFT A
28 of 29
Attachment A to Affidavit of Warren 1 8lhanin
- File, Document -No Withholding Name Bates Label Documn Des tin C a t
he prequestiel Document No. S14Q-01753 -
Table Entitled "Key Plant Parameters for PWR Reactor Vessel EPRI Report submitted to NRC pursuant to an Affidavit of S14Q-01756 subject to a S14Q-01756 Head Nozzle PWSCC Assessments (July 2001) documents be withheld from the public previous withholding request EPIRprIumtedt R usattoa fiai f Document No. S14Q-05367 -
S14Q-05367 Table Entitled 'Key Plant Parameters for PWR Reactor Vessel EPRI Report submitted to NRC pursuant to an Affidavit of S14Q-05640 subject to a 477 S14Q-05691 Head Nozzle PWSCC Assessments (July 2001)
Robin L Jones dated July 31, 2001 requesting that the previous withholding request documents be withheld from the public which was granted Hand-annotated Page 15 of Draft MRP-55 report regarding This document constitutes 485 S14Q-06649 Figure 5 - Comparison of MRP Recommended Crack Growth Draft Materials ubmid tt NC urrlsuaad to atho Curve for Alloy 600 R
J duoldl1sh subject to ah BOOK 1000975 (1412)Hpd Noric l PWsuCe a Reissionts
(
2001) previou wiEPRI Document. No withholding requested.
l I"Boric Acid Corrosion Guidebook - Recommended Guidance fo-r l l BOOK TR-102748 (140-4).dAddressing Boric Acid Corrosion and Leakage Issues.
EPRI Document. No withholding requested.l Submitted to NRC pursuant to an Affidavit of Theodore U.
Document subject to a CHART n-a (1566).pdf Plant PWSCC Ranking and Supporting Informabion Marston dated August 17, 2001 requesting that the previous withholding request documents be withheld from the public which was granted L