Shield Building Issue NRC Technical Reviewer Focus Questions
ML12200A195
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/07/2011
From:
Office of Nuclear Reactor Regulation
To:
References
FOIA/PA-2012-0121
Download: ML12200A195 (1)


Text

Davis Besse Shield Building Issue NRC Technical Reviewer Focus Questions 11/7/11

1. Does the licensee's extent of condition (scope of mapping and core bores) provide an acceptable systematic, representative sample that accurately characterizes the condition of the shield building (or at least sufficiently bounds the condition for analysis)? Why or why not?
2. Does the licensee's analysis provide reasonable assurance that the shield building will perform its design function? Why or why not?
a. If yes, does the shield building remain in conformance with all licensing and design basis requirements including required Codes and required safety margins? Note that if the shield building is functional but nonconforming, then the licensee would be able to restart the plant, but would be expected to have a plan in place to restore conformance (additional analysis, repairs, or license amendment) at the next reasonable opportunity.
3. Has the licensee provided reasonable assurance that the shield building will remain capable of performing its design function in the near and distant future (i.e. the condition will not worsen)? Why or why not? If not, are we comfortable until the next refuel outage (May 2012) and why, and what additional actions from the licensee, if any, do we think are necessary going forward?