ML17339B125

From kanterella
Jump to navigation Jump to search
Forwards Info Re Addl TMI-related Requirements Per 800507 Ltr.Includes Shift Manning,Revising Scope & Criteria of Licensing Exams,Procedures for Feedback of Operating Experience to Plant Staff & PWR Vendor Rept
ML17339B125
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/13/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
TASK-1.A.1.1, TASK-2.K.3.09, TASK-2.K.3.10, TASK-2.K.3.12, TASK-TM L-80-186, NUDOCS 8006200479
Download: ML17339B125 (5)


Text

I REGULATORY I RMATION DISTRIBUTION SYST (RIDS)

ACCESSION NBRt8006200079 DOC DATE: 80/06/13 NOTARIZED! NO DOCKET FACIL:50 250 Turkey Point Plantr'nit

~

3r Florida Power and Light C 05000250 50 251 Turkey Point Planti Unit qr Florida Power and Light C 05000251 AUTH'AME AUTHOR AFFILIATION UHRIGr R ~ E, Florida Power 8 Light Co.

REC IP ~ NAME RECIPIENT AFFILIATION ETSENHUTrD ~ 6. Division of Licensing

SUBJECT:

Forwards info re addi TMI r eleated requir ements per 800507 l t r,Includes shi f t manningr r evi sing scope 8 criteria of licensing examsiprocedures for feedback, of operating experience to plant staff 8 PlPR vendor rept DISTRIBUTION CODE: A039S COPIES RECEIYED:LTR g ENCL g SIZE:

TITLE: Resp to Lesson Learn Task Force Nestinghouse I

gr ores. ~

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL

<CTION: BC t/RRGR] S. 10 7 7 iNTERNAL; ANDERSONrN ~ 1. 1 AUX SYS BR 2A 1 1 BURDIONi J ~ 07 1 1 EMERG PREP 20 1 1 FIELDS' ~ 1 1 HUM FACT ENG BR 1 1 I8E 17 2 2 KERRIGANr J ~ 06 1 LIC QUAL BR 1 1 NRC PDR 02 1 O'REILLYiP ~ 1 1 OELD 1 0 OLSHINSKI r J ~ 05 1 1 OP LIC BR 1 0 OR 23 1 1 PROC/TST REV 25 1 1 EG 01 1 1 TELFORDrJeT ~ 2 2 ISgC ~ 08 1 1 I

XTERNAL! ACRS 26 1'6 l6 LPDR 03 1 1 NSIC 00 1 1 JUN 23 1980 TOTAL NUMBER OF COPIES REQUIRED: LTTR 46 ENCL 45

P.O. BOX 529100, MIAMI, FL 33152 g4l~b~

FLORIDA POWER & LIGHT COMPANY June 13, 1980 L-80-186 Office of Nuclear Reactor Regu1 a ti on Attention:; Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

Dear MT. Eisenhut:

Re: Turkey Point Units 3 8 4 Docket Nos. 50-250/50-251 Additional TMI-Related Re uirements The attached information is submitted in response to your letter of May 7, 1980.

Very truly yours,

.~de%>~

Robert E. Uhrig Vice President Advanced Systems 5 Technology REU/MAS/paf Attachment cc: J. P. O'Reilly, Region II Harold F. Reis, Esquire Poxt 5

ii) 5 6 0 6 2 p p g'7q PEOPLE... SERVING PEOPLE

RKEY POINT UNITS 3 8i 4 Title Re~sense Shift Manning The requirements of this item are to be supplied by the NRC. To date, we have not received the correspondence on this item referenced in th'e Hay 7, 1980 letter. FPL will respond to this item following receipt of the letter.

Revise Scope 8 FPL has not yet completed the Criteria of Licensing review and assessment. of the Examinations, requirements of the referenced March 28, 1980 letter. 4!e will respond to this item by August 1, 1980.

1-C.5 Procedures for Feedback FPL intends to comply" with the of Operating Experience requirements of this item.

to Plant Staff However, the commitment to the implementation sched41e must be qualified pending our ability to provide additional man'power required to administer an appropriate operati ng experience feedback program.

Inst al 1 at i on and Test i ng The implementat',on of this action of Automatic PORV Isolation item has been delayed until after System the studies specified in item II.K.3.2 have been ccmpleted. FPL will respond further at that time.

PklR Vendor Report on PORV FPL will support the vendor effort Failure Reduction in this area, and submi t the required report.

Reportirg Safety 8 Relief FPL intends to comply with the Valve Failures and requirements of it's II.K.3.3 Challenges Automatic Trip of Reactor >JCAP-9584 documents FPL' Coolant Pumps During LOCA and Mestinghouse's position on the subject. FPL sees no need for further evaluation of the subject.

Proportional Integral I'he controller used at Turkey Point Derivative (PID) Controller 3 8 4 does not have the derivative Modification function. Therefore, this item is not applicable.

IRKEY POINT UNITS 3 & &

Item Ti tl e Response II.K.3-10 Proposed Antic i patory This item is not applicable to Trip Modification Turkey Point 3 8 4. FPL will respond if modification is desired at a later date.

I I- K ~ 3 ~ 12 Confirm Existence of FPL has confirmed the existence of Anticipatory Trip Upon the anticipatory trip upon turbine Turbine Trip tri p.

II.K.3.17 Report on Outages of ECC FPL intends to comply with the Systems-Licensee Report and requiremetns of itei~ I I.K.3.17.

Proposed Technical Specification Changes II.K.3.25 Effect of Loss of AC Power This item is identified in on Pump Seals NUREG-0660 as applicable only to G.E. plants.

II.K.3-29 Study to Demonstrate This item is identified in Performance of Isolation iNUREG-0660 as applicable only to Condensers with G~ E. plants.

Non-Condens ib1 es I I.Y.. 3. 30 Revised Small Break LOCA f.PL intends to comply with the Methods to Show Compliance requirements of item II.K.3 30 ~

with 10CFf( 50, App. f: subject to vendors ability to meet the schedule.

II ~ K~ 3. 31" Plant Specific Calculations FPl. intends to comply with the to Show Compl i ance wi th requirements of item II.K.3.31.

10CFR 50.46 II-V..3.44 Anticipated Transients with This item is identified in Single Failure to Verify No NUREG-0660 as applicable only ta Fuel Failure G.E. Plants.

I I- D. 3.4 Control Room Habitability FPL intends to comply with the requirements of item III.D.3.4.

i)OTE: The following items are applicable to BMRs and are not addressed in thl 5 subml i.'cal ~

I I.K.3.13 through I I.K. 3.16 II.V,.3.18 through II.K.3.22 I I. K. 3. 24 I I .K. 3. 27 I I.Y.. 3. 28 II.K.3.45 I I. V" 3. 46 I I. K. 3 57,

~