Summary of Presubmittal Teleconference with Nebraska Public Power District Regarding Proposed Exemption from Appendix J of 10 CFR Part 50 for Cooper Nuclear Station
ML19204A245
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/25/2019
From: Thomas Wengert
Plant Licensing Branch IV
To: Dent J
Nebraska Public Power District (NPPD)
Wengert T, NRR/DORL/LPLIV, 415-4037
References
EPID L-2019-LRM-0047
Download: ML19204A245 (4)


Text

July 25, 2019 LICENSEE: Nebraska Public Power District FACILITY: Cooper Nuclear Station

SUBJECT:

SUMMARY

OF JULY 18, 2019, PRESUBMITTAL TELECONFERENCE WITH NEBRASKA PUBLIC POWER DISTRICT REGARDING PROPOSED EXEMPTION FROM APPENDIX J OF 10 CFR PART 50 FOR COOPER NUCLEAR STATION (EPID L-2019-LRM-0047)

On July 18, 2019, a Category 1 public meeting was held by teleconference between the U.S.

Nuclear Regulatory Commission (NRC) and Nebraska Public Power District (the licensee). The purpose of the meeting was to discuss a planned exemption request for Cooper Nuclear Station. The licensee plans to request an exemption from Appendix J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, of Title 10 of the Code of Federal Regulations (10 CFR) Part 50 that would align the frequency of the Appendix J Option B testing with the frequency of the testing performed for the inservice testing (IST) program in accordance with 10 CFR 50.55a(f), Preservice and inservice testing requirements.

The meeting notice and agenda, dated July 8, 2019, are available in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession No. ML19189A200. A list of meeting attendees is enclosed.

During the meeting, the licensee presented information describing the current testing it performs for the IST and 10 CFR Appendix J testing programs, and discussed its planned exemption request. The presentation slides can be found in ADAMS at Accession No. ML19196A345.

The NRC staff queried the licensee throughout the presentation and provided feedback concerning the appropriateness of an exemption request versus a license amendment request in this case. Specifically, the staff informed the licensee about the change process provisions in 10 CFR Appendix J, as a possible regulatory option to consider in lieu of an exemption request, depending on the licensees specific situation. The licensee indicated that it would review the regulation and consider this option, if applicable.

No regulatory decisions were made at this meeting. No members of the public participated in the meeting. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-4037, or by e-mail at Thomas.Wengert@nrc.gov.

/RA/

Thomas J. Wengert, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES JULY 18, 2019, TELECONFERENCE WITH NEBRASKA PUBLIC POWER DISTRICT TO DISCUSS A PROPOSED EXEMPTION REQUEST REGARDING APPENDIX J OPTION B TESTING SCHEDULE AND REQUIREMENTS COOPER NUCLEAR STATION Name Organization Thomas Wengert Nuclear Regulatory Commission (NRC)

Michael Farnan NRC Brian Lee NRC Steve Jones NRC Stewart Bailey NRC Shaun Anderson NRC Clinton Ashley NRC Troy Barker Nebraska Public Power District (NPPD)

Tom Robinson NPPD Dave Van Der Kamp NPPD Enclosure

Meeting Summary ML19204A245 OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME TWengert PBlechman RPascarelli TWengert DATE 7/25/19 7/25/19 7/25/19 7/25/19