ML17339B125

From kanterella
Revision as of 12:31, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Info Re Addl TMI-related Requirements Per 800507 Ltr.Includes Shift Manning,Revising Scope & Criteria of Licensing Exams,Procedures for Feedback of Operating Experience to Plant Staff & PWR Vendor Rept
ML17339B125
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/13/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
TASK-1.A.1.1, TASK-2.K.3.09, TASK-2.K.3.10, TASK-2.K.3.12, TASK-TM L-80-186, NUDOCS 8006200479
Download: ML17339B125 (5)


Text

I REGULATORY I RMATION DISTRIBUTION SYST (RIDS)ACCESSION NBRt8006200079 DOC~DATE: 80/06/13 NOTARIZED!

NO FACIL:50 250 Turkey Point Plantr'nit 3r Florida Power and Light C 50 251 Turkey Point Planti Unit qr Florida Power and Light C AUTH'AME AUTHOR AFFILIATION UHRIGr R~E, Florida Power 8 Light Co.REC IP~NAME RECIPIENT AFFILIATION ETSENHUTrD

~6.Division of Licensing

SUBJECT:

Forwards info re addi TMI r eleated requir ements per 800507 l t r,Includes shi f t manningr r evi sing scope 8 criteria of licensing examsiprocedures for feedback, of operating experience to plant staff 8 PlPR vendor reptDISTRIBUTION CODE: A039S COPIES RECEIYED:LTR g ENCL g SIZE: TITLE: Resp to Lesson Learn Task Force Nestinghouse I gr~ores.DOCKET 05000250 05000251:XTERNAL!ACRS NSIC 26 00 RECIPIENT ID CODE/NAME<CTION: BC t/RRGR]S.10 iNTERNAL;ANDERSONrN

~BURDIONi J~07 FIELDS'~I8E 17 LIC QUAL BR O'REILLYi P~OLSHINSKI r J~05 0 OR 23 EG 01 ISgC~08 COPIES LTTR ENCL 7 7 1.1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1'6 l 6 1 1 RECIPIENT ID CODE/NAME LPDR 03 AUX SYS BR 2A EMERG PREP 20 HUM FACT ENG BR KERRIGANr J~06 NRC PDR 02 OELD OP LIC BR PROC/TST REV 25 TELFORDrJeT

~I COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 1 2 2 1 1 JUN 23 1980 TOTAL NUMBER OF COPIES REQUIRED: LTTR 46 ENCL 45

P.O.BOX 529100, MIAMI, FL 33152 g4l~b~FLORIDA POWER&LIGHT COMPANY June 13, 1980 L-80-186 Office of Nuclear Reactor Regu1 a ti on Attention:;

Mr.Darrell G.Eisenhut, Director Division of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.

Dear MT.Eisenhut:

Re: Turkey Point Units 3 8 4 Docket Nos.50-250/50-251 Additional TMI-Related Re uirements The attached information is submitted in response to your letter of May 7, 1980.Very truly yours,.~de%>~Robert E.Uhrig Vice President Advanced Systems 5 Technology REU/MAS/paf Attachment cc: J.P.O'Reilly, Region II Harold F.Reis, Esquire Poxt 5 ii)5 6 0 6 2 p p g'7q PEOPLE...SERVING PEOPLE RKEY POINT UNITS 3 8i 4 1-C.5 Title Shift Manning Revise Scope 8 Criteria of Licensing Examinations, Procedures for Feedback of Operating Experience to Plant Staff Inst al 1 at i on and Test i ng of Automatic PORV Isolation System PklR Vendor Report on PORV Failure Reduction Reportirg Safety 8 Relief Valve Failures and Challenges Automatic Trip of Reactor Coolant Pumps During LOCA Re~sense The requirements of this item are to be supplied by the NRC.To date, we have not received the correspondence on this item referenced in th'e Hay 7, 1980 letter.FPL will respond to this item following receipt of the letter.FPL has not yet completed the review and assessment.

of the requirements of the referenced March 28, 1980 letter.4!e will respond to this item by August 1, 1980.FPL intends to comply" with the requirements of this item.However, the commitment to the implementation sched41e must be qualified pending our ability to provide additional man'power required to administer an appropriate operati ng experience feedback program.The implementat',on of this action item has been delayed until after the studies specified in item II.K.3.2 have been ccmpleted.

FPL will respond further at that time.FPL will support the vendor effort in this area, and submi t the required report.FPL intends to comply with the requirements of it's II.K.3.3>JCAP-9584 documents FPL'and Mestinghouse's position on the subject.FPL sees no need for further evaluation of the subject.Proportional Integral Derivative (PID)Controller Modification I'he controller used at Turkey Point 3 8 4 does not have the derivative function.Therefore, this item is not applicable.

IRKEY POINT UNITS 3&&Item II.K.3-10 I I-K~3~12 II.K.3.17 II.K.3.25 II.K.3-29 I I.Y..3.30 I I~K~3.31" II-V..3.44 I I-D.3.4 Ti tl e Proposed Antic i patory Trip Modification Confirm Existence of Anticipatory Trip Upon Turbine Trip Report on Outages of ECC Systems-Licensee Report and Proposed Technical Specification Changes Effect of Loss of AC Power on Pump Seals Study to Demonstrate Performance of Isolation Condensers with Non-Condens ib1 es Revised Small Break LOCA Methods to Show Compliance with 10CFf(50, App.f: Plant Specific Calculations to Show Compl i ance wi th 10CFR 50.46 Anticipated Transients with Single Failure to Verify No Fuel Failure Control Room Habitability Response This item is not applicable to Turkey Point 3 8 4.FPL will respond if modification is desired at a later date.FPL has confirmed the existence of the anticipatory trip upon turbine tri p.FPL intends to comply with the requiremetns of itei~I I.K.3.17.This item is identified in NUREG-0660 as applicable only to G.E.plants.This item is identified in iNUREG-0660 as applicable only to G~E.plants.f.PL intends to comply with the requirements of item II.K.3~30 subject to vendors ability to meet the schedule.FPl.intends to comply with the requirements of item II.K.3.31.

This item is identified in NUREG-0660 as applicable only ta G.E.Plants.FPL intends to comply with the requirements of item III.D.3.4.

i)OTE: The following items are applicable to thl 5 subml i.'cal~I I.K.3.13 through I I.K.3.16 II.V,.3.18 through II.K.3.22 I I.K.3.24 I I.K.3.27 I I.Y..3.28 II.K.3.45 I I.V" 3.46 I I.K.3~57, BMRs and are not addressed in