ML100601032
| ML100601032 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde, Wolf Creek, Cooper, Arkansas Nuclear, Columbia, River Bend, Diablo Canyon, Waterford, South Texas, San Onofre, Comanche Peak, Fort Calhoun |
| Issue date: | 03/01/2010 |
| From: | Chamberlain D NRC/RGN-IV/DRP |
| To: | Frederick Brown Division of Inspection and Regional Support |
| References | |
| Download: ML100601032 (30) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION R E GI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 March 1, 2010 MEMORANDUM TO: Frederick Brown, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM:
Dwight D. Chamberlain, Director /RA AVegel for/
Division of Reactor Projects
SUBJECT:
CY 2009 BASELINE INSPECTION COMPLETION The purpose of this memorandum is to confirm that we completed 100 percent of the baseline inspection program at all Region IV plants in calendar year 2009 for which we were responsible.
This does not include portions of the 2009 baseline inspection program for which other NRC organizations are responsible. Attached is a table which provides the completion status of baseline procedures for all Region IV sites (IR Report 8a).
If you have any questions, or desire additional details, please contact me at 817-860-8248.
Enclosure:
ROP Procedure Completion by Site (IR Report 8a)
Frederick Brown Electronic cc w/enclosure:
Elmo Collins, RIV Dwight Chamberlain, RIV David Lew, RI Leonard Wert, RII Steve West, RIII Chuck Paulk, RIV James Isom, NRR File located: S:/DRS/TSB/Baseline Completion/CY 2009 Completion Memo ML SUNSI Rev Compl.
Yes No ADAMS Yes No Reviewer Initials CJP Publicly Avail Yes No Sensitive Yes No Sens. Type Initials CJP RIV:C:TSB D:DRS D:DRP MCHay RJCaniano DDChamberlain
/RA/
/RA/
/RA AVegel for/
02/26/2010 02/26/2010 02/26/2010 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax