Category:- No Document Type Applies
MONTHYEARML22041B1072022-02-10010 February 2022 LTR-22-0033-1 Oedo Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML20177A4932020-06-25025 June 2020 Enclosure a - Redacted Owners, Officers, Directors, and Executive Personnel Forms for Energy Harbor Corp., Energy Harbor Nuclear Corp., and Energy Harbor Nuclear Generation LLC ML20008D2232020-01-0808 January 2020 NRC Region I Twitter Feeds 10-1 to 12-31-2019 L-16-092, Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 62016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 6 ML16132A3962016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 5 of 6 ML16132A3942016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 3 of 6 ML16132A3932016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 2 of 6 ML15231A3642015-05-27027 May 2015 FOIA/PA-2014-0204 - Resp 1 - Final, Group a ML12167A0622012-07-16016 July 2012 Enclosure - Davis-Besse 17RFO SG Tube Inspection Tables ML12170B1042012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #4 Scenario ML12170B1052012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #5 Scenario ML12200A1832012-06-12012 June 2012 Unit Licensing Basis Seismic Ground Motion Concern ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11348A0432011-12-12012 December 2011 Email -- Davis-Besse SB Crack Rc Investigation RFI ML12213A3532011-11-15015 November 2011 Shield Building Laminar Cracking ML12213A3512011-11-10010 November 2011 Containment Shield Building Issue ML12200A1952011-11-0707 November 2011 Shield Building Issue NRC Technical Reviewer Focus Questions ML11301A2392011-10-31031 October 2011 Reference: Wind Resource Estimates Developed by Aws Truepower LLC for Windnavigator ML11301A2352011-10-31031 October 2011 References: Concentrating Solar Resources of the United States ML1126601882011-09-23023 September 2011 NRC 2011 Davis-Besse L-11-165, Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30)2011-05-27027 May 2011 Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30) ML11193A1332011-05-27027 May 2011 Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab H 1 Through Tab H 16) ML11193A1042011-05-27027 May 2011 Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab H 17 to Tab C 2) ML11227A1962011-05-27027 May 2011 Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab Am 1 Through a 7) ML11109A0842011-04-15015 April 2011 Attachments B-D, to L-11-107, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application ML1016006942010-06-10010 June 2010 G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse - T. Gurdziel Questions ML1017301232010-06-0909 June 2010 Green Ticket Tritium Releases ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML0906500232009-03-0606 March 2009 Safety Culture Policy Statement (Safety & Security) Comments ML0904800182009-02-17017 February 2009 Public Comments Regarding the Safety Culture Policy Statement ML0906404392009-01-28028 January 2009 Enclosure 5: Case Study 1: Structure of TS for Ultrasonic Flow Meters - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf ML0829101252008-11-20020 November 2008 ITSB R-Relocated Specifications - to Davis Besse Amendment Beyond Scope Issues ML0829007802008-11-20020 November 2008 ITSB L-Less Restrictive Changes - Attachment to Davis-Besse Amendment Beyond Scope Issues ML0829006832008-11-20020 November 2008 Table A-DOC Attachment - Administrative Changes - to Davis-Besse Amend. ITS with Beyond Scope Issues ML0829006302008-11-20020 November 2008 List of Acronyms to Davis-Besse Amend. Re; ITS with Beyond Scope Issues ML0829101122008-11-20020 November 2008 ITSB M - More Restrictive Changes - to Davis Besse Amendment Beyond Scope Issues ML0824902712008-10-0202 October 2008 List of Acronyms to Davis Besse Draft Amend. ITS Conversion L-08-241, Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs2008-08-26026 August 2008 Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs ML0803600792008-02-0101 February 2008 Attachment 1- DBNPS Steam Generator Inspections Data ML0802800442008-01-25025 January 2008 Special Inspection Evaluation, Basis for Investigatory Response Decision for a Significant Operational Power Reactor Event ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0733801902007-06-27027 June 2007 Meeting Attendees, 6/27/07, Meeting with Firstenergy Nuclear Operating Company Regarding May 14, 2007, Demand for Information ML0634705992006-12-14014 December 2006 Plant Service List ML0535402852005-12-16016 December 2005 Issuance of Conforming Amendments for Bv, Units 1 and 2; Perry, Unit 1 and Davis-Besse, Unit 1 Transfer of Ownership Interests to Fengenco - Amendment 7 to Indemnity Agreement B-79 ML0530704422005-11-0808 November 2005 Proposal to Clean Incore Tunnel and Below Vessel - a Locked High Radiation Area ML0531302012005-04-21021 April 2005 Timeline for Enforcement Actions ML0423002112004-08-0505 August 2004 Submittal of Independent Assessment Plan for the Davis-Besse Nuclear Power Station Operations Performance, Revision 2 2022-02-10
[Table view] |
Text
December 12, 2011 Davis Besse Information Request - Inspector M. Holmberg - (630) 829-9748, msh@nrc.gov To support an NRC inspection (followup review) please have the following information provided to the Site Resident Inspectors Office on Monday January 9, 2012. This information is needed to support NRC review of the root cause of cracking in the shield building (SB) identified during the recent 17-M Davis-Besse outage. This inspection will be conducted in accordance with Section 02.04.c and Appendix B Temporary Containment Opening Review Guidance of NRC inspection procedure IP 71007 Reactor Head Replacement. If any records are not available on January 9, 2012, please identify a date when this information will be available.
- 1) All site and vendor corrective action records related to the identification of cracks in the SB.
- 2) Copy of corrective action records (for past 5 years) that identify degraded conditions associated with the shield building.
- 3) Composition of Root Cause Team (RCT) investigating the SB cracks (Including contractors) -
Please identify the Team Lead, Members (with a short biography/resume) and contact numbers.
- 4) Identify the corrective action record associated with the RCT efforts to determine the cause of the SB cracking.
- 5) RCT- Charter defining scope and methods used to identify the root cause of the SB cracking.
- 6) Current (draft) of the list of potential causes considered and preliminary status (e.g. possible cause or ruled out). Additionally, provide the draft RCT assessment with respect to the potential cause of these cracks associated with concrete carbonation (CC). CC is caused by the seepage of carbon dioxide through the concrete wall creating a chemical reaction that lowers the alkalinity of the concrete leading to corrosion of the steel reinforcing materials (rebar). As the steel corrodes, it expands and creates cracks in the concrete that may run adjacent to the steel rebar.
- 7) Identify (if) and to what extent the RCT has considered the information developed by Oak Ridge National Laboratory related to concrete degradation (reference NUREG/CR NUREG/CR-6927 - ORNL/TM-2006/529- in Primer on Durability of Nuclear Power Plant Reinforced Concrete Structures - A Review of Pertinent Factors published in February 2007). If this information was not considered explain why it was not considered applicable to this root cause investigation.
- 8) Identify and describe any nonconformances for the SB concrete or steel reinforcement (rebar) with applicable specifications, standards or design that have been identified to date (e.g.
up thru January 1, 2012) by the RCT investigation of the SB cracking.
- 9) Drawings/maps that identify the extent of SB cracking identified to date and document which identifies any additional plans to further define the extent of SB cracking.
- 10) Drawings/maps that identify the extent of nondestructive examinations and location of core bores used to confirm the current extent of SB cracking to date.
- 11) Plan/instruction which identifies the concrete samples removed from the SB to be subjected to further examination or testing in support of the RCT investigation.
- 12) Identify list and provide a copy of the vendor procedures or applicable American Society for Testing and Materials (ASTM) standards applied for each test or examination performed on SB concrete samples in support of the RCT investigations and the intended purpose for each test/exam performed. If any testing or examination of concrete were conducted without approved procedures identify these tests or examinations and the extent to which this information is relied upon by the RCT.
- 13) Provide the owners acceptance review of the vendor tests/exams discussed in question 12 above. If an owners acceptance review is not required, explain.
- 14) Qualifications and certifications for contractors performing tests and examinations in support of the SB root cause investigation.
- 15) Schedule for completion of root cause report and any interim milestones (e.g. core bore testing complete, creep testing complete, data analysis complete, etc).
- 16) Schedule for completion of extent of condition review for cracking.
- 17) Purchase Orders for vendors performing work or testing in support of SB root cause (e.g.
testing, examination of core bores).
- 18) Copy of the following site or corporate procedures associated with:
a) The corrective action process including screening and defining significance of corrective action records.
b) Defining quality assurance requirements applicable to vendors that perform tests or examinations in support of root cause investigations.
- 19) Copy of vendor procedure used for impulse response testing (IRT) and mapping of crack locations in the SB.
- 20) If the extent of SB cracking is reliant upon IRT, provide the bases document which validates this method (e.g. confirmatory core bore tests with statistically valid sample size). Additionally, provide the owners acceptance review of this document.