ML19309C990

From kanterella
Revision as of 11:44, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-015/03L-0
ML19309C990
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/03/1980
From: Calhoun J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19309C991 List:
References
NUDOCS 8004090453
Download: ML19309C990 (1)


Text

i

) .

TE: .NESE EE V ALLEY A UT'-iCRIT'r

..a r w cc c e Tcw szz rw 716 Edney Building
  • 9 APR 0 31980 Mr. James P. O'Railly, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region 11 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT UNIT 1 - DOCKET No. 50-327 - FACILITY OPERATING LICENSE DPR REPORTABLE OCCURRENCE REPORT SQRO-50-327/8015 The enclosed report provides details concerning inadequate monitoring of pressure differential across steam generators. This report is submitted in accordance with Sequoyah unit 1 Technical Specification 6.9.1.13.c.

Very truly yours, TENNESSEE VALLEY AUTHORITY J. R. Calhoun Director of Nuclear Power Enclosure (3) cc (Enclosure):

Director (3)

Of fice of Management Informatica and Program Control 88 S. Nucles; negulatory Connaission Ummhtneron. DC 70555 l

Director (40) ,

Office of Inspection and Enforcement l U.S. Nuclear Regulatory Commission i Washington, DC 20555 Mr. Bill Lavallee Nuclear Safety Analysis Center Palo Alto, California 94303 Mr. W. T. Cottle, NRC Inspector, Sequoyah 09

.s

//

l l

i 8004000 t