Issue date | Title | Topic | |
---|---|---|---|
ML20203M382 | 22 August 1986 | Forwards Insp Rept 50-410/86-47 on 860804-08.No Violation Noted | |
ML20203N559 | 30 April 1986 | Requests Ltr of Commitment That Facility Will Be in Compliance W/Reg Guide 1.97 by Fuel Load,Per Generic Ltr 82-33,dtd 821217 & 851008 Telcon | |
ML20204F075 | 16 March 1987 | Forwards Safety Insp Rept 50-410/87-07 on 870209-13.No Violations Noted | |
ML20204F305 | 18 March 1987 | Forwards Insp Rept 50-410/87-03 on 870112-28.No Violations Noted | |
ML20205A376 | 5 August 1986 | Forwards Safety Insp Rept 50-410/86-33 on 860630-0711 & Notice of Deviation | |
ML20205A673 | 22 April 1985 | Forwards Exam Rept 50-220/85-03 on 850311-15.NRC Will Continue to Monitor Requalification Program | |
ML20205G844 | 25 March 1987 | Forwards Safety Insp Rept 50-410/87-05 on 870202-05.No Violations Noted | |
ML20206K707 | 18 November 1988 | Forwards Insp Repts 50-220/88-30 & 50-410/88-29 on 880926-30.No Violations Noted | |
ML20206M221 | 25 June 1986 | Forwards Safety Insp Rept 50-354/86-29 on 860527-30.No Violation Noted | Fire Protection Program |
ML20206T589 | 29 September 1986 | Forwards Corrected Pages to Final Draft Tech Specs, Transmitted on 860910 & 11,correcting Editorial & Word Processing Errors | Reactor Vessel Water Level Grab sample Offsite Dose Calculation Manual Scram Discharge Volume Annual Radiological Environmental Operating Report Fire Watch |
ML20207D429 | 9 July 1986 | Requests Revised Response to 851115 IE Bulletin 85-003 Re motor-operated Valve Common Mode Failures During Plant Transients by 860918.Core Spray Sys Suitable for Facility, Per Util 860516 Response to Bulletin | |
ML20207D702 | 10 July 1986 | Forwards Emergency Preparedness Implementation Appraisal 50-410/86-23 on 860519-22.No Violations Noted.Meeting to Discuss Deviation from NUREG-0654 (Technical Support Ctr Control Over Both on & Offsite Actions) Will Be Scheduled | |
ML20207J438 | 24 December 1986 | Forwards Insp Rept 50-410/86-53 on 860922-26.No Violation Noted | |
ML20207K231 | 31 December 1986 | Forwards Safety Insp Repts 50-220/86-27 & 50-410/86-66 on 861201-05.No Violations Observed | |
ML20207K326 | 2 January 1987 | Forwards Insp Rept 50-220/86-24 on 861103-07.No Violations Observed.Rept Identifies Addl Example of Concern Re Lack of Conformance to Approved Procedures (Ref Insp Rept 50-220/86-13) | |
ML20207N062 | 18 December 1986 | Forwards Insp Rept 50-220/86-13 on 860910-12 & 15-19. Concerns Raised Re Inadequacy of Control of Operations, Surveillance,Maint & Mod Activities.Actions to Control Vendor Technical Info Not Responsive to Generic Ltr 83-28 | |
ML20207N403 | 23 December 1986 | Forwards Notice of Violation from Investigation Rept 1-84-014.Investigation Conducted in Response to Allegations That Util QA Auditors Harassed & Intimidated as Result of Findings of QA Audit 84-4 Conducted in Jan & Feb 1984 | |
ML20207P397 | 13 January 1987 | Informs of Lasl 870323-26 Site Visit to Conduct Analysis in Order to Identify Areas in Which Sabotage Actions Could Result in Radiological Releases in Excess of 10CFR20 Limits. Listed Diagrams Should Be Provided to Lasl | |
ML20207Q357 | 14 January 1987 | Forwards Safety Evaluation Re MSIV Logic Mods Resulting from 861203 Full Scram,Per 861218 & 870106 Meetings.Mods Do Not Meet Requirements of 10CFR50,App A,Gdc 21 or IEEE Std 279.Issue Must Be Resolved Before Initial Criticality | |
ML20207R644 | 11 March 1987 | Forwards Safety Evaluation Re Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification.Program Acceptable.Eg&G Technical Evaluation Rept Encl | |
ML20207S424 | 9 March 1987 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-220/86-07 | Stroke time |
ML20207S589 | 12 March 1987 | Forwards Safety Insp Rept 50-410/87-06 on 870210-13.No Violations Noted.Steps Taken to Correct Deviation Noted in NRC Verified | |
ML20207S795 | 17 March 1987 | Forwards Exam Rept 50-410/86-69OL on 861210 | |
ML20210A538 | 19 December 1973 | Lists plant-specific Info Needed to Suppl GE NEDO-10859, Steam Vent Clearing Phenomena & Structural Response of BWR Torus (Apr 1973) & 730521 Errata & Addenda Sheet.Info Re Items 1 & 2 Requested within 30 & 60 Days,Respectively | Coatings |
ML20210D192 | 29 April 1987 | Advises That Operator Requalification Program Evaluation Scheduled for Wk of 870706,per Telcon.Ref Matl Listed in Encl 1 Should Be Furnished by 870511 | |
ML20210V251 | 28 May 1986 | Informs That Schedular Info,Received in Response to NRC 851001 Request,Inadequate to Allow Preplanning of Insp.Insp Program Will Be Planned Based on NRC Estimates of Facility Progress.Aug 1986 More Realistic Date for Fuel Load | |
ML20211A312 | 11 February 1987 | Forwards Insp Repts 50-220/86-26 & 50-410/86-65 on 861117-870104 & Notice of Violation.Activities Re Maint of Reactor Bldg Integrity & Corrective Action for Unplannned Scram While Shut Down Violated NRC Requirements | |
ML20211A916 | 4 February 1987 | Discusses Safety Insp Rept 50-410/86-56 on 861001-1116 & Forwards Notice of Violation.Violations Demonstrate Need for Addl Training & Improved Oversight of Operations to Assure That Plant Operated in Accordance W/Tech Specs | |
ML20211C296 | 16 October 1986 | Requests Rept of Evaluation Results for Control Room Environ Envelope & Ventilation Sys Designed to Maintain Temps & Pressures within Specified Limits,As Followup to Rj Jones Concern.Rept Should Be Expedited | |
ML20211F572 | 17 February 1987 | Forwards Radiological Controls Insp Repts 50-220/87-02 & 50-410/87-04 on 870112-16.No Violations Noted.Weaknesses in ALARA Program & in Control of Portal Monitors Identified | |
ML20211Q195 | 16 December 1986 | Requests Cooperation in Increasing NRC Resident Inspector Visibility at Site.Nrc Plans to Implement Showing of Videotaped Presentation Throughout Region I During General Employee Training | |
ML20212A300 | 16 December 1986 | Forwards Insp Rept 50-410/86-64 on 861117-21.No Violations Observed | |
ML20212G777 | 13 January 1987 | Forwards Safety Insp Rept 50-410/86-68 on 861208-12.No Violations Noted | |
ML20212H739 | 16 January 1987 | Forwards Insp Rept 50-410/86-67 on 861201-05.No Violations Observed | |
ML20212K999 | 22 January 1987 | Forwards Insp Repts 50-220/86-17 & 50-410/86-61 on 860825- 29.No Violations Noted.Programmatic Weaknesses in Mgt Sys Noted & Should Be Addressed.Enforcement Conference Will Be Scheduled to Discuss Apparent Violations & Weaknesses | |
ML20213E661 | 6 November 1986 | Requests Rept of Evaluation of Employment of GL Mcchain as QC Inspector at Facility & Possible Effect on Quality of Const of Facility.Mcchain,In Federal Custody for Parole Violations,Claims Welding Records Falsified | |
ML20213G220 | 12 November 1986 | Forwards Initial OL Review Rept 50-410/86-62 Based on Assessment of Plant Status from Regional Perspective | |
ML20214D101 | 14 November 1986 | Requests That Util Evaluate Concerns Re Telephone Access to Plant Computer & Provide NRC W/Results | |
ML20214F667 | 10 September 1986 | Notifies of 861029-30 Physical Protection Seminar in Cherry Hill,Nj to Discuss Results of 12-yr Implementation of 10CFR73 for Protection Against Radiological Sabotage. Preliminary Agenda Encl | Systematic Assessment of Licensee Performance |
ML20214M000 | 3 September 1986 | Forwards Emergency Preparedness Implementation Appraisal Rept 50-410/86-44 on 860804-06.No Violations Noted.One Item Requiring Corrective Action Identified | |
ML20214S547 | 4 June 1987 | Forwards Revised NRC Form 398, Personal Qualifications Statement - Licensee. Rev Made to Reflect Changes to 10CFR55 Effective 870526.All Applications for Licenses to Be Submitted on Revised Form as of 870526 | |
ML20214W950 | 5 December 1986 | Forwards Safety Insp Repts 50-220/86-22 & 50-410/86-58 on 861029.No Violations Noted.Licensee Demonstrated Adequate Ability to Implement Emergency Plan | |
ML20215L422 | 9 April 1985 | Requests Investigation of Employee Concern Re Improper Changes to Engineering Spec & Failure to Verify Fastener Torque for Gould safety-related Switchgear.Investigation Results & Any Corrective Actions Required within 30 Days | |
ML20215N484 | 29 October 1986 | Forwards Exam Rept 50-410/86-34OL of Exam Administered During Wk of 860722 | |
ML20235J131 | 23 September 1987 | Forwards Safety Insp Repts 50-220/87-15 & 50-410/87-24 on 870803-07.No Violations Noted | |
ML20235Q929 | 1 October 1987 | Forwards Combined Requalification & Replacement Exam Rept 50-410/87-18OL Administered on 870707-09.Final Program Evaluation Will Be Issued Following Next Set of Requalification Exams | |
ML20236B582 | 15 October 1987 | Forwards Exam Rept 50-220/87-16OL of Exam Administered During Wk of 870803.Related Info Also Encl | |
ML20236K070 | 29 July 1987 | Informs of Results of Review of Util Responses to Item 2.1, Generic Ltr 83-28, Equipment Classification & Vendor Interface (Reactor Trip Sys Components). Requirements Met | |
ML20237A334 | 8 December 1987 | Informs of Written & Operating Exams Scheduled for Wk of 880229.Requests That Ref Matl Listed in Encl Be Provided as Scheduled.Reactor Operator License Applications Should Be Submitted 30 Days Before First Exam | Shutdown Margin |
ML20237C109 | 11 December 1987 | Forwards Safety Insp Rept 50-220/87-22 on 871019-23.No Violations Noted |