ML20142A399
From kanterella
Jump to navigation
Jump to search
ML20142A399 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 05/05/2020 |
From: | Energy Harbor Nuclear Corp |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML20142A392 | List: |
References | |
L-20-093 | |
Download: ML20142A399 (1) | |
Similar Documents at Davis Besse | |
---|---|
Category:Graphics incl Charts and Tables
MONTHYEARL-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024
[Table view]Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models ML20142A3972020-05-0505 May 2020 Annual Radiological Environmental Operating Report, Figure 32, Wind Rose Annual Average 10M ML20142A3982020-05-0505 May 2020 Annual Radiological Environmental Operating Report, Figure 31, Wind Riose Annual Average 75M ML20142A3992020-05-0505 May 2020 Annual Radiological Environmental Operating Report, Figure 30, Wind Rose Annual Average 100M ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15239B2122015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15238B8652015-09-0303 September 2015 FHRR MSFHI Tables 1 and 2 ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T L-13-257, Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45)2013-07-23023 July 2013 Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45) ML12167A2622012-05-29029 May 2012 Enclosure - Davis-Besse 17RFO License Condition 2.C(7) SG Circumferential Crack Report ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML1015201172010-05-28028 May 2010 Nozzle 4 - 52M Deposit Depth ML1005396232010-02-22022 February 2010 Lessons Learned Task Force Action Plan Regarding Stress Corrosion Cracking Dec 2009 (Final Update) ML0824902892008-10-0202 October 2008 ITSB Draft L, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues ML0824903002008-10-0202 October 2008 ITSB Draft R, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues ML0824902952008-10-0202 October 2008 ITSB Draft M, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues ML0824902752008-10-0202 October 2008 Draft a, Attachment to Davis Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues ML0824902802008-10-0202 October 2008 ITSB Draft La, to Davis Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues L-08-094, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Amendment Application2008-03-12012 March 2008 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Amendment Application ML0727405102008-02-11011 February 2008 Lltf Action Plan Feb 2008 Update - Public ML0803700812008-02-0101 February 2008 Lltf Status of Recommendations February 2008 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0708602822007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Appendix B, Crack Driving Force and Growth Rate Estimates ML0708602812007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Appendix a, Finite Element Stress Analysis of Davis-Besse CRDM Nozzle 3 Penetration ML0708602712007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 8. Stress Analysis and Crack Growth Rates for Davis-Besse CRDM Nozzles 2 and 3 ML0708602682007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 7. FENOC/Davis-Besse Response to CRDM Cracking and Boric Acid Corrosion Issues ML0708602642007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 6. Boric Acid Wastage of Carbon Steel Components in Us PWR Plants ML0708602612007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 5. Worldwide Industry Response to CRDM and Other Alloy 600 Nozzle Cracking ML0708602532007-03-15015 March 2007 Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event, Section 3. Background ML0702603952007-01-31031 January 2007 Summary of Conference Telephone Call Regarding the Spring 2006 Steam Generator Inspections - Handouts ML0618002582006-06-27027 June 2006 Closure of Davis-Besse Operational Improvement Plan ML0611401302006-03-16016 March 2006 Ltr Fm J. Gutierrez, Morgan Lewis to S. Brock Requesting to Withhold Materials from Public Disclosure Which Was Submitted by FENOC - Affidavits of Terry Young and Warren Bilanin ML0525707982005-09-12012 September 2005 Documentation of Completed Post-Restart Process Plan for Transition of Davis-Besse from the IMC 0350 Oversight Process to the Reactor Oversight Program (ROP) ML0523801412005-08-31031 August 2005 Status of Davis-Besse Lessons Learned Task Force Recommendations - Last Update: August 31, 2005 ML0411301992004-04-21021 April 2004 Oversight Panel Final Restart Checklist Public Release Memo ML0414503382004-02-13013 February 2004 Oversight Panel Open Action Item List ML0414503372004-02-13013 February 2004 IMC 0350 Panel Process Plan ML0414503262004-02-13013 February 2004 Restart Action Matrix - Open Items Only ML0308000432003-01-0101 January 2003 Firstenergy Nuclear Operating Company, NRC Allegations and Employee Concerns Program Contact Trends, January 2002 - January 2003 ML0224601492002-08-29029 August 2002 Undated Data Chart, CDF, LERF, Rem ML0224601482002-08-29029 August 2002 Heat 69 Crack Growth - Bounding Weibull with 1.5 Shape Facto with Handwritten Notes ML0224601422002-08-29029 August 2002 Chart, Long-Term Results for Integrated Model with Handwritten Notes ML0224003452002-08-27027 August 2002 Failure Frequency Curve for Davis-Besse Conditions ML0224003402002-08-27027 August 2002 Draft Graphs for Flaw Curves and Stress Intensity Factors ML0530703682002-03-13013 March 2002 Timeline of Key Events Related to Reactor Vessel Head Boric Acid Wastage Rev.3, 3-13-02 ML0530704022001-04-20020 April 2001 Normal Sump Pump Samples 2024-06-19 Category:Periodic Monitoring Report (Radiological/Environmental) MONTHYEARL-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023
[Table view]Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML20142A3992020-05-0505 May 2020 Annual Radiological Environmental Operating Report, Figure 30, Wind Rose Annual Average 100M ML20142A3982020-05-0505 May 2020 Annual Radiological Environmental Operating Report, Figure 31, Wind Riose Annual Average 75M ML20142A3972020-05-0505 May 2020 Annual Radiological Environmental Operating Report, Figure 32, Wind Rose Annual Average 10M ML20142A3932020-05-0505 May 2020 Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report for the 2019 L-10-120, Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report for the Davis-Besse Nuclear Power Station - 20092010-05-14014 May 2010 Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report for the Davis-Besse Nuclear Power Station - 2009 2023-12-07 |
Text
Davis-Besse Nuclear Power Station 2019 Annual Radiological Environmental Operating Report Figure 30 Wind Rose Annual Average 100M 116
Retrieved from "https://kanterella.com/w/index.php?title=ML20142A399&oldid=3452642"