Letter Sequence RAI |
---|
|
Results
Other: LR-N09-0162, PSEG Nuclear, Hope Creek Generating Station, Transmittal Letter, License Renewal Application, LR-N10-0234, 10 CFR 54.21(b) Review to Identify Any Current Licensing Basis (CLB) Changes Made Since Submittal of the License Renewal Application (LRA), ML092430373, ML092430374, ML092430384, ML092430386, ML092430387, ML092430388, ML092430389, ML092430390, ML092430484, ML092460442, ML092520185, ML092650382, ML092660174, ML092660447, ML100850462, ML101660452, ML102100544, ML111090416
|
MONTHYEARLR-N09-0191, Information to Support NRC Staff Review of the Application for Renewed Operating License2009-08-18018 August 2009 Information to Support NRC Staff Review of the Application for Renewed Operating License Project stage: Request ML0924303742009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 2 of 3 Project stage: Other ML0924303892009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix E Project stage: Other ML0924303842009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3 Through Appendix a Project stage: Other ML0924303862009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix B Project stage: Other ML0924303872009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix C Project stage: Other ML0924303902009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix F Project stage: Other ML0924304842009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3 of 3 Project stage: Other ML0924303882009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 3, Appendix D Project stage: Other LR-N09-0162, PSEG Nuclear, Hope Creek Generating Station, Transmittal Letter, License Renewal Application2009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, Transmittal Letter, License Renewal Application Project stage: Other ML0924303732009-08-18018 August 2009 PSEG Nuclear, Hope Creek Generating Station, License Renewal Application, Volume 1 of 3 Project stage: Other ML0924604422009-09-0303 September 2009 Delaware Citizen Comment on Salem Hope Creek License Renewal Application Project stage: Other ML0926601742009-09-0707 September 2009 Comment on License Renewal for Salem and Hope Creek Power Plants - Goodman Project stage: Other ML0926503822009-09-0808 September 2009 Citizen Comment on Salem Hope Creek License Renewal Application Project stage: Other ML0925201852009-09-0808 September 2009 Comments About Relicensing Salem and Hope Creek Reactors in Nj, Steven Hegedus Project stage: Other ML0926604472009-09-23023 September 2009 Hope Creek, E-mail from Ruth Panella Comments on License Renewal Project stage: Other ML1007704192010-03-17017 March 2010 Task Order No. 005 Under Delivery Order No. NRC-DR-03-09-061 Project stage: Acceptance Review ML1008504622010-04-0606 April 2010 Project Manager Change for the License Renewal of Hope Creek Generating Station Project stage: Other ML1009703502010-04-14014 April 2010 License Renewal Application - Request for Additional Information for Section 2.2.5, Boral Monitoring Program Project stage: RAI ML1007503312010-04-15015 April 2010 Request for Additional Information Regarding Scoping and Screening Results for the Hope Creek Generating Station (Tac ME1832) Project stage: RAI ML1010205112010-04-27027 April 2010 License Renewal Application - Request for Additional Information for Section 2.1, Scoping and Screening Methodology Project stage: RAI ML1010601552010-05-14014 May 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Identified During the Audit Project stage: RAI ML1013803162010-06-0101 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Section 3.3.2 Project stage: RAI ML1013806202010-06-0101 June 2010 Request for Additional Information Regarding Sections 4.6 and 4.7 of the Hope Creek Generating Station License Renewal Application Project stage: RAI ML1014501792010-06-0303 June 2010 Letter Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Project stage: RAI ML1013801492010-06-0707 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Section 3.5 Project stage: RAI ML1013705592010-06-0909 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Review Application Project stage: RAI ML1014600772010-06-10010 June 2010 Request for Additional Information for Salem Nuclear Generating Station Units 1 and 2 License Renewal Application (TAC ME1832 and ME1836) Project stage: RAI ML1013707612010-06-14014 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application Project stage: RAI ML1016104482010-06-22022 June 2010 RAI for the Review of the Hope Creek Generating Station License Renewal Application for Fire Protection Project stage: RAI LR-N10-0234, 10 CFR 54.21(b) Review to Identify Any Current Licensing Basis (CLB) Changes Made Since Submittal of the License Renewal Application (LRA)2010-06-24024 June 2010 10 CFR 54.21(b) Review to Identify Any Current Licensing Basis (CLB) Changes Made Since Submittal of the License Renewal Application (LRA) Project stage: Other ML1016601502010-06-25025 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Open Cycle Cooling Water System Program and Structures Project stage: RAI ML1015906752010-06-25025 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Section 4.3 Project stage: RAI ML1017500242010-06-29029 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Fiberglass Doors Project stage: RAI LR-N10-0211, Response to NRC Request for Additional Information, Dated June 3, 2010, Related to Sections 3.2.2, 3.3.2 and B.2.2.2 of License Renewal Application2010-06-30030 June 2010 Response to NRC Request for Additional Information, Dated June 3, 2010, Related to Sections 3.2.2, 3.3.2 and B.2.2.2 of License Renewal Application Project stage: Response to RAI ML1015804812010-06-30030 June 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Metal Fatigue of Reactor Coolant Pressure Boundary Program Project stage: RAI LR-N10-0242, Response to NRC Request for Additional Information, Dated June 9, 2010, Related to Sections 3.1.2 and 3.3.2 of License Renewal Application2010-07-0606 July 2010 Response to NRC Request for Additional Information, Dated June 9, 2010, Related to Sections 3.1.2 and 3.3.2 of License Renewal Application Project stage: Response to RAI LR-N10-0248, Response to NRC Request for Additional Information, Dated June 22, 2010, Related to Fire Protection License Renewal Application2010-07-19019 July 2010 Response to NRC Request for Additional Information, Dated June 22, 2010, Related to Fire Protection License Renewal Application Project stage: Response to RAI ML1020002932010-08-0303 August 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Bolting and Flow Element Project stage: RAI ML1015400542010-08-0606 August 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Buried Piping Inspection Program Project stage: RAI ML1020303982010-08-18018 August 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Primary Containment Valve Material Project stage: RAI ML1021005442010-08-19019 August 2010 Scoping and Screening Audit Summary Regarding Hope Creek Generating Station License Renewal Application Project stage: Other LR-N10-0317, Response to NRC Request for Additional Information Dated August 3, 2010, Related to Bolting and Flow Element, and Update to PSEG July 6, 2010, Response to NRC RAI Associated with RPV Leak Detection Line - License Renewal Application2010-08-26026 August 2010 Response to NRC Request for Additional Information Dated August 3, 2010, Related to Bolting and Flow Element, and Update to PSEG July 6, 2010, Response to NRC RAI Associated with RPV Leak Detection Line - License Renewal Application Project stage: Response to RAI ML1016604522010-09-0303 September 2010 Audit Report Regarding the Hope Creek Generating Station License Renewal Application Project stage: Other ML1027804222010-10-12012 October 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for Buried Piping Project stage: RAI ML1032805742010-12-13013 December 2010 Request for Additional Information for the Review of the Hope Creek Generating Station License Renewal Application for One Time Inspection and Selective Leaching Project stage: RAI ML1110904162011-05-0505 May 2011 Project Manager Change for the License Renewal of Hope Creek Generating Station Project stage: Other ML11144A2452011-06-10010 June 2011 Schedule Revision for the Review of the Hope Creek Generating Station License Renewal Application Project stage: Approval ML11117A2062011-07-20020 July 2011 Notice of Issuance of Renewed Facility Operating License No. NPF-57 for an Additional 20-Year Period Project stage: Request ML11116A1482011-07-20020 July 2011 Issuance of Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station Project stage: Approval 2010-06-24
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000272/20244032024-09-25025 September 2024 and Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) IR 05000272/20244022024-09-23023 September 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection LR-N24-0048, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary 2024-09-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24253A1942024-09-0909 September 2024 NRR E-mail Capture - Final Eeeb RAI - Hope Creek Amendment to Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML22006A3212022-01-0606 January 2022 NRR E-mail Capture - Final RAI - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML21300A0222021-10-27027 October 2021 Notification of Conduct of a Fire Protection Team Inspection ML21041A3972021-02-18018 February 2021 Request for Additional Information Revise Low Pressure Safety Limit to Address General Electric Part-21 Safety Communications (Non-Proprietary) ML20295A4922020-10-21021 October 2020 NRR E-mail Capture - Hope Creek - Final RAI Revise ECCS TS with Respect to HPCI System Inoperability (L-2020-LLA-0131) ML18263A1442018-09-12012 September 2018 NRR E-mail Capture - Final RAI from Apla: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18250A3142018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18150A6912018-05-30030 May 2018 NRR E-mail Capture - Hope Creek - Final RAI Revise TS to Adopt TSTF-542 ML18120A2482018-04-27027 April 2018 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000354/2018403 ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML17349A0812017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Reactor Systems Branch (Srxb) - Hope Creek Mur ML17348A9972017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A6242017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Human Factors Associated with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A6282017-11-21021 November 2017 NRR E-mail Capture - Draft Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17331A0072017-11-21021 November 2017 E-mail Regarding Final Eicb Request for Additional Information - Hope Creek Power Uprate ML17324A2602017-11-17017 November 2017 NRR E-mail Capture - Final Request for Additional Information - Hope Creek Mur Electrical Instrumentation and Controls ML17320A2152017-11-16016 November 2017 NRR E-mail Capture - Hope Creek Measurement Uncertainty Recapture Application Review - Electrical Engineering (Eeob) Request for Additional Information (L-2017-LLS-0002) ML17290B0132017-10-17017 October 2017 NRR E-mail Capture - Hope Creek Mur Request for Additional Information for Apla and Snpb ML17222A1652017-08-10010 August 2017 NRR E-mail Capture - Hope Creek: Final Request for Information, Pressure-Temperature Limit Report Request (MF9502) ML17181A1352017-06-29029 June 2017 NRR E-mail Capture - Request for Additional Information Related to Hope Creek and Salem Emergency Action Level Scheme Change License Amendment Request (MF9268/69/70) ML17164A4062017-06-13013 June 2017 NRR E-mail Capture - Hope Creek - Final Request for Additional Information Concerning ILRT (MF8462) ML17027A3282017-02-27027 February 2017 Request for Additional Information Regarding License Amendment Request to Permanently Extend Type a and Type C Leak Rate Test Frequencies ML16321A4642016-11-21021 November 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request for Additional Information Regarding License Amendment Request to Remove Certain Training Requirements ML16277A5142016-11-0303 November 2016 Request for Additional Information Regarding License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling ML16271A2052016-11-0202 November 2016 Request for Additional Information Regarding Request to Delete Technical Specifications Action Statement 3.4.2.1.b Associated with Stuck Open Safety/Relief Valves ML16231A4272016-08-24024 August 2016 Request for Additional Information Regarding Relief Request VR-02, Associated with the Fourth 10-Year Inservice Test Interval ML16217A4302016-08-17017 August 2016 Request for Additional Information Regarding Digital Power Range Neutron Monitoring System Upgrade ML16007A1742016-05-31031 May 2016 Request for Additional Information Regarding Review of Post-EPU Steam Dryer Stress Calculation Acoustic Circuit Model Software Error ML16089A0792016-05-0505 May 2016 Request for Additional Information Regarding Relief Requests GR-01, PR-01, PR-02, VR-01, and VR-02, Associated with the Fourth 10-Year Inservice Test Interval ML16124A5802016-05-0303 May 2016 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Redacted - Request for Additional Information Review of Security Plan Revision 17 Changes ML15055A3772015-03-10010 March 2015 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information Request to Update Appendix B to Renewed Facility Operating License DPR-70, DPR-75 and NPF-57 ML14197A6192014-07-24024 July 2014 and Salem Nuclear Generating Station, Units 1 and 2 - Request for Additional Information Regarding Cyber Security Plan Milestone 8 Implementation Schedule (Tac Nos. MF3384, MF3385 and MF3386) ML14168A2352014-07-0202 July 2014 Request for Additional Information Regarding Flooding Hazard Reevaluation ML13309B5922013-11-22022 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13168A2762013-08-12012 August 2013 Peach Bottom, Units 2 and 3, Request for Additional Information Decommissioning Funding Status Report (TAC No. MF2202; MF2227; MF2228) ML13193A2912013-07-22022 July 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) TAC MF1031 ML13204A2532013-07-19019 July 2013 Draft RAIs - Decommissioning Funding Status Report for Hope Creek and Peach Bottom ML13190A2212013-07-0202 July 2013 RAIs for Hope Creek Regarding Response to Order EA-12-051 ML13154A4952013-06-0404 June 2013 Rai'S Following Ifib Analysis of Pseg'S 2013 Decommissioning Funding Status Report for Hope Creek Generating Station ML12334A3102012-12-0505 December 2012 Request for Additional Information Request to Correct Technical Specification and Facility Operating License Editorial Items ML12310A1672012-11-0101 November 2012 Draft RAI to License Amendment Request Regarding Average Power Range Monitoring Operability Requirements in Operational Condition 5 ML1227901012012-10-0505 October 2012 Clarifying Information for Question No. 4 (with Attachment) ML12212A1032012-08-0808 August 2012 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information ML12216A1792012-08-0303 August 2012 Draft RAI Related to Request for Exemption from Certain Requirements of the Fitness for Duty Rule ML12213A6162012-07-30030 July 2012 Draft Request for Additional Information Related to Request for Exemption from Certain Requirements of the Fitness for Duty Rule ML1209002372012-03-29029 March 2012 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Draft Request for Additional Information ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding 2024-09-09
[Table view] |
Text
June 9, 2010 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P.O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE HOPE CREEK GENERATING STATION LICENSE RENEWAL APPLICATION (TAC NO ME1832)
Dear Mr. Joyce:
By letter dated August 18, 2009, as supplemented by letter dated January 23, 2009, Public Service Enterprise Group Nuclear, LLC, submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54) for renewal of Operating License No. NPF-57 for the Hope Creek Generating Station. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants. During its review, the staff has identified areas where additional information is needed to complete the review. The staffs request for additional information is included in the enclosure. Further requests for additional information may be issued in the future.
Items in the enclosure were provided to John Hufnagel and other members of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-2981 or by e-mail at bennett.brady@nrc.gov.
Sincerely,
/RA/
Bennett M. Brady, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosure:
As stated cc w/encl: See next page
ML101370559 OFFICE PM:DLR:RPB1 LA:DLR BC:DLR:RPB1 PM:DLR:RPB1 NAME B. Brady S. Figueroa B. Pham B. Brady DATE 5/25/10 5/18/10 5/28/10 6/09/10
Letter to T. Joyce from B. Brady dated June 9, 2010
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE HOPE CREEK GENERATING STATION LICENSE RENEWAL APPLICATION (TAC NO ME1832)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RdsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsOgcMailCenter Resource
BPham BBrady CEccleston REnnis CSanders BHarris, OGC ABurritt, RI RConte, RI MModes, RI DTifft, RI NMcNamara, RI
Hope Creek Generating Station cc:
Mr. Robert Braun Mr. Michael Gaffney Senior Vice President Nuclear Manager - Hope Creek Regulatory PSEG Nuclear LLC Assurance One Alloway Creek Neck Road PSEG Nuclear LLC Hancocks Bridge, NJ 08038 One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Brian Booth Director Nuclear Oversight Mr. Ali Fakhar PSEG Nuclear Manager, License Renewal P.O. Box 236 PSEG Nuclear LLC Hancocks Bridge, NJ 08038 One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. John Perry Station Vice President - Hope Creek Township Clerk PSEG Nuclear Lower Alloways Creek Township P.O. Box 236 Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Mr. Larry Wagner Mr. Paul Bauldauf, P.E., Asst. Director Plant Manager - Hope Creek Radiation Protection Programs PSEG Nuclear LLC NJ Department of Environmental One Alloway Creek Neck Road Protection and Energy, CN 415 Hancocks Bridge, NJ 08038 Trenton, NJ 08625-0415 Mr. Michael Gallagher Mr. Brian Beam Vice President - License Renewal Projects Board of Public Utilities Exelon Nuclear LLC 2 Gateway Center, Tenth Floor 200 Exelon Way Newark, NJ 07102 Kennett Square, PA 19348 Regional Administrator, Region I Mr. Jeffrie J. Keenan, Esquire U.S. Nuclear Regulatory Commission Manager - Licensing 475 Allendale Road PSEG Nuclear LLC King of Prussia, PA 19406 One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Mr. Paul Davison Vice President, Operations Support Mr. Gregory Sosson PSEG Nuclear LLC Director Corporate Engineering One Alloway Creek Neck Road PSEG Nuclear LLC Hancocks Bridge, NJ 08038 One Alloway Creek Neck Road Hancocks Bridge, NJ 08038
Hope Creek Generating Station cc:
Ms. Christine Neely Director - Regulator Affairs PSEG Nuclear LLC One Alloway Creek Neck Road Hancocks Bridge, NJ 08038 Senior Resident Inspector Hope Creek Generating Station U.S. Nuclear Regulatory Commission Drawer 0509 Hancocks Bridge, NJ 08038 Mr. Earl R. Gage Salem County Administrator Administration Building 94 Market Street Salem, NJ 08079
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE HOPE CREEK GENERATING STATION LICENSE RENEWAL APPLICATION (TAC NO ME1832)
RAI 3.1.2.2.4.1
Background:
Hope Creek Generating Station (HCGS) License Renewal Application (LRA) Subsection 3.1.2.2.4, Paragraph 1 Standard Review Plan-License Renewal (SRP-LR) Subsection 3.1.2.2.4, Paragraph 1 SRP-LR Appendix A, Subsection A.1.2.3.4, Paragraph 1 LRA Subsection 3.1.2.2.4, Paragraph 1, addresses cracking due to stress corrosion cracking (SCC) or intergranular stress corrosion cracking (IGSCC) that could occur in the stainless steel or nickel alloy BWR top head enclosure vessel flange leak detection lines. The LRA states that Hope Creek Generating Station (HCGS) will use aging management program (AMP) B.2.1.1, ASME Section XI Inservice Inspection, Subsections IWB, IWC and IWD (ISI) program, and AMP B.2.1.2, Water Chemistry, to manage the aging effects of cracking due to SCC or IGSCC in the stainless steel vessel flange leak detection line exposed to treated water. It also states that the HCGS ISI program uses a VT-2 visual examination of the line prior to reactor cavity drain down, as approved by a current relief request, prior to drain down during each refueling outage.
SRP-LR Subsection 3.1.2.2.4, Paragraph 1, and GALL Report item IV.A1-10 (R-61) states that a plant-specific AMP is to be evaluated because existing programs may not be capable of mitigating or detecting crack initiation and growth due to SCC in the vessel flange leak detection line.
SRP-LRA Appendix A, Subsection A.1.2.3.4, Paragraph 1, provides generic recommendations for the detection of aging effects program element of a plant-specific AMP. This paragraph states that detection of aging effects should occur before there is a loss of the structure and component intended function(s).
Issue:
The staff does not understand how a VT-2 visual examination of the vessel flange leak detection line, as described in the LRA, would be capable of detecting cracking in the line prior to a through-wall crack having occurred. Also, the relief request described in the LRA is approved only for the current ten-year ISI inspection interval, which does not extend into the period of extended operation; and there is no assurance that the relief request would either be made by HCGS or be approved by the staff during the period of extended operation.
ENCLOSURE
Request:
a) Explain how VT-2 examination will detect cracking in the vessel flange leak detection line prior to failure of the lines intended function of providing a reactor coolant pressure boundary.
b) Explain how aging of the vessel flange leak detection line will be managed during the period of extended operation without referring to implementation of a relief request which has neither been requested nor approved for the period of extended operation.
RAI 3.3.2.2.5.2
Background:
HCGS LRA Subsection 3.3.2.2.5, Paragraph 2; Table 3.3.1, Item 3.3.1-12; Table 3.5.2-8, pages 3.5-176 SRP-LR Subsection 3.3.2.2.5, Paragraph 2 GALL Item VII.A4-1 HCGS LRA Subsection 3.3.2.2.5, Paragraph 2, states that HCGS will implement the Structures Monitoring Program to manage hardening and loss of strength due to elastomer degradation of the compressible joint seals (inflatable pool seals) in the reactor building exposed to treated water, and that the Structures Monitoring Program includes visual inspections of elastomer components to assure that existing environmental conditions are not causing material degradation that could result in loss of component intended function. Table 3.3.1, item 3.3.1-12 states that compressible joint seals in the reactor building have been aligned to the item based on material, environment, and aging effect.
SRP-LR Subsection 3.3.2.2.5, Paragraph 2, applies for hardening and loss of strength due to elastomer degradation in elastomer linings of the filters, valves, and ion exchangers in spent fuel pool and cleanup systems (BWR and PWR) exposed to treated water or to treated borated water. GALL item VII.A4-1 associated with this SRP-LR paragraph recommends a plant-specific AMP that determines and assesses the qualified life of the linings in the environment is to be evaluated.
Issue:
Since the SRP recommends determination and assessment of a qualified life for the components associated with Subsection 3.3.2.2.5, Paragraph 2, it is not clear to the staff whether HCGS has determined a qualified life for the compressible joint seals (inflatable pool seals) that it has associated with this paragraph through the LRA Tables. It also is not clear whether visual inspection, alone, is capable of detecting hardening and loss of strength in the compressible joint seals that HCGS has associated with Subsection 3.3.2.2.5, Paragraph 2.
Request:
Provide additional information to explain how the Structures Monitoring Program adequately manages the subject aging effects. Specifically, clarify whether HCGS has determined a qualified life for the compressible joint seals aligned with LRA Table 3.3.1, Item 3.3.1-12, and Subsection 3.3.2.2.5, Paragraph 2.