MONTHYEARIR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) IR 05000317/20220062023-03-0101 March 2023 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2022006 and 05000318/2022006) ML23047A1022023-02-16016 February 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000317/2023401 and 05000318/2023401 ML23040A0102023-02-0909 February 2023 Notification of Commercial Grade Dedication Inspection (05000317/2023012 and 05000318/2023012) and Request for Information IR 05000317/20220052022-08-31031 August 2022 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2022005 and 05000318/2022005) ML22179A2112022-06-28028 June 2022 Notification of Conduct of a Fire Protection Team Inspection IR 05000317/20210062022-03-0202 March 2022 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2021006 and 05000318/2021006) IR 05000317/20210052021-09-0101 September 2021 Updated Inspection Plan for the Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2021005 and 05000318/2021005) ML21187A2232021-07-29029 July 2021 Temporary Instruction 2515/194 Inspection Documentation Request IR 05000317/20200062021-03-0303 March 2021 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2020006 and 05000318/2020006) ML21053A3142021-02-22022 February 2021 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000317/2021010 and 05000318/2021010 IR 05000317/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000317/2020005 and 05000318/2020005) ML20154K4602020-06-0202 June 2020 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000317/2020011 and 05000318/2020011 IR 05000317/20190062020-03-0303 March 2020 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2019006 and 05000318/2019006) IR 05000317/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000317/2019005 and 05000318/2019005) ML19141A1242019-05-21021 May 2019 Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information IR 05000317/20180062019-03-0404 March 2019 Annual Assessment Letter for the Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2018006 and 05000318/2018006) ML18348A4812018-12-13013 December 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000317/2019403 and 05000318/2019403 IR 05000317/20180052018-08-28028 August 2018 Updated Inspection Plan: Inspection Report 05000317/2018005 and 05000318/2018005 IR 05000317/20170062018-02-28028 February 2018 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2017006 and 05000318/2017006, Report 05000317/2017402 and 05000318/2017402, Report 05000317/2017501 and 05000318/2017501) IR 05000317/20170052017-08-28028 August 2017 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Inspection Report 05000317/2017005 and 05000318/2017005 IR 05000317/20160062017-03-0101 March 2017 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2016006 and 05000318/2016006) IR 05000317/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2, Report 05000317/2016005 and 05000318/2016005 IR 05000317/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2015006 and 05000318/2015006) IR 05000317/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317/2015005 and 05000318/2015005) IR 05000317/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2, (Report 05000317/2014001 and 05000318/2014001)(w/Inspection Plan) IR 05000317/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317-14-006 and 05000318-14-006) ML14206A9932014-07-25025 July 2014 Conrete Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. CCNPP-CHLE-010, Revision 1 IR 05000317/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317/2013001 and 05000318/2013001) (W/Inspection Plan) ML13267A0052013-09-23023 September 2013 Requal Program Inspection 60 Day Letter IR 05000317/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Calvert Cliffs Nuclear Power Plant Units 1 and 2 (Report 05000317-13-006 and 05000318-13-006) IR 05000317/20120012013-03-0404 March 2013 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 & 2 (Report 05000317-12-001 and 05000318-12-001) ML12244A2032012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Calvert Cliffs Nuclear Power Plant Units 1 and 2 IR 05000317/20110012012-03-0505 March 2012 Annual Assessment Letter(Report 05000317/2011001 and 05000318/2011001) ML1124208652011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Calvert Cliffs Nuclear Power Plant Units 1 and 2 IR 05000317/20100012011-03-0404 March 2011 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant-05000317/2010001 and 05000318/2010001 ML1031402312010-11-10010 November 2010 Pre-Inspection Cover Sheet and Inspection Plan (12/6/10 - 12/10/10) ML1024402082010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Calvert Cliffs Nuclear Power Plant ML1016600082010-06-15015 June 2010 Pre-Inspection Cover Sheet and Inspection Plan (6/7 - 6/11/10) ML1006208092010-03-0303 March 2010 Annual Assessment Letter ML0924402772009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Calvert Cliffs Nuclear Power Plant, Dated 09/01/2009 IR 05000317/20090012009-03-0404 March 2009 IR 05000317-09-001 and 05000318-09-001, on 01/01/2009 - 12/31/2008, Calvert Cliffs Nuclear Power Plant Annual Assessment Report IR 05000317/20080012008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, Calvert Cliffs, (IR 05000317-08-001 and 05000318-08-001) ML0806100132008-03-0303 March 2008 (05000317-08-001, 05000318-08-001, )Annual Assessment Letter EOC 2007 ROP8 ML0734707242007-12-13013 December 2007 ROP8 - Change to the Inspection Plan for the Calvert Cliffs Nuclear Power Plant ML0724309302007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Calvert Cliffs Nuclear Power Plant IR 05000317/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Calvert Cliffs Station (IR 05000317-07-001 and 05000318-07-001) ML0624304482006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan - Calvert Cliffs Nuclear Power Plant ML0606203372006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Calvert Cliffs Nuclear Power Plant (Report 05-317/2006001 and 05-318/2006001) 2024-08-29
[Table view] Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-29029 April 2024 Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-04-24024 April 2024 Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-12012 April 2024 Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank 2024-09-06
[Table view] |
Text
August 31, 2022
SUBJECT:
UPDATED INSPECTION PLAN FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2022005 AND 05000318/2022005)
Dear David Rhoades:
The enclosed inspection plan lists the inspections scheduled through June 30, 2024, for Calvert Cliffs Nuclear Power Plant, Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC)
provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI) 1 and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication, and an engineering inspection that reviews age-related degradation and management 2.
In response to the COVID19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process (ROP). While the PHE continues, overall conditions throughout the country support performance of our inspection and
Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the CETI inspection. Attached Report 22 will reference DBAI procedure until the CETI procedure is made publicly available. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from attached Report 22.
The age-related degradation and management procedure is under development and will be publicly available by the end of calendar year 2022.
D.Rhoades 2 oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions, and it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission. 3 For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
In addition to baseline inspections, the NRC plans to conduct Inspection Procedure 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection, at your facility.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5312 with any questions you have regarding this letter.
Sincerely, Digitally signed by Brice Brice A. A. Bickett Date: 2022.08.31 Bickett 07:08:15 -04'00'
Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety Docket Nos. 05000317 and 05000318 License Nos. DPR-53 and DPR-69 Enclosure:
Calvert Cliffs Inspection Plan cc w/encl: Distribution via ListServ 3This is discussed in our memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302), dated November 2, 2021.
ML22241A070 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DORS RI/DORS NAME PFinney BBickett DATE 08/29/22 08/29/22
Detailed Site Inspection Activity Calvert Cliffs 07/01/2022 - 06/30/2024 Unit Start End Activity CAC EPID # ADAMS # Title Staff Count FY22 Calvert Cliffs Initial Operator Examination 4 1,2 7/10/2022 7/22/2022 EXAD 000500 L-2022-OLL-0005 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Material Control and Accountability - Calvert Cliffs 1 1,2 8/8/2022 8/11/2022 IP 71130.11 000742 I-2022-401-0069 Material Control and Accounting (MC&A)
EP EXERCISE INSPECTION 5 1,2 9/12/2022 9/16/2022 IP 71114.01 000716 I-2022-501-0012 Exercise Evaluation 1,2 9/12/2022 9/16/2022 IP 71114.04 000719 I-2022-501-0012 Emergency Action Level and Emergency Plan Changes 1,2 9/12/2022 9/16/2022 IP 71151 001397 I-2022-501-0012 Performance Indicator Verification Rad Safety - Airborne, Dosimetry, & PIV 1 1,2 9/12/2022 9/16/2022 IP 71124.03 000727 I-2022-003-0030 In-Plant Airborne Radioactivity Control and Mitigation 1,2 9/12/2022 9/16/2022 IP 71124.04 000728 I-2022-003-0030 Occupational Dose Assessment 1,2 9/12/2022 9/16/2022 IP 71151 000746 I-2022-003-0030 Performance Indicator Verification Fire Protection - Calvert Cliffs 3 1,2 10/17/2022 10/21/2022 IP 71111.21N.05 001646 I-2022-010-0031 Fire Protection Team Inspection (FPTI)
1,2 10/31/2022 11/4/2022 IP 71111.21N.05 001646 I-2022-010-0031 Fire Protection Team Inspection (FPTI)
SEC, Access Control, Equip Perf, Sec Trng, Sec Plan rev, PI 3 1,2 11/14/2022 11/18/2022 IP 71130.02 000734 I-2022-402-0033 Access Control 1,2 11/14/2022 11/18/2022 IP 71130.04 000736 I-2022-402-0033 Equipment Performance, Testing, and Maintenance 1,2 11/14/2022 11/18/2022 IP 71130.07 000739 I-2022-402-0033 Security Training 1,2 11/14/2022 11/18/2022 IP 71130.09 001656 I-2022-402-0033 Security Plan Changes 1,2 11/14/2022 11/18/2022 IP 71151 001338 I-2022-402-0033 Performance Indicator Verification Inservice Inspection - Calvert Cliffs Unit 2 1 Prepared on 8/23/2022 8:25:33 AM 1 of 4 Enclosure
Detailed Site Inspection Activity 2 2/20/2023 3/3/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP - 71124.01 Rad Hazards 1 1,2 2/20/2023 2/24/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Access Control, AA, FFD Sec Plan Review, PI, ISFSI-CC 3 1,2 4/3/2023 4/7/2023 IP 71130.01 000733 Access Authorization 1,2 4/3/2023 4/7/2023 IP 71130.02 000734 Access Control 1,2 4/3/2023 4/7/2023 IP 71130.08 000740 Fitness For Duty Program 1,2 4/3/2023 4/7/2023 IP 71130.09 001656 Security Plan Changes 1,2 4/3/2023 4/7/2023 IP 71151 001338 Performance Indicator Verification 1,2 4/3/2023 4/7/2023 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations 10 CFR 50.69 - Risk Informed SSC Implementation - Calvert Cliffs 4 1,2 4/10/2023 4/14/2023 IP 37060 000521 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection 1,2 4/24/2023 4/28/2023 IP 37060 000521 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection RP - 71124.05 Instruments 1 1,2 4/10/2023 4/14/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation Commercial Grade Dedication- Calvert Cliffs 3 1,2 5/22/2023 5/26/2023 IP 71111.21N.03 001808 Commercial Grade Dedication 1,2 6/5/2023 6/9/2023 IP 71111.21N.03 001808 Commercial Grade Dedication FY23 Calvert Cliffs Initial License Exam 4 1,2 5/7/2023 5/12/2023 OV 000956 L-2023-OLL-0008 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1,2 6/4/2023 6/16/2023 EXAD 000500 L-2023-OLL-0008 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Cyber Security - Calvert Cliffs 4 1,2 8/21/2023 8/25/2023 IP 71130.10 000741 Cybersecurity Prepared on 8/23/2022 8:25:33 AM 2 of 4
Detailed Site Inspection Activity EP PROGRAM INSPECTION 1 1,2 9/11/2023 9/15/2023 IP 71114.02 000717 Alert and Notification System Testing 1,2 9/11/2023 9/15/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 9/11/2023 9/15/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 9/11/2023 9/15/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 9/11/2023 9/15/2023 IP 71151 001397 Performance Indicator Verification RP - 71124.08 Rad Waste and PIV 1 1,2 9/18/2023 9/22/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 9/18/2023 9/22/2023 IP 71151 000746 Performance Indicator Verification PI&R Team Inspection - CC 4 1,2 10/16/2023 10/20/2023 IP 71152B 000747 I-2023-010-0016 Problem Identification and Resolution 1,2 10/30/2023 11/3/2023 IP 71152B 000747 I-2023-010-0016 Problem Identification and Resolution Calvert Cliffs Requal Inspection with P/F Results 2 1,2 11/19/2023 11/24/2023 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1,2 11/19/2023 11/24/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Inservice Inspection - Calvert Cliffs Unit 1 1 1 2/12/2024 2/23/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP - 71124.01 Rad Hazards 1 1 2/12/2024 2/16/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Focused Engineering Inspection - Aging Related 3 1,2 4/8/2024 4/12/2024 IP 71111.21N.04 Age Related Focused Engineering Inspection 1,2 4/22/2024 4/26/2024 IP 71111.21N.04 Age Related Focused Engineering Inspection RP - 71124.03 Airborne and 71124.04 Dose 1 Prepared on 8/23/2022 8:25:33 AM 3 of 4
Detailed Site Inspection Activity 1,2 5/6/2024 5/10/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 5/6/2024 5/10/2024 IP 71124.04 000728 Occupational Dose Assessment FY24 Calvert Cliffs Initial License Examination 4 1,2 4/15/2024 4/19/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1,2 5/20/2024 5/24/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Access Control, Protective Strategy, TSR, SPR 4 1,2 6/24/2024 6/28/2024 IP 71130.02 000734 Access Control 1,2 6/24/2024 6/28/2024 IP 71130.05 000737 Protective Strategy Evaluation 1,2 6/24/2024 6/28/2024 IP 71130.09 001656 Security Plan Changes 1,2 6/24/2024 6/28/2024 IP 71130.14 000743 Review of Power Reactor Target Sets 1,2 6/24/2024 6/28/2024 IP 71151 001338 Performance Indicator Verification Prepared on 8/23/2022 8:25:33 AM 4 of 4