Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217E9711999-10-13013 October 1999 Submits Notification of Major Changes to Trojan Liquid Radioactive Waste Treatment Sys,Iaw PGE-1201.Detailed Description of Change Provided ML20217C8171999-10-0606 October 1999 Forwards Notice of Receipt of Availability for Comment & Meeting to Discuss License Termination Plan,Per 990805 Application ML20216F7621999-09-23023 September 1999 Forwards Corrected Response to Request 2 Contained in NRC 990920 RAI Re Application of Pacificorp for Transfer of License NPF-1.Response 2 Should Have Stated That Na General Partnership Is Partnership Formed in Nv ML20216F2871999-09-20020 September 1999 Informs NRC of Developments That Have Occurred Since 990524 Application Was Filed Re Pacificorp Transfer of License of FOL NPF-1.NRC Is Urged to Act & Approve Transaction Expeditiously by 990930.Supporting Documentation Encl ML20211Q3281999-09-0909 September 1999 Forwards Insp Rept 50-344/99-06 on 990630-0701,21 & 0408-08. No Violations Noted.Insp Conducted to Review Decommissioning Activities Underway at Trojan Site & to Accompany Shipment of Reactor Vessel to Hanford,Washington for Burial ML20211J2101999-08-30030 August 1999 Forwards Request for Addl Info Re Application for Approval of Proposed Corporate Merger of Pacificorp & Scottishpower ML20211B6611999-08-16016 August 1999 Forwards fitness-for-duty Program Performance Data Rept for Period of 990101-0630,IAW 10CFR26.71(d) ML20211B4091999-08-16016 August 1999 Forwards Environ Assessment & Finding No Significant Impact to Application for an Exemption & License Amend Dated 980129.Proposed Exemption & License Amend Would Delete Security Plan Requirements of 10CFR50.54(p) & 10CFR73.55 ML20211A7131999-08-16016 August 1999 Forwards Environ Assessment & Finding of No Significant Impact to Application for Exemption & License Amend Dtd 980827.Proposed Exemption & License Amend Would Delete EP Requirements of 10CFR50.54(q),10CFR50.47(b) & 10CFR50,app E ML20210R7691999-08-11011 August 1999 Forwards Proposed Rev 23 to PGE-8010, Trojan Nuclear QAP, in Response to NRC 990708 RAI Re Relocation of TS ACs to Qap.Revised QAP Will Be Made Effective Concurrently with Implementation of License Change Application Lca 245 ML20210H5971999-07-27027 July 1999 Forwards Notice of Consideration of Approval of Application Re Merger & Opportunity for Hearing.Notice Being Forwarded to Ofc of Fr for Publication ML20216D6611999-07-23023 July 1999 Submits Summary of Proprietary Submittals for Transtor Part 71 & Part 72 & Trojan ISFSI Applications ML20210F8601999-07-22022 July 1999 Forwards Rev 1 to PGE-1076, Trojan Reactor Vessel Package Sar. Changes to Rept Contained in Rev 1 Received NRC Approval by Ltr ML20210E3651999-07-22022 July 1999 Requests Registration as User of Trojan Reactor Vessel,Which Was Approved by NRC Under General License Issued,Per 10CFR71.12 on 981029 ML20210A6401999-07-19019 July 1999 Corrects Ref in Item 4 of Which Constitutes Rev 2 of Authorization from Wf Kane, for Trojan Reactor Vessel Package as Approved Package for Shipment Under General License,Subj to Listed Conditions ML20210A6231999-07-16016 July 1999 Submits Rev 1 of Authorization of Trojan Reactor Vessel Package for Transport,As Requested by 990601 Application,As Supplemented 990610,0707 & 13 ML20210B4481999-07-12012 July 1999 Forwards Rept Describing Effects of Earthquake That Occurred on 990702 Near Satsop,Wa,Iaw Trojan Nuclear Plant Defueled Sar,Section 4.1.3.1 ML20209D6231999-07-0808 July 1999 Forwards RAI Re Licensee 980827 Request for Amend That Would Delete Number of License Conditions & TS Requirements That Would Be Implemented After All Sf Has Been Removed from 10CFR50 Licensed Area.Response Requested within 30 Days ML20209D2291999-07-0707 July 1999 Forwards Drawing Changes for Proposed Rev to PGE-1076, Trojan Nuclear Plant SAR for Reactor Vessel Package. Each of Whole Series of Shielding Drawings (M-9259) & Impact Limiter Drawings (M-9260) Are Provided ML20209C6481999-07-0606 July 1999 Forwards Rev 8 to Defueled Sar,Including Changes Since Last Submittal.Attachment Includes Brief Description of Each Change Included in Rev ML20209B7821999-07-0101 July 1999 Responds to NRC 990609 RAI Re License Change Application 244 & Accompanying Request for Exemption.Detailed Info Supports Estimation of Remaining Radioactive Matl Previously Provided by Licensee ML20212J3281999-06-15015 June 1999 Forwards Amend 22 to PGE-1012, Trojan Nuclear Plant Fire Protection Plan, IAW 10CFR50.48(f).Amend Reflects Revs Made During Decommissioning Activities & Does Not Reduce Effectiveness of Fire Protection ML20195J0111999-06-0909 June 1999 Responds to Requesting License & Exemption Re Emergency Preparedness ML20207E6461999-06-0101 June 1999 Forwards Rev 1 to PGE-1076, Trojan Nuclear Plant SAR for Reactor Vessel Package, Which Represents Change in General License Conditions Specified in NRC Package Approval Ltr ML20207D3861999-06-0101 June 1999 Forwards Rev 1 to PGE-1077, Trojan Nuclear Plant Reactor Vessel & Internals Removal Project Transportation Safety Plan ML20207E6821999-06-0101 June 1999 Forwards Rev 1 to PGE-1077, Trojan Nuclear Plant Reactor Vessel & Internals Removal (Rvair) Project Transportation Safety Plan. Summary of Changes Are Contained in Attachment 1 to Ltr ML20196L1251999-05-24024 May 1999 Forwards Application for Amend to License NPF-1 for Indirect Transfer of License,To Extent That Such Approval Required Solely to Reflect Change in Upstream Economic Ownership of Pacificorp ML20207A2751999-05-14014 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Mgt Created.Organization Chart Encl ML20206N9411999-05-11011 May 1999 Forwards Revised Epips,Including Rev 7 to EPIP 3, Response Organization Checklists & Rev 9 to EPIP 5, Emergency Preparedness Test Propgram. Changes to EPIPs 3 & 5 Ref New Owners of on-site Railroad Line,Portland & Western Railroad ML20206J7931999-05-0707 May 1999 Forwards Insp Repts 50-344/99-04 & 72-0017/99-02 on 990322- 25 & 29-0408.One Violations Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20206J8681999-05-0707 May 1999 Forwards Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Insp Observed Work Activities Associated with Lifting of Reactor Vessel in Preparation for Removal & Shipment to Hanford Reservation for Burial ML20206H4331999-05-0505 May 1999 Forwards Amend 201 to License NPF-1 & Se.Amend Revises PDTSs by Deleting ISFSI Area,Revises Subsection 4.1.1,replaces Figure 4.1-1 with New Figure 4.1-1 & Adds New Page to Figure 4.1-1 to Reflect Access Control (ISFSI) Area ML20206N1571999-05-0404 May 1999 Forwards Util Quarterly Decommissioning Status Rept for First Quarter of 1999,IAW State of or Energy Facility Siting Council Order Approving Trojan Decommissioning Plan, ML20206E1731999-04-29029 April 1999 Informs That NRC Staff Has Performed an Acceptance Review of Trojan Nuclear Plant License Termination Plan,Submitted by ,To Determine Whether LTP Provides Adequate Info to Allow Staff to Conduct Detailed Review ML20206E0211999-04-28028 April 1999 Forwards Copy of Environ Assessment & Finding of No Significant Impact Re 970212 Application for Amend.Proposed Amend Would Revise Trojan Permanently Defueled TS to Delete ISFSI Area ML20206C9221999-04-23023 April 1999 Forwards Amend 199 to License NPF-1 & Safety Evaluation. Amend Changes License NPF-1 by Adding New License Condition Entitled, Loading of Fuel Into Casks in Fuel Building ML20206C9591999-04-23023 April 1999 Forwards Amend 200 to License NPF-1 & Safety Evaluation. Amend Changes License NPF-1 by Revising License Condition 2.C.(10), Loading of Fuel Into Casks in Fuel Building ML20205S9761999-04-21021 April 1999 Forwards Trojan Nuclear Plant,Radiological Environ Monitoring Rept for CY98. Rept Submitted in Accordance with Trojan Permanently Defueled TS 5.8.1.2 & Sections IV.B.2, IV.B.3 & Iv.C of App I to Title 10CFR50 ML20205T5471999-04-20020 April 1999 Forwards Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted ML20205N9061999-04-13013 April 1999 Forwards Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted.Inspectors Examined Portions of Physical Security, Access Authorization & FFD Programs ML20205P7301999-04-0808 April 1999 Forwards PGE-1009-98, Operational Ecological Monitoring Program for TNP,Jan-Dec 1998, Including All Existing non-radiological Effluents ML20205S6201999-04-0606 April 1999 Forwards Proposed Rev to PGE-1077, Trojan Nuclear Plant Reactor Vessel & Internals Removal Project Transportation Safety Plan, for or Ofc of Energy Review & Approval ML20205B3661999-03-25025 March 1999 Transmits Completed Application for Renewal of NPDES Permit for Trojan Nuclear Plant,Iaw License NPF-1,App B,Epp,Section 3.2 ML20204G1781999-03-18018 March 1999 Forwards Rev 4 to PGE-1063, Suppl to Applicants Environ Rept - Post Operating License Stage ML20204B7551999-03-18018 March 1999 Forwards Updated TS 5.6 Re High Radiation Area,Per Telcons with Nrc.Justification for TS Was Provided Previously with Util Ltr Dtd 990317,but Has Been Updated & Is Included as Encl 2 ML20204C5151999-03-17017 March 1999 Forwards Licensee Comments on NRC Preliminary SER & License Re Trojan Isfsi.Encl Includes Justification for Inclusion in ISFSI TS of Alternative Method to 10CFR20.1601(c) for Controlling Access to High Radiation Areas ML20207J3721999-03-10010 March 1999 Forwards License Amend Application 247 Requesting Amend to License NPF-1 to Add License Condition Denoting NRC Approval of PGE-1078, Trojan Nuclear Plant License Termination Plan, Also Encl.With Certificate of Svc ML20207L0011999-03-0808 March 1999 Transmits Tnp co-owners Annual Rept of Status of Decommissioning Funding for Tnp.Rept Is Based on Most Recent Analysis of Tnp Decommissioning Estimate & Funding Plan,Per Rev 6 to Pge, Tnp Decommissioning Plan ML20207G9691999-03-0303 March 1999 Forwards Rev 6 to PGE-1061, Trojan Nuclear Plant Decommissioning Plan. Summary of Changes,Attached.Revised Portions Denoted by Side Bars ML20207D7751999-03-0202 March 1999 Forwards Amend 21 to PGE-1012, Trojan Nuclear Plant Fire Protection Plan, Per 10CFR50.48(f).Amend Reflects Revs Made During Decommissioning Activities 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217C8171999-10-0606 October 1999 Forwards Notice of Receipt of Availability for Comment & Meeting to Discuss License Termination Plan,Per 990805 Application ML20211Q3281999-09-0909 September 1999 Forwards Insp Rept 50-344/99-06 on 990630-0701,21 & 0408-08. No Violations Noted.Insp Conducted to Review Decommissioning Activities Underway at Trojan Site & to Accompany Shipment of Reactor Vessel to Hanford,Washington for Burial ML20211J2101999-08-30030 August 1999 Forwards Request for Addl Info Re Application for Approval of Proposed Corporate Merger of Pacificorp & Scottishpower ML20211B4091999-08-16016 August 1999 Forwards Environ Assessment & Finding No Significant Impact to Application for an Exemption & License Amend Dated 980129.Proposed Exemption & License Amend Would Delete Security Plan Requirements of 10CFR50.54(p) & 10CFR73.55 ML20211A7131999-08-16016 August 1999 Forwards Environ Assessment & Finding of No Significant Impact to Application for Exemption & License Amend Dtd 980827.Proposed Exemption & License Amend Would Delete EP Requirements of 10CFR50.54(q),10CFR50.47(b) & 10CFR50,app E ML20210H5971999-07-27027 July 1999 Forwards Notice of Consideration of Approval of Application Re Merger & Opportunity for Hearing.Notice Being Forwarded to Ofc of Fr for Publication ML20210A6401999-07-19019 July 1999 Corrects Ref in Item 4 of Which Constitutes Rev 2 of Authorization from Wf Kane, for Trojan Reactor Vessel Package as Approved Package for Shipment Under General License,Subj to Listed Conditions ML20210A6231999-07-16016 July 1999 Submits Rev 1 of Authorization of Trojan Reactor Vessel Package for Transport,As Requested by 990601 Application,As Supplemented 990610,0707 & 13 ML20209D6231999-07-0808 July 1999 Forwards RAI Re Licensee 980827 Request for Amend That Would Delete Number of License Conditions & TS Requirements That Would Be Implemented After All Sf Has Been Removed from 10CFR50 Licensed Area.Response Requested within 30 Days ML20195J0111999-06-0909 June 1999 Responds to Requesting License & Exemption Re Emergency Preparedness ML20207A2751999-05-14014 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Mgt Created.Organization Chart Encl ML20206J7931999-05-0707 May 1999 Forwards Insp Repts 50-344/99-04 & 72-0017/99-02 on 990322- 25 & 29-0408.One Violations Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20206J8681999-05-0707 May 1999 Forwards Insp Repts 50-344/99-05 & 72-0017/99-04 on 990419-22.No Violations Noted.Insp Observed Work Activities Associated with Lifting of Reactor Vessel in Preparation for Removal & Shipment to Hanford Reservation for Burial ML20206H4331999-05-0505 May 1999 Forwards Amend 201 to License NPF-1 & Se.Amend Revises PDTSs by Deleting ISFSI Area,Revises Subsection 4.1.1,replaces Figure 4.1-1 with New Figure 4.1-1 & Adds New Page to Figure 4.1-1 to Reflect Access Control (ISFSI) Area ML20206E1731999-04-29029 April 1999 Informs That NRC Staff Has Performed an Acceptance Review of Trojan Nuclear Plant License Termination Plan,Submitted by ,To Determine Whether LTP Provides Adequate Info to Allow Staff to Conduct Detailed Review ML20206E0211999-04-28028 April 1999 Forwards Copy of Environ Assessment & Finding of No Significant Impact Re 970212 Application for Amend.Proposed Amend Would Revise Trojan Permanently Defueled TS to Delete ISFSI Area ML20206C9591999-04-23023 April 1999 Forwards Amend 200 to License NPF-1 & Safety Evaluation. Amend Changes License NPF-1 by Revising License Condition 2.C.(10), Loading of Fuel Into Casks in Fuel Building ML20206C9221999-04-23023 April 1999 Forwards Amend 199 to License NPF-1 & Safety Evaluation. Amend Changes License NPF-1 by Adding New License Condition Entitled, Loading of Fuel Into Casks in Fuel Building ML20205T5471999-04-20020 April 1999 Forwards Insp Repts 50-344/99-03 & 72-0017/99-03 on 990301-04,15-18 & 22-25.No Violations Noted ML20205N9061999-04-13013 April 1999 Forwards Insp Rept 50-344/99-02 on 990329-0401.No Violations Noted.Inspectors Examined Portions of Physical Security, Access Authorization & FFD Programs ML20202C1621999-01-21021 January 1999 Forwards Insp Repts 50-344/98-04 & 72-0017/98-01 & NOV Re Inadequate Actions Taken by Radiation Protection Technician to Ensure That Radiological Conditions Safe Prior to Removing Warning Signs for Airborne Radioactivity Area ML20198E9871998-12-21021 December 1998 Informs That NRC Staff Acks Delay & Understands Bnfl Fuel Solutions Will Submit Revised Schedule for Responding to Second Transtor Shipping Cask RAI No Later than 981231. Current Schedule Last Updated on 981030 ML20198S1661998-12-17017 December 1998 Final Response to FOIA Request for Documents.Records Encl & Identified in App C & D.App E Records Withheld in Part & App F Records Withheld in Entirety (Ref FOIA Exemption 5) & App G Records Withheld in Entirety (Ref FOIA Exemptions 4 & 5) ML20195D9471998-11-0404 November 1998 Informs of NRC Final Decision on Portland General Electric Co Request for Approval of one-time Shipment of Decommissioned Rv Package from Trojan Nuclear Power Plant Near Richland,Wa.Commission Approved Request on 981022 ML20155F6471998-11-0202 November 1998 Informs of NRC Final Decision on Portland General Electric Co Request for Approval of one-time Shipment of Decommissioned Rv Package from Tnp Near Ranier,Or to Disposal Site at Hanford Nuclear Reservation ML20155G7371998-10-30030 October 1998 Forwards Insp Rept 50-344/98-202 on 980831-0903. No Violations Noted.Insp Program Covered Maint Program, Safety Review Program & Follow Up on Previous Inspector Follow Items Re Modular Sf Cooling Sys ML20155H0171998-10-29029 October 1998 Informs of Us NRC Final Decision on Poge Request for Approval of one-time Shipment of Decommissioned Reactor Vessel Package from Trojan Nuclear Power Plant,To Disposal Site at Hanford Nuclear Reservation,Near Richland.Wa ML20155F6001998-10-29029 October 1998 Informs of NRC Final Decision on Portland General Electric Co Request for Approval of one-time Shipment of Decommissioned Rv Package from Plant Near Ranier,Or Disposal Site at Hanford Nuclear Reservation ML20155E0491998-10-29029 October 1998 Forwards SER Granting Two Specific Exemptions Under 10CFR71.8 for Approval of Trojan Reactor Vessel Package for one-time Shipment to Us Ecology Disposal Facility Near Richland,Wa ML20151Z6461998-09-17017 September 1998 Refers to Insp Rept 50-344/98-02 Issued on 980701 Re Modular Spent Fuel Pool Cooling Sys.Info Provided in Re New Spent Fuel Pool Sys Reviewed.Insp 50-344/98-03 & 50-344/98-202 Also Included Reviews of Sys Design & Testing ML20151Y8761998-09-11011 September 1998 Responds to Re NRC Efforts on Review Activities for Proposed one-time Shipment of Trojan Reactor Vessel,For Disposal.Nrc decision-making Process Acting in Parrallel & in Concert with Other Necessary Approvals ML20237F1281998-08-27027 August 1998 First Partial Response to FOIA Request for Documents. Forwards App a Records Already Available in Pdr.App B Records Being Made Available in PDR ML20237E5781998-08-25025 August 1998 Forwards Insp Rept 50-344/98-03 on 980727-30.No Violations Noted ML20237B4271998-08-14014 August 1998 Expresses Appreciation for Contribution to NRC Public Meeting Held in Kelso,Wa on 980730 Re Proposed One Time Shipment of Trojan Decommissioned Rv for Disposal ML20237A4101998-08-11011 August 1998 Forwards RAI Re Plant Request for Amend to Support Repowering Site W/Natural Gas Fired,Combined Cycle Turbines. Response Requested to Be Provided within 60 Days of Date of Ltr ML20236T5651998-07-21021 July 1998 Responds to to Chairman Jackson Expressing Concern W/Nrc Schedules for Reviewing Portland General Electric Co Applications for on-site Sf Storage & for one-time Shipment of Reactor Vessel ML20236P1461998-07-0909 July 1998 Responds to Application, for Approval of one-time Shipment of Trojan Reactor Vessel Package (Trvp) to Us Ecology Radwaste Disposal Facility on Hanford Nuclear Reservation Near Richland,Washington.Requested Info Encl ML20236G9671998-07-0101 July 1998 Forwards Insp Rept 50-344/98-02 on 980601-04.No Violations Noted.Plans to Replace Existing Spent Fuel cooling,make-up Water & clean-up Sys W/New Self Contained Sys Were Discussed W/Staff ML20249B8581998-06-18018 June 1998 Informs That Tj Kobetz Has Assumed Project Management Responsbilities for Proposed Trojan Isfsi.Communications W/ NRC Should Be Directed to Tj Kobetz.Written Correspondence Should Continue to Go DCD ML20247N6681998-05-22022 May 1998 Forwards Insp Rept 50-344/98-01 on 980504-07.No Violations Noted.Insp Focused on Physical Security Program ML20217L0571998-04-29029 April 1998 Forwards Insp Rept 50-344/98-201 on 980223-26.No Violations Noted.Specific Areas Examined Included Training & Certification of Qualified Evaluators,Independent Reviewers & Independent Safety Reviewers;Procedural Controls IR 05000344/19970051998-03-25025 March 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-344/97-05.Actions Will Be Reviewed During Future Insp to Determine That Full Compliance Has Been Achieved & Will Be Maintained ML20217A5491998-03-18018 March 1998 Submits Update on Actions Taken by NRC Since 970613 Response Re Portland General Electric Co Request for Approval of 1-time Shipment of Decommissioned Reactor Vessel.Two Issues Identified for Review in Utility Request,Submitted ML20217A4221998-03-11011 March 1998 Submits Update on Actions Taken by NRC Since 970613 Response Re Portland General Electric Co Request for Approval of one-time Shipment of Decommissioned Reactor Vessel.Two Issues for Review in Utility Request Submitted ML20202J0741998-02-18018 February 1998 Grants Request for Extension of Response to NOV in Insp Rept 50-344/97-05.New Response Deadline 980317 ML20203A9061998-02-18018 February 1998 Informs of 980209 Meeting W/Poge in Region IV to Discuss Proposed Changes to Security Provisions for Protected Area at Plant.List of Attendees & Handouts Provided by Util Encl ML20202C1791998-02-0909 February 1998 Returns Responses to 970731 RAI-2 Re 960326 Application for Trojan Isfsi,Due to Overall Poor Quality.Proprietary Documents Are Being Returned Under Separate Cover as Required Affidavits Were Not Provided ML20203F4661998-01-30030 January 1998 Requests That Staff Ask Us Ecology,In Coordination W/Portland General Electric Co,To Perform Comprehensive & Defensible Pathways Analysis to Demonstrate Suitability of Proposed Wastes for Disposal at Hanford Disposal Site ML20199D7481998-01-23023 January 1998 Forwards Omitted Cover Page for Insp Rept 50-344/97-05 on 971201-03 ML20199F0021998-01-23023 January 1998 Forwards Omitted Page of Insp Rept 50-344/97-05 1999-09-09
[Table view] |
Text
. - - --._- -- . -.
May 19, 1997 Mr. Stephen M. Quennoz Portland General Electric Company Trojan Nuclear Plant 71760 Columbia River Highway Rainier, OR 97048
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION - SAFETY ANALYSIS REPORT FOR REACTOR VESSEL PACKAGE
Dear Mr. Quennoz:
This refers to your request for a Certificate of Compliance for the one-time shipment of the Trojan Reactor Vessel Package dated March 31,1997. We have determined that we need additional information or clarification to complete our review of the safety analysis report attached to your March 31,1997 submittal. Please provide responses to the enclosed Request for Additional Information within 30 dayr, of the date of this letter. This is the first request for additional information pertaining to your submittal and deals only with the issue of waste classification. ,
in accordance with 10 CFR 50.30(b), your response to the enclosed Request for Additional Information must be executed in a signed original under oath or affirmation. ,
This requirement affects nine or fewer respondents and, therefore, is not subject to Office of Management and Budget review under P.L.96-511.
Sincerely Original signed by: Michael Masnik for ,
Lee H. Thonus, Pioject Manager Non-Power Reactors and Decommissioning i
Project Directorate Office of Nuclear Reactor Regulation r
1.- Docket No. 50-344 ;
Enclosure:
As stated cc w/ enclosure:
See next page
, f DISTRIBUTION:
Docket File 50-344 MMendonca OGC (015-B-18) .
PUBLIC ' MMasnik MWebber PDND r/f EHylton Region IV MSlosson LThonus RDudley MFairtile TFredrichs PHarris MWebb PDND:PIM LA 230058PDND:(A)S PDND:(A)D vtz.
JThonus F lion MMasnik e MMendonca O/ El/97 f////97 5 /(7/97 f //j/97 OFFICIAL RECORD COPY DOCUMENT NAME: GnSECY\THONUS\TRORV.Q1S 7
9705230266 970519 PDR P
ADOCK 05000344 PDR hh e h
r .
g; y. %
.[ ,
- 4. UNITED STATES E E NUCLEAR REGUL/ TORY COMMISSION i
4E WASHINoToN, D.C, 2055'r@01
% ,,,,, ' May 19,'1997 Mr. Stephen M. Quennoz Portland General Electric Company Trojan Nuclear Plant 71760 Columbia River Highway Rainier, OR 97048
SUBJECT:
REQUEST FOR ADDITIO 4AL INFORMATION - SAFETY ANALYSIS REPORT FOR REACTOR VESSEL PACKAGE
Dear Mr. Quennoz:
This refers to your request for a Certificate of Compliance for the one-time shipment of the Trojan Reactor Vessel Package dated March 31,1997. We have determined that we need additional information or clarification to complete our review of the safety analysis report attached to your March 31,1997 submittal. Please provide responses to the enclosed Request for Additional information wnhin 30 days of the dcte of this letter. This is the first request for additional information periaining to your submittal and deals only with the issue of waste classification.
In accordance with 10 CFR 50.30(b), your response to the enclosed Request for Additional Information must be executed in a signed original under oath or affirmation.
This requirement affects nine or fewer respondents and, therefore, is not subject to Office of '
Management and Budget review under P.L.96-511.
i Sincerely .
pgM214 !
Lee H. Thonus, Project Manager Non-Power Reactors and Decommissioning Project Directorate Office of Nuclear Reactor Regulation Docket No. 50-344
Enclosure:
As stated cc w/ enclosure: ,
Sea next page i
i 4
Mr. Stephen H. Quennoz Trojan Nuclear Plant Portland General Electric Company Docket No. 50-344 cc:
Chairman of the Board of County
- Commi s sioners Columbia County St. Helens, Oregon 97501 Mr. David Stewart-Smith Oregon Department of Energy 625 Marion Street, N.E.
Salem, Oregon 97310 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower and Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. H. Ray Pate Manager Licensing, Compliance and Commitment Management Portland General Electric Company Trojan Nuclear Plant 71760 Columbia River Highway Rainier, Oregon 97048 Mr. Lloyd K. Marbet 19142 S.E. Bakers Ferry Road Boring, Oregon 97009 Mr. Jerry Wilson Do It Yourself Committee 570 N.E. 53rd Hillsboro, Oregon 97124 Mr. Eugene Rosolie Northwest Environmental Advocates 302 Haseltine Building 133 S.W. 2nd Avenue Portland, Oregon 97204
REQUEST FOR ADDITIONAL INFORMATION TROJAN CERTIFICATE OF COMPLIANCE APPLICATION SHIPMENT OF THE REACTOR VESSEL PACKAGE
- 1. Provide the basis for the statement that the reactor vesselinternals comprise 340 cubic feet of Greater Than Class C Waste. This statement criginally appeared in your submittal dated January 30,1997 entitled " Reactor Vessel and Internals Removal Plan". Specifically, identify the internals in the reactor vessel, the displaced volumes of each internal component, the radionuclide activities for each component, and describe how the radionuclide activities were calculated.
- 2. Provide the methodology and results of the waste classification for the pressure vessel with the internals intact. Describe how the waste classification conforms to the recommendations in Section 3.3 of the Branch Technical Position on Concentration Averaging and Encapsulation (BTP), datad January 17,1995. Demonstrate that the waste classification considered each of the internal components as a separate entity in the averaging.