February 28, 2024

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORTS 05000317/2023006 AND 05000318/2023006)

Dear David Rhoades:

The U.S Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Calvert Cliffs Nuclear Power Plant (Calvert Cliffs), Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023 through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Calvert Cliffs Unit 2 during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Calvert Cliffs Unit 2.

The NRC determined the performance at Calvert Cliffs Unit 1 during the most recent quarter was within the Regulatory Response Column (Column 2) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Assessment Program. This conclusion was based on a single inspection finding having low-to-moderate safety significance (i.e., White) in the Mitigating Systems Cornerstone originating in the third quarter of 2023, and all PIs within the expected range (i.e., Green).

Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs. This inspection procedure is conducted to provide assurance that the root and contributing causes of risk significant performance issues are understood, the extent of condition and the extent of cause are identified, and the corrective actions are prompt and sufficient to prevent recurrence. On February 9, 2024, the NRC was notified of your readiness for the supplemental inspection to review the actions taken to address the performance issues. Therefore, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs, scheduled to start on March 18, 2024.

The enclosed inspection plan lists the inspections scheduled through December 31, 2025.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Brice Bickett at (610) 337-5312 with any questions you have regarding this letter.

Sincerely, Blake D. Welling, Director Division of Operating Reactor Safety

Docket Nos. 05000317 and 05000318 License Nos. DPR-53 and DPR-69

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV

Blake D.

Welling Digitally signed by Blake D. Welling Date: 2024.02.28 06:19:13 -05'00'

ML24057A197 X

SUNSI Review

X Non-Sensitive Sensitive

X Publicly Available

Non-Publicly Available

OFFICE RI/DORS RI/DORS RI/DORS

NAME RClagg BBickett BWelling

DATE 2/22/2024 2/26/2024 2/26/2024

Site Inspection Activity Plan Calvert Cliffs 01/01/2024 - 12/31/2025 Unit Start End Activity CAC Title Staff Count Inservice Inspection - Calvert Cliffs Unit 1

1 2/12/2024 2/23/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP - 71124.01 Rad Hazards

1,2 2/12/2024 2/16/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 95001 Supplemental Inspection - Calvert Cliffs Follow-up on Corrective Actions

1 3/18/2024 3/22/2024 IP 71153 000749 Follow Up of Events and Notices of Enforcement Discretion

3/18/2024 3/22/2024 IP 95001 000938 Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs Age Related Degradation - Calvert Cliffs

1,2 4/8/2024 4/12/2024 IP 71111.21N.04 001832 Age-Related Degradation 1,2 4/22/2024 4/26/2024 IP 71111.21N.04 001832 Age-Related Degradation RP - 71124.03 Airborne and 71124.04 Dose

1,2 5/6/2024 5/10/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 5/6/2024 5/10/2024 IP 71124.04 000728 Occupational Dose Assessment 2024 Calvert Cliffs Initial License Examination

1,2 5/13/2024 5/17/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1,2 6/10/2024 6/14/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Access Control, Protective Strategy, TSR, SPR

1,2 6/24/2024 6/28/2024 IP 71130.02 000734 Access Control 1,2 6/24/2024 6/28/2024 IP 71130.05 000737 Protective Strategy Evaluation 1,2 6/24/2024 6/28/2024 IP 71130.09 001656 Security Plan Changes 1,2 6/24/2024 6/28/2024 IP 71130.14 000743 Review of Power Reactor Target Sets 1,2 6/24/2024 6/28/2024 IP 71151 001338 Performance Indicator Verification ISFSI Loading Campaign Inspection (60855) - CC

1,2 8/5/2024 8/9/2024 IP 60855 001001 Operation Of An ISFSI EP Exercise Inspection - Calvert Cliffs

1,2 9/9/2024 9/13/2024 IP 71114.01 000716 Exercise Evaluation 1,2 9/9/2024 9/13/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 9/9/2024 9/13/2024 IP 71151 001397 Performance Indicator Verification RP - 71124.06 RETS and 71151 PIV

1,2 9/9/2024 9/13/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 9/9/2024 9/13/2024 IP 71151 000746 Performance Indicator Verification RP-71124.07-REMP

Prepared on 2/20/2024 11:00:11 AM 1 of 3

Site Inspection Activity Plan 1,2 9/23/2024 9/27/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program Inservice Inspection - Calvert Cliffs Unit 2

2 2/24/2025 3/7/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP-71124.01-RadHazard

2 3/3/2025 3/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Access Control, Equipment, Sec Trng, Sec Plan Review, PI - CC

1,2 3/31/2025 4/4/2025 IP 71130.02 000734 Access Control 1,2 3/31/2025 4/4/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 3/31/2025 4/4/2025 IP 71130.07 000739 Security Training 1,2 3/31/2025 4/4/2025 IP 71130.09 001656 Security Plan Changes 1,2 3/31/2025 4/4/2025 IP 71151 001338 Performance Indicator Verification Cyber Security - Calvert Cliffs

1,2 4/21/2025 4/25/2025 IP 71130.10 000741 Cybersecurity Comprehensive Engineering Team Inspection - Calvert Cliffs

1,2 6/9/2025 6/13/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2 6/23/2025 6/27/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 2025 CC Initial Operator Licensing Exam

1,2 5/5/2025 5/9/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1,2 6/23/2025 6/27/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Material Control and Accounting - Calvert Cliffs

1,2 8/11/2025 8/15/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)

EP Program Inspection - Calvert Cliffs

1,2 9/8/2025 9/12/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 9/8/2025 9/12/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 9/8/2025 9/12/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 9/8/2025 9/12/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 9/8/2025 9/12/2025 IP 71151 001397 Performance Indicator Verification PI&R Biennial Team Inspection - Calvert Cliffs

1,2 9/15/2025 9/19/2025 IP 71152B 000747 Problem Identification and Resolution 1,2 9/29/2025 10/3/2025 IP 71152B 000747 Problem Identification and Resolution RP-71124.08-Radwaste

1,2 10/6/2025 10/10/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - CC

1,2 10/6/2025 10/10/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 10/27/2025 10/31/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Prepared on 2/20/2024 11:00:11 AM 2 of 3

Site Inspection Activity Plan RP-71124.05-Instrumentation and IP-71151-PIV

1,2 11/3/2025 11/7/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 11/3/2025 11/7/2025 IP 71151 000746 Performance Indicator Verification CC Requal Inspection with P/F Results

1,2 11/17/2025 11/21/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1,2 11/17/2025 11/21/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Prepared on 2/20/2024 11:00:11 AM 3 of 3