MONTHYEARML20142A3972020-05-0505 May 2020 Annual Radiological Environmental Operating Report, Figure 32, Wind Rose Annual Average 10M ML20142A3982020-05-0505 May 2020 Annual Radiological Environmental Operating Report, Figure 31, Wind Riose Annual Average 75M ML20142A3992020-05-0505 May 2020 Annual Radiological Environmental Operating Report, Figure 30, Wind Rose Annual Average 100M ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15239B2122015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15238B8652015-09-0303 September 2015 FHRR MSFHI Tables 1 and 2 ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T L-13-257, Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45)2013-07-23023 July 2013 Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45) ML12167A2622012-05-29029 May 2012 Enclosure - Davis-Besse 17RFO License Condition 2.C(7) SG Circumferential Crack Report ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML1015201172010-05-28028 May 2010 Nozzle 4 - 52M Deposit Depth ML1005396232010-02-22022 February 2010 Lessons Learned Task Force Action Plan Regarding Stress Corrosion Cracking Dec 2009 (Final Update) ML0824903002008-10-0202 October 2008 ITSB Draft R, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues ML0824902752008-10-0202 October 2008 Draft a, Attachment to Davis Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues ML0824902802008-10-0202 October 2008 ITSB Draft La, to Davis Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues ML0824902952008-10-0202 October 2008 ITSB Draft M, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues ML0824902892008-10-0202 October 2008 ITSB Draft L, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues L-08-094, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Amendment Application2008-03-12012 March 2008 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Amendment Application ML0727405102008-02-11011 February 2008 Lltf Action Plan Feb 2008 Update - Public ML0803700812008-02-0101 February 2008 Lltf Status of Recommendations February 2008 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0708602822007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Appendix B, Crack Driving Force and Growth Rate Estimates ML0708602532007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 3. Background ML0708602612007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 5. Worldwide Industry Response to CRDM and Other Alloy 600 Nozzle Cracking ML0708602682007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 7. FENOC/Davis-Besse Response to CRDM Cracking and Boric Acid Corrosion Issues ML0708602812007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Appendix a, Finite Element Stress Analysis of Davis-Besse CRDM Nozzle 3 Penetration ML0708602712007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 8. Stress Analysis and Crack Growth Rates for Davis-Besse CRDM Nozzles 2 and 3 ML0708602642007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 6. Boric Acid Wastage of Carbon Steel Components in Us PWR Plants ML0702603952007-01-31031 January 2007 Summary of Conference Telephone Call Regarding the Spring 2006 Steam Generator Inspections - Handouts ML0618002582006-06-27027 June 2006 Closure of Davis-Besse Operational Improvement Plan ML0611401302006-03-16016 March 2006 Ltr Fm J. Gutierrez, Morgan Lewis to S. Brock Requesting to Withhold Materials from Public Disclosure Which Was Submitted by FENOC - Affidavits of Terry Young and Warren Bilanin ML0525707982005-09-12012 September 2005 Documentation of Completed Post-Restart Process Plan for Transition of Davis-Besse from the IMC 0350 Oversight Process to the Reactor Oversight Program (ROP) ML0523801412005-08-31031 August 2005 Status of Davis-Besse Lessons Learned Task Force Recommendations - Last Update: August 31, 2005 ML0411301992004-04-21021 April 2004 Oversight Panel Final Restart Checklist Public Release Memo ML0414503382004-02-13013 February 2004 Oversight Panel Open Action Item List ML0414503372004-02-13013 February 2004 IMC 0350 Panel Process Plan ML0414503262004-02-13013 February 2004 Restart Action Matrix - Open Items Only ML0308000432003-01-0101 January 2003 Firstenergy Nuclear Operating Company, NRC Allegations and Employee Concerns Program Contact Trends, January 2002 - January 2003 ML0224601492002-08-29029 August 2002 Undated Data Chart, CDF, LERF, Rem ML0224601482002-08-29029 August 2002 Heat 69 Crack Growth - Bounding Weibull with 1.5 Shape Facto with Handwritten Notes ML0224601422002-08-29029 August 2002 Chart, Long-Term Results for Integrated Model with Handwritten Notes ML0224003452002-08-27027 August 2002 Failure Frequency Curve for Davis-Besse Conditions ML0224003402002-08-27027 August 2002 Draft Graphs for Flaw Curves and Stress Intensity Factors ML0530703682002-03-13013 March 2002 Timeline of Key Events Related to Reactor Vessel Head Boric Acid Wastage Rev.3, 3-13-02 ML0530704022001-04-20020 April 2001 Normal Sump Pump Samples 2020-05-05
[Table view] |
Text
A February 13, 2004 DAVIS-BESSE OVERSIGHT PANEL "OPEN" ACTION ITEM LIST Item Action Item Assigned to Comments Due Date Number (Date generated) 208 Evaluate the need to call D. Passehl 10/14-Investigation is still ongoing; TBD back Cl regarding Allegation 12/23-Discussed, awaiting DOJ RIII-2002-A-0177 (D-B) after Investigation.
the 01 Investigation is complete (08/21) 224 Rewrite the proposed IN on D. Hills 12/15-Discussed, D. Hills is working; 02/15/04 TSP to be generic and 12/23-Discussed, this Issue will be reflect attainable plant discussed Internally in RIII and brought conditions and what to Panel on 1/06/03 for a final decision information should be on how to proceed; 1/20-Discussed, dissiminated to the industry revised IN is with Panel Chairman for concerning Boric Acid review; 1/30-Discussed, Chairman's Corrosion Control Programs. comments were sent to J. Lara.
(12/09) 228 Place all Email requests sent R. Baker 1/06-Discussed, will verify ADAMS 02/13/04 throughout Agency, package is in place to support collection responses received, and of emails and responses-email requests issue resolutions in ADAMS will be resent due to small response to package for documentation. date; 1/30-Discussed, will verify and (12/16) update Panel on 2/5/04; 2/3-Discussed, Lead changed, verified ADAMS package in place, coordinate with J.
Shea and A. Mendiola that all emails Included in ADAMS package.
232 Track the status of the J. Stang 12/30-Discussed, J. Dyer briefed on 01/23/04 response on App. R TIA due 12/29/03; J. Caldwell brief scheduled for 01/09/04. (12/30) 12/31/03; 01/13-Discussed, due date extended until 01/16/04; 01/15-Discussed, the due date extended for final draft, by agreement with Region to 01/23/04; 1/26-Discussed, expect final response from Tech review by end of the week, 1/30; 2/5-Discussed, NRR working tech review.
234 Develop protocol paper for W. Ruland 10/15/04-Discussed, protocol paper 01/16/04 NRC representative on DOJ reguarding decision making being committee interface with drafted as a letter from Sam Collins to 0350 Panel for updates. Bruce Boger and includes criteria for (01/06) Immediate Action; 1/20-Discussed, the draft has been sent to B. Boger for DOJ comments; 1/26-Discussed, B. Boger is reviewing with senior management; 2/3-Discussed, protocol paper in review by OGC.
1
February 13, 2004 DAVIS-BESSE OVERSIGHT PANEL "OPEN" ACTION ITEM LIST Item Action Item Assigned to Comments Due Date Number (Date generated) 235 Advise panel on need for J. Jacobson 01/13-Discussed, will contact Jacobson 02/10104 post-restart inspection, for when a brief will be provided to the based on review of our Panel; 1/30-Discussed, Brief will be Greenpeace 2.206 petition provided to Panel at 2/5/04 meeting; and the immediate action 2/5-Discussed, will brief Panel on response letter we issued on 2110/04.
Nov 26, 2003 (01/08) 242 Review MC 0350 and D. Passehl 2/3-Discussed, will update Panel on 02/10/04 philosophy on which review at meeting 2/5/04; 215-documentation is required Discussed, will provide specific on for public dissemination and retention of document to Panel on which should be retained 2/10/04.
following plant restart. (1/26) 2