Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17296B131 | 25 September 1980 | Vol II of III of Transcript of 800925 & 26 Sys Review of Palo Verde Nuclear Generating Station Equipment Qualification,Before Equipment Qualification Review Board. Pp 214-389 | Safe Shutdown Earthquake Operating Basis Earthquake Design basis earthquake Earthquake |
ML17296B133 | 25 September 1980 | Vol I of III of Transcript of 800925 & 26 Sys Review of Palo Verde Nuclear Generating Station Equipment Qualification Before Equipment Qualification Review Board. Pp 1-213 | Safe Shutdown High Radiation Area Backfit |
ML17297A581 | 18 June 1981 | Transcript Vol 2,of 810617-18 Independent Design Review of Facility Instrumentation & Control Sys Before Instrumentation & Control Sys Review Board in Phoenix,Az. Pp 215-346.Addendum of Open Items Encl | Safe Shutdown Anticipated operational occurrence Earthquake Pressure Boundary Leakage Backfit Loctite |
ML20009D096 | 18 June 1981 | Transcript Vol 1,of 810617-18 Independent Design Review of Facility Instrumentation & Control Sys Before Instrumentation & Control Sys Review Board in Phoenix,Az. Pp 1-215 | |
ML20040F451 | 4 February 1982 | Testimony of RP Kennedy & Rd Campbell.Uneven Tank Support Resulting from Soil Settlement Has Not Damaged Borated Water Storage Tanks.Design Basis Has Not Been Violated Nor Safe Operating Life Reduced | Nondestructive Examination Finite Element Analysis |
ML20054F689 | 15 June 1982 | Testimony of Jj Lemmon Re Contamination of Groundwater in Phoenix Area & Possible Adverse Impact on Available Water Supplies to Municipalities in Foreseeable Future.Supporting Documentation Encl | |
ML20054F923 | 16 June 1982 | Testimony of Ek Swanson Re Contamination of Groundwater in Phoenix,Az Area Documented by State of Az Dept of Health Svcs.Trichloroethylene Briefing Document,Raw Data & Dibromochloropropane Sampling Program Encl | |
ML20054F930 | 17 June 1982 | Testimony of Wg Bingham Re Circulating Water Tests, Flexibility in Design & Operation of Circulating Water Sys & Reliability of Facility Water Reclamation Plant | |
ML20054J864 | 24 June 1982 | Transcript of 820614 OL Hearing in Phoenix,Az.Pp 2,223- 2,454 | Safe Shutdown Ultimate heat sink |
ML20054J887 | 25 June 1982 | Transcript of 820625 OL Evidentiary Hearing in Phoenix,Az. Pp 2,455-2,710 | Safe Shutdown Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Earthquake |
ML20054J989 | 22 June 1982 | Transcript of 820622 OL Hearing in Phoenix,Az. Pp 1,779-2,019 | Ultimate heat sink Affidavit |
ML20054K032 | 23 June 1982 | Transcript of 820623 OL Evidentiary Hearing in Phoenix,Az. Pp 2,020-2,222 | Ultimate heat sink Affidavit |
ML20062D523 | 3 August 1982 | Proposed Corrections to 820427-30,0525-28 & 0622-25 Transcripts of Hearing | |
ML20126E300 | 11 June 1985 | Transcript of 850611 Hearing in Phoenix,Az Re OL Proceeding. Pp 2,894-3,090 | |
ML20126G762 | 30 May 1985 | Transcript of Commission 850530 Discussion/Possible Vote in Washington,Dc Re Full Power Ol.Pp 1-66.Viewgraphs Encl | Fitness for Duty Ultimate heat sink Fire Protection Program |
ML20126M359 | 12 June 1985 | Transcript of 850612 Hearing in Phoenix,Az Re OL Proceeding. Pp 3,091-3,137 | Safe Shutdown |
ML20127P518 | 29 June 1982 | Transcript of Tape Recorded 820629 Interview W/Hr Nunez Re Allegation of Falsification of Termination Cards for Work at Facilities | Scaffolding Stolen |
ML20127P537 | 17 June 1982 | Transcript of 820617 Interview W/Ga Kennard Re Allegation of Falsification of Termination Cable Cards for Work Performed at Facilities | |
ML20127P551 | 17 June 1982 | Transcript of 820617 Interview W/P Aguayo | |
ML20127P597 | 17 June 1982 | Transcript of 820617 Interview W/Dj Mast Re Allegations of Falsification of Termination Cards for Work Done at Facilities | |
ML20127P622 | 17 June 1982 | Transcript of 820617 Interview W/Sj Moody Re Allegation of Falsification of Termination Cards for Work Done at Facilities | |
ML20127P663 | 28 June 1982 | Transcript of Interview W/Jg Sandoval Re Allegations of Falsification of Termination Cards for Work Done at Facilities | |
ML20127P676 | 17 June 1982 | Transcript of Interview W/Jh Schuh Re Allegations of Falsification of Termination Cards for Work at Facilities | |
ML20127P688 | 28 June 1982 | Transcript of Interview W/Jb Sweet Re Allegations of Falsification of Termination Cards for Work at Facilities | |
ML20127P709 | 16 June 1982 | Transcript of Interview W/K Wallerstein by Ej Power & Oc Shuckleton Re Allegations of Falsification of Termination Cards for Work at Facilities | Stolen |
ML20128M872 | 13 July 1982 | Transcript of Interview of T Bunting on 820713 Re Allegations.Pp 1-40 | |
ML20128M894 | 14 July 1982 | Transcript of Interview of Wm Baker on 820714 Re Allegations.Pp 1-30 | |
ML20128M916 | 1 July 1982 | Transcript of Interview of WR Burdick on 820701 Re Allegations.Pp 1-28 | |
ML20128M933 | 17 June 1982 | Transcript of Interview of Jh Crane on 820617 Re Allegations.Pp 1-32 | |
ML20128M945 | 1 July 1982 | Transcript of Interview of RA Deakins on 820701 Re Allegations.Pp 1-17 | |
ML20128M965 | 2 July 1982 | Transcript of Interview of Nj Doebler on 820702 Re Core Drilling Allegations.Pp 1-8 | |
ML20128N002 | 28 June 1982 | Transcript of Interview of Mb Goldberg on 820628 Re Allegations.Pp 1-7 | |
ML20128N016 | 17 June 1982 | Transcript of Interview of Ga Kennard on 820617 Re Allegations.Pp 1-18.Info Deleted | |
ML20128N105 | 17 June 1982 | Transcript of Interview of Dj Mast on 820617 Re Allegations. Pp 1-17 | |
ML20128N131 | 17 June 1982 | Transcript of Interview of Sj Moody on 820617 Re Allegations.Pp 1-15 | |
ML20128N170 | 29 June 1982 | Transcript of Interview of HR Nunez on 820629 Re Responses to Allegations.Pp 1-44.Info Deleted | Scaffolding Stolen |
ML20128N219 | 30 June 1982 | Transcript of Interview of RA Rehfeld on 820630 Re Allegations.Pp 1-37 | |
ML20128N332 | 1 June 1982 | Transcript of Interview of Rd Gunderson on 820601 Re Allegations.Pp 1-166.Info Deleted | |
ML20128N360 | 15 July 1982 | Transcript of Interview of Rc Ruff on 820715 Re Allegations. Pp 1-8 | |
ML20128N374 | 15 July 1982 | Transcript of Interview of Rc Ruff on 820715 Re Allegations. Pp 1-7 | |
ML20128N407 | 28 June 1982 | Transcript of Interview of Jg Sandoval on 820628 Re Responses to Allegations.Pp 1-14 | |
ML20128N441 | 17 June 1982 | Transcript of Interview of Jh Schuh on 820617 Re Allegations.Pp 1-17.Info Deleted | |
ML20128N472 | 17 June 1982 | Transcript of Interview of Kh Seger on 820617 Re Allegations.Pp 1-17.Transcript of Interview of RB Keith on 820617 Encl (Pp 1-17) | |
ML20128N499 | 16 June 1982 | Transcript of Interview of P Sollami on 820616 Re Allegations.Pp 1-9 | |
ML20128N537 | 28 June 1982 | Transcript of Interview of JB Sweet on 820628 Re Allegations.Pp 1-28 | |
ML20128N564 | 1 July 1982 | Transcript of Interview of Jt Hanze on 820701 Re Allegations.Pp 1-17 | |
ML20128N576 | 16 June 1982 | Transcript of Interview of C Wallerstein on 820616 Re Allegations.Pp 1-27 | |
ML20128N586 | 13 July 1982 | Transcript of Interview of Yoshimoto on 820713 Re Allegations.Pp 1-12 | |
ML20128P506 | 30 May 1985 | Testimony of RB Samworth Re Rate of Emission of Drift from Facility Cooling Towers.Related Correspondence | |
ML20138K066 | 12 December 1985 | Transcript of 851212 Affirmation/Discussion & Vote in Washington,Dc Re SECY-85-367A on Palo Verde 1 Leaseback & SECY-85-371 on Refund on Black Fox License Fee.Pp 1-4 |