ML20062E324

From kanterella
Revision as of 01:12, 1 April 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Environ Event Rept 78-11 on Cooling Tower Oper for Nov 1978.Slightly Elevated Blowdown Flow Req for 3 Days, During Month to Accomodate Cooling Sys Preventative Maint Work
ML20062E324
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/01/1978
From: Ward E
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 7812060141
Download: ML20062E324 (1)


Text

s' e, n

"_, - / L 4-.

s m - -

, 1 D32 BED c LM NORTiERN STATES POWER COMPANY u r N % r A p o t.e s m i n N e s ora s s .a o i December 1, 1978 s \

h . $. a,

!!r J G Keppler, Director, Region III est.V s L3 office of Inspection 6 Enforcement

(

'j U S Nuclear Her,ulatory Comnission .

799 koosevelt Road U

Clen Ellyn, IL 60137 f

\

'a Js 7J^'yh

Dear >tr Keppler:

-) Je PRAIRIE ISI,2i!DSQLEAR GENERATI:;G Pl.A';T Q' . S' Docket No.(50 g ) License No. DPR-42

  • 50-306 DPR-60 Environmental Event Report 78-11 Coolla? Tower Operations - :;ovember Under TS B-5.4.2.A. we are furnishing two copies of this Environmental Event Report covering, operation of the plant circulatin;; water system in the partial recycle mode with daily average blowdown flow in excess of 150 cis.

511 gh t i:. elevated blowdown flow (175-300 cfs) was required for three days (November 4, 5 and 10) du rin;; the month to accommodate cooling system preventative maintenance work.

Yours very truly,

(

s k l \

%IL46 F C Ward, PE Manager - :;nclear Environwntal Services EC'dlah cc: Director, ;i!R c/o DSB (11)

Sti'C A atta: .I W Ferran 0 N 0 f;  ;