Ack Receipt of ,Transmitting Rev 29 to Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p). No NRC Approval Required for Some of Changes.Comments Re Testing of Specific Security Hatch Alarms,Provided
ML20199K936
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/04/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
References
NUDOCS 9802090058
Download: ML20199K936 (5)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

e g# "' Coe , UNIVE D STATE 5

  • .  % NUCLEAR REGULATORY COMMISSION REGION IV

%, f . 611 RY AN PL A.tA DRIVE. $UITE 400 a

  1. '6)

N#

, ***** . .b AR LINGTON. T E X AS 76011 8064 [

February 4, 1998 Otto L. Mayna:d, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation

, P.O. Box 411 Burlington, Kansas 66833 -

SUBJECT:

PHYSICAL SECURITY PLAN, REVISION 29

Dear Mr. Maynard:

This letter acknowledges receipt of your letter dated December 19,1997, which transmitted Revision 29 to the Wolf Creek Generating Station Security Plan, submitted under the provisions of 10 CFR G0.54(p).

Based on your determination that the changes do not decrease the effectiveness of your ate security plan, and after limited review of the changes, no NRC approvalis required for some of the changes, in accordance with 10 CFR 50.54(p). Implementation of these changes will be subject to inspection to confirm that the changes have no; decreased the effectiveness of your security plan.

This plan change involved, in part, the testing of specif!c security hatch alarms once per quar;er rather than once every 7 days. As a result, the frequency of security officers climbing ladders to test remote hatch alarms during inclement weather is reduced.

On January 29,1998, during a telephone conversation between Messrs. D. Erbe of your staff and D. Schaefer of this office, Mr. Schaefer noted that this matter had been discussed with the Office of Nuclear Reactor Regulation (NRR). The NRR etaff stated that the plan change improved the safe working conditions at the Wolf Creek Generating Station and was appropriate only for those hatch alarms located in areas ..wolving: (1) outdoor ladders associated with the possibility nf hazardous / unsafe weather conditions or (2) high iMoor ladoers. Mr. Erbe stated that this would be incorporated into a subsequent change to the security plan.

The enclosures to your letter contain Safeguards Information of a type specified in 10 CFR 73.21 and are being withheld from public disclosure.

4 SC2OI'c 11!!l1llR1l5,111ll1 9002090058 980204 PDR ADOCK 05000482 F PDR 1

-u -

. . . . . - . . _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ J

f : e. '

8 -,

Wolf Creek Nuclear Operating Corporation - i i

if you have any questions concoming this matter, please contact Mr. Dennis Schaefer of my

staff at (817) 860-8192.

i

, Sincerely, .

M '

I Bla;ne Murray, Chief, Phnt Support Branch i- Division of Reactor Safety Docket No.: 50482 i License No.: NPF-42 e

!- cc:

Chief Operating Officer i Wolf Creek Nuclear Operating Corp.

P.O. Box 411 o Burlington, Kansas 66839 r

4 Jay Silberg, Esq.

< Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW -

Washington, D.C. 20037 -

[ Supervisor Lkensing j, Wolf Creek Nuclear Operating Corp.-

P.O. Box 411

- Burlington', Kansas 66839 Chief Engineer Utilities Division Kansas Corporation CommissionL i 1500 SW Arrowhead Rd.

!: Topeka, Kansas 66604-4027-Office of the Govemor-

'~

State of Kansas j:+ Topeka. Kansas 66612 Attomey General

' Judicial Center I - 301 S.W.10th 2nd Floor Topeka, a isas 66612-1597

l.- .

Wolf Creek Nuclear Operating Corporation County Cler'k Coffey County Counhouse Burlington, Kansas 66839-1798 Vick L. Cooper, Chief Radiation Control Program Kansas Department of Health and Environment Bureau of Air and Radiation _

' Forbes Field Building 183 Topeka, Kansas CM20 Mr. Frank Mo.9u Division of Err.erger ey Preparedness 2800 SW Topaka Blvd Topeka,Kansaa 66611-1287

=

o l

Wolf Creek Nuclear Operating Corporation DISTFkfBuilON:

DMB (IE53)

Region Administrator Wolf Creek Resident inspector DRS Director DRS Deputy Director DRP Director SRI (Callaway, RIV)

Branch Chief (DRP/B)

Project Engineer (DRP/B)

Branch Chief DRS/PSB - e MIS System RIV Docket File Elaine Koup (NRR/DRPM/SGB, MS: 011E-22)

RITS Coordinator (Elko)

DRS\PSB Action Item File ((97-S-0031) i

  1. t

' 9Q

%p '

DOCUMENT NAME: G. SLTRS%l70031S.DWS TAC #XO3401

' To receive copy of document, Indicate in box: "c" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PSB E_ AGB/DRPM E C:DRS/PSB, l DWSchaefer:ntg/) RIM i'R FSkelton d BMMurray I) 02/ OA /98 '

02/ 01 /98 02/ 'l/ /98 OFFICIAL RECORD COPY

!a Wolf Creek Nuclear Operating Corporation DISTR @UTidN:

DMB41Rsf B@Ol Region Administrator Wolf Creek Resident inspector DRS Director DRS Deputy Director DRP Director SRI (Callaway, RIV)

Branch Chief (DRP/B)

Project Engineer (DRP/B)

Branch Chief DRS/PSB MIS System RIV Docket File Elaine Koup (NRR/DRPM/SGB, MS: 011E-22)

RITS Coordinator (Elko)

DRS\PSB Action item File ((97-S-0031) i

%I 8i DOCUMENT NAME: G:

VW SLTRS%l70031S.DWS TAC #X03401 h retelve co7 of document, Indi: ate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PSB E_ 4GB/DRPM E C:DRS/PSBJ l DWSchaefer:nhf)R!g[RFSkelton d BMMurray {}

02/ OA /98 ~ 02/ OA /98 02/ 'l/ /98 OFFICIAL RECORD COPY sj n,)