Summary of Telephone Conference Call Held on May 20, 2009, Between the USNRC Staff and NPPD, Related to a Clarification on Certain RAI (RAI B.1.15-3 and RAI B.1.15-4), for CNS Renewal
ML091560496
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/10/2009
From: Tam Tran
License Renewal Projects Branch 1
To:
tran t, NRR/RPB1, 415-3617
References
Download: ML091560496 (8)


Text

June 10, 2009 LICENSEE: Nebraska Public Power District FACILITY: Cooper Nuclear Station Power Plant

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON MAY 20, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND NEBRASKA PUBLIC POWER DISTRICT, RELATED TO A CLARIFICATION ON CERTAIN REQUESTS FOR ADDITIONAL INFORMATION, FOR COOPER NUCLEAR STATION LICENSE RENEWAL The U.S. NRC staff and representatives of Nebraska Public Power District held a telephone conference call on May 20, 2009, to discuss clarifications for certain draft requests for additional information for Cooper Nuclear Station license renewal. provides a listing of the participants, and Enclosure 2 contains a brief description of the conference call.

The applicant had an opportunity to comment on this summary.

/RA/

Tam Tran, Project Manager License Renewal Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-298

Enclosures:

As stated cc w/encls: See next page

(s): ML091560496 OFFICE LA:DLR PM:RPB1:DLR PM:RPB2:DLR BC:RPB1:DLR NAME SFigueroa T. Tran E. Sayoc D. Pelton (D. Ashley for)

DATE 06/10/09 0610/09 06/10/09 06/10/09 LIST OF PARTICIPANTS FROM THE TELEPHONE CONFERENCE CALL FOR COOPER NUCLEAR STATION LICENSE RENEWAL APPLICATION MAY 20, 2009 PARTICIPANTS AFFILIATIONS Tam Tran U.S. Nuclear Regulatory Commission (NRC)

Chuang-Yeh Yang NRC Dave Bremer Nebraska Public Power District (NPPD)

Jim Loynes NPPD Ken Thomas NPPD Dave Lach Entergy Alan Cox Entergy Ted Ivy Entergy Ron Finnin Entergy (Areva)

ENCLOSURE 1

COOPER NUCLEAR STATION POWER PLANT LICENSE RENEWAL APPLICATION (Brief description of the conference call)

The U.S. Nuclear Regulatory Commission staff and representatives of Nebraska Public Power District (NPPD), held a telephone conference call on May 20, 2009, to discuss clarifications for certain draft requests for additional information listed below.

Discussion:

RAI B.1.15-9 (Draft)

Based on the conference call between the staff and the applicant on May 20, 2009, RAI B.1.15-3 (ML091240344) was updated as follows:

Background

Program Element 4 of NUREG-1801 Section X.M1 is concerning detection of aging effects.

Under the Cooper Nuclear Station (CNS) Fatigue Monitoring Program, B.1.15 (CNS-RPT-LRD02, Revision 1), program element 4 subsection b states: No actions are taken as part of this program to detect aging effectsIf a design cycle assumption is approached, corrective action is taken which will include update of fatigue usage calculation, if necessary.

In addition, Program Element 5 of NUREG-1801 Section X.M1 is concerning monitoring and trending. Under the CNS Fatigue Monitoring Program, B.1.15 (CNS-RPT-LRD02, Revision 1),

Program Element 5, Subsection B, it states: The Fatigue Monitoring Program monitors the number of pressure and temperature transient cycles and periodically compares this cycle count with the design cycle count to ensure that fatigue sensitive components remain within their allowable design Issue Clarification is deemed necessary, as described below. Additionally, Element 5 indicates that only the feedwater nozzle will be monitored.

Request (a) Please provide the basis for why taking no action will achieve the goal of detecting aging effects.

(b) Please explain why design cycle can be used as a basis for detecting aging effects when the design transients do not include all thermal events actually experienced by the reactor coolant pressure boundary components, as discussed in RAI B.1.15-2.

(c) The license renewal application (LRA) states that the environmental fatigue analyses were performed based on the 60-year projected cycles and LRA Table 4.3-1 shows that the 60-year projected cycles for most of the transients are less than the design cycles.

ENCLOSURE 2

With these conditions in mind, components could have failed before the design cycles are approached. Provide justification that the design cycles can be used as criteria to detect aging effects.

(d) Generic Aging Lessons Learned (GALL) report, requires all high fatigue locations are monitored, not just at the most limiting location within the applicable NUREG/CR-6260 locations, as minimum. Please provide justification that CNS will monitor the feedwater nozzle only.

The applicant indicated understanding of this request for information.

RAI B.1.15-10 (Draft)

Based on the conference call between the staff and the applicant on May 20, 2009, RAI B.1.15-4 (ML091240344) was updated as follow:

Background

Program Element 6 of NUREG-1801 Section X.M1 is concerning acceptance criteria. Under the CNS Fatigue Monitoring Program, B.1.15 (CNS-RPT-LRD02, Revision 1), Program Element 6 Subsection B states: The Fatigue Monitoring Program acceptance criteria are that none of the transients exceeded the allowable numbers in USAR Table III-3-1 Issue Clarification is deemed necessary, as described below:

Request (a) Questions (b) and (c) of RAI B.1.15-3 apply here. Please explain accordingly.

(b) GALL Section X.M1 Element 6 requires maintaining fatigue usage below the design code limit considering environmental fatigue effects. CNS Fatigue Monitoring Program, Element 6 does not mention environmental fatigue effects. Please explain why.

The applicant indicated understanding of this request for information.

Letter to Nebraska Public Power District from T Tran, dated June 10, 2009 DISTRIBUTION:

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON MAY 20, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND NEBRASKA PUBLIC POWER DISTRICT, RELATED TO A CLARIFICATION ON CERTAIN REQUESTS FOR ADDITIONAL INFORMATION, FOR COOPER NUCLEAR STATION LICENSE RENEWAL HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlrResource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource T. Tran B. Maier (RIV)

E. Sayoc V. Dricks (RIV)

F. Lyon D. Chamberlain (RIV)

D. Roth (OGC) A. Vegel (RIV)

A. Jones (OGC) W. Walker (RIV)

N. Taylor (RIV) G. Miller (RIV)

E. Collins (RIV) G. Pick (RIV)

C. Casto (RIV) S. Burnell (RIV)

Cooper Power Station cc:

Mr. Ronald D. Asche Mr. H. Floyd Gilzow President and Chief Executive Officer Deputy Director for Policy Nebraska Public Power District Missouri Department of Natural Resources 1414 15th Street P.O. Box 176 Columbus, NE 68601 Jefferson City, MO 65102-0176 Mr. Gene Mace Senior Resident Inspector Nuclear Asset Manager U.S. Nuclear Regulatory Commission Nebraska Public Power District P.O. Box 218 P.O. Box 98 Brownville, NE 68321 Brownville, NE 68321 Regional Administrator, Region IV Mr. John C. McClure U.S. Nuclear Regulatory Commission Vice President and General Counsel 612 E. Lamar Blvd., Suite 400 Nebraska Public Power District Arlington, TX 76011-4125 P.O. Box 499 Columbus, NE 68602-0499 Director, Missouri State Emergency Management Agency Mr. David Van Der Kamp P.O. Box 116 Licensing Manager Jefferson City, MO 65102-0116 Nebraska Public Power District P.O. Box 98 Chief, Radiation and Asbestos Brownville, NE 68321 Control Section Kansas Department of Health Mr. Michael J. Linder, Director and Environment Nebraska Department of Environmental Bureau of Air and Radiation Quality 1000 SW Jackson P.O. Box 98922 Suite 310 Lincoln, NE 68509-8922 Topeka, KS 66612-1366 Chairman Ms. Melanie Rasmussen Nemaha County Board of Commissioners Radiation Control Program Director Nemaha County Courthouse Bureau of Radiological Health 1824 N Street Iowa Department of Public Health Auburn, NE 68305 Lucas State Office Building, 5th Floor 321 East 12th Street Ms. Julie Schmitt, Manager Des Moines, IA 50319 Radiation Control Program Nebraska Health & Human Services R&L Mr. Keith G. Henke, Planner Public Health Assurance Division of Community and Public Health 301 Centennial Mall, South Office of Emergency Coordination P.O. Box 95007 930 Wildwood P.O. Box 570 Lincoln, NE 68509-5007 Jefferson City, MO 65102

Cooper Power Station cc:

Mr. Art Zaremba, Director of Nuclear Garry Young Safety Assurance License Renewal Manager Nebraska Public Power District Entergy Nuclear P.O. Box 98 1448 S.R. 333, N-GSB-45 Brownville, NE 68321 Russellville, AK 72802 Mr. John F. McCann, Director Alan Cox Licensing, Entergy Nuclear Northeast License Renewal Technical Manager Entergy Nuclear Operations, Inc. Entergy Nuclear 440 Hamilton Avenue 1448 S.R. 333, N-GSB-45 White Plains, NY 10601-1813 Russellville, AK 72802 Stewart Minahan Dave Lach Vice President LRP Entergy Project Manager Nuclear and Chief Nuclear Officer Entergy Nuclear Cooper Nuclear Station 1448 S.R. 333, N-GSB-45 72676 - 648A Avenue Russellville, AK 72802 Brownville, NE 68321 Mike Boyce Cooper Strategic Initiatives Manager Cooper Nuclear Station 72676 - 648A Avenue Brownville, NE 68321 Dave Bremer License Renewal Project Manager Cooper Nuclear Station 72676 - 648A Avenue Brownville, NE 68321 Bill Victor License Renewal Project Licensing Lead Cooper Nuclear Station 72676 - 648A Avenue Brownville, NE 68321 Jim Loynes License Renewal Project Engineer Cooper Nuclear Station 72676 - 648A Avenue Brownville, NE 68321